Total Projects: 648

Active Projects: 278


Active Projects per county

Capacity by Generation Type

Network Upgrade Costs

(Per Megawatt)

Active Projects

Queue IDProject NameStatusCapacity (MW)Network Upgrade Cost ($/MW)Exact NumbersMost Recent Study Date

AG2-014

Active50<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-016

Active19.8<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-029

Active250$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-037

Active4.7<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-049

AlexandriaActive20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-057

Active10<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-061

Active50<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-062

Active147<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-068

Active100$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-069

Active150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-072

Active700$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-073

Active53$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-074

Active38<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-077

Active200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-081

Active30$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-082

Active200<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-086

OFW Solar FarmActive75$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-088

Active150$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-095

Active18<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-104

Active200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-106

Active150$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-107

Active150$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-109

Active40$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-114

Active100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-119

Active80<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-121

Active0N/A👉

Get exact numbers with GridTracker

10/29/2025

AG2-124

Active33.34<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-125

Active15.44<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-126

Active150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-151

Active100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-152

Active131$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-163

Active250<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-166

Active10$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-171

Active60$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-176

Active150$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-182

Active200$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-184

Active210<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-191

Active30<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-192

Active19<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-193

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-198

Active80$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-200

Active17$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-213

Active80$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-216

Active25.92<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-230

Active150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-236

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-238

Active0N/A👉

Get exact numbers with GridTracker

10/29/2025

AG2-240

Active0N/A👉

Get exact numbers with GridTracker

10/29/2025

AG2-245

Active210$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-248

Active100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-262

Active11<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-270

Active150$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-272

Active55<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-288

Active150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-289

Active66.6<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-290

Active38.4$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-297

Active19$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-298

Active35$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-300

Active100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-329

Active200<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-332

Active100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-339

Active85$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-341

Active50$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-343

Active100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-345

Active50<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-356

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-360

Active250<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-363

Active300$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-364

Active200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-369

Active86$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-370

Active50$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-380

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-382

Active70$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-384

Active60.82$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-401

Active44<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-405

Active10.98<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-406

Active10.98<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-411

Active63$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-420

Active25<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-423

Active80$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-424

Active63.25$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-426

Active33.5>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-429

GardeniaActive46.5$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-436

Active350$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-440

Active75$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-441

Active113$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-442

Active140$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-447

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-448

Active50$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-453

Active280$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-476

Cottontail Solar 2Active0.1<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-477

Cottontail Solar 8Active0.5<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-478

Cottontail Solar 1Active0.5<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-479

Active4.1<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-481

Active4.1<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-484

Active4.6<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-487

Active10.6<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-491

Active100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-492

Active50<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-516

Active120$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-518

Active80<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-519

Active66.5$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-522

Active80$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-524

Active110$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-544

Active200<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-545

Active400<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-548

Active80$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-550

Active100$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-551

Active50<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-561

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-562

Active52<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-566

Active30$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-568

Active80$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-570

Active400$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-571

Active100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-581

Active150$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-582

Active2100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-583

Active115$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-585

Active55<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-616

Active50$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-617

Active55$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-618

Active110<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-621

Active150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-625

Active19.6<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-626

Active12.5$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-637

Active150$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-657

Active90$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-659

Active80$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-660

Active20$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-661

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-665

Active80$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-675

Active80<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-004

Active40$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-033

Active19.5<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-040

Active150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-044

Active200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-054

Active8.25$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-055

Active220$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-057

Active7.2<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-059

Active21$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-060

Crossroads Solar IActive20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-071

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-072

Active20$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-073

Active20$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-091

Active0N/A👉

Get exact numbers with GridTracker

10/29/2025

AH1-098

Active40$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-106

360 Solar Center, LLCActive26<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-107

360 Solar Center, LLCActive26<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-108

Active9<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-124

Reid Energy CenterActive20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-125

Evergreen Energy CenterActive20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-127

Railroad Energy CenterActive20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-128

Bethlehem Energy CenterActive20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-133

Active70$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-138

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-144

Active70<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-145

Active80<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-150

Active200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-151

Active200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-153

Active50<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-165

Active72<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-170

Horsepen Creek Solar IActive20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-188

Active140$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-196

Active150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-206

Lafayette StorageActive60<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-216

Active99$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-220

Remington BESSActive60<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-221

Active45<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-223

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-227

Active51.3$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-239

Active80$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-247

Poseidon Solar 1Active40<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-248

Poseidon Solar 2Active25$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-249

Poseidon StorageActive80<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-251

Tavern Energy LLCActive50$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-254

Mount Storm RepowerActive171.4<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-257

Kober Solar FarmActive19.25$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-258

Port Belford Solar FarmActive19.25<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-260

Active300<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-261

Pulaski Energy StorageActive135<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-263

Active200<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-269

Active50<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-271

Active40$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-272

Active185$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-280

Active20$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-282

Active49.9$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-283

CPV Wilson SolarActive200$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-292

Active44<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-302

Active75<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-304

Active9.8<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-305

Active35.72<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-306

Active28.8<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-311

Active2.25<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-314

Active100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-327

Active8.44<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-328

Active21.3<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-334

Heritage Solar FarmActive19.25<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-338

Active180$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-341

Active150$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-343

CEP Solar, LLCActive69$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-345

Active14<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-348

Active10<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-387

CPV Capon Springs WindActive150$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-392

Active90$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-396

Active11.891$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-397

Active19.67<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-399

Active9.87<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-439

ACE Development Company, LLCActive85$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-452

McVille SolarActive19.9<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-460

Julius SolarActive66$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-461

Active80$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-482

Active78<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-528

Honeybee Solar, LLCActive300.8$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-535

Active100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-537

Active178.5$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-541

Active92.4$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-542

Green Camp Solar IIActive110$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-543

Active157.4$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-545

Cornerstone SolarActive200<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-546

Active65$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-552

Active670.2<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-563

Aurora Battery Storage IIActive150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-564

Active150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-567

Active5<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-570

Active25$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-571

Active20$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-580

Active200<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-617

Active200<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-637

Active16<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-641

Active15$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-661

Active10.07<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-664

Active100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-665

Active80$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-666

Active80$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-667

Active18<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-672

Active75$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-673

Active85$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-677

Active67<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-678

Active34<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-679

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-680

Active1300<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-681

Active27.3$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-682

Active21$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-683

Active25$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-684

Active23<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-685

Active26<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-686

Active24<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-687

Active51$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-691

Active26$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-692

Active26$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-693

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-694

Active18$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-695

Active859<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-696

Active94<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-698

Active130<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-699

Active58<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-701

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-702

Active88<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-703

Active35.61<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-704

Active24<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-706

Active30.453<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-710

Active256.8<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-711

Active408.2$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-712

Active776$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-713

Active14<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-714

Active169<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-715

Active127.17<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-716

Active650$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-718

Active11<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-719

Active24<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-721

Active786<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-722

Active130.4$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-723

Active776$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-725

Active500<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-727

Active425<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-734

Active270.3<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-744

Active53.5<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-746

Active20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

Withdrawn Projects

Queue IDProject NameStatusCapacity (MW)Network Upgrade Cost ($/MW)Exact NumbersMost Recent Study Date

AG2-005

Withdrawn20>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-008

Withdrawn60N/A👉

Get exact numbers with GridTracker

N/A

AG2-009

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-010

Hampton BESS 3Withdrawn100$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-020

Arnolds Corner Energy StorageWithdrawn7N/A👉

Get exact numbers with GridTracker

N/A

AG2-035

Withdrawn33N/A👉

Get exact numbers with GridTracker

N/A

AG2-053

Withdrawn300N/A👉

Get exact numbers with GridTracker

N/A

AG2-054

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AG2-063

Withdrawn54$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-080

Sand Dragon EnergyWithdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AG2-084

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AG2-085

Withdrawn40<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-090

Withdrawn14<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-091

Withdrawn6<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-092

Withdrawn11N/A👉

Get exact numbers with GridTracker

N/A

AG2-093

Withdrawn100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-094

Withdrawn150N/A👉

Get exact numbers with GridTracker

N/A

AG2-096

Withdrawn0N/A👉

Get exact numbers with GridTracker

N/A

AG2-098

Withdrawn0N/A👉

Get exact numbers with GridTracker

N/A

AG2-099

Withdrawn0N/A👉

Get exact numbers with GridTracker

N/A

AG2-100

Withdrawn0N/A👉

Get exact numbers with GridTracker

N/A

AG2-111

Withdrawn14.5$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-112

Withdrawn15.2$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-116

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AG2-120

Withdrawn21$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-130

Withdrawn55N/A👉

Get exact numbers with GridTracker

N/A

AG2-131

Withdrawn40N/A👉

Get exact numbers with GridTracker

N/A

AG2-132

Withdrawn15N/A👉

Get exact numbers with GridTracker

N/A

AG2-143

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-148

Withdrawn86<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-149

Withdrawn314$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-150

Withdrawn5.25N/A👉

Get exact numbers with GridTracker

N/A

AG2-159

Withdrawn61$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-161

Withdrawn43$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-162

Withdrawn115$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-164

Withdrawn270$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-165

Withdrawn200$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-179

Withdrawn60$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-181

Withdrawn28>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-188

Withdrawn140$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-189

Withdrawn19.8N/A👉

Get exact numbers with GridTracker

N/A

AG2-202

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-206

Withdrawn48$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-208

Withdrawn70<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-212

Withdrawn200$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-215

Withdrawn36.92$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-219

Withdrawn330$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-220

Withdrawn31$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-221

Withdrawn20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-228

Withdrawn11.2N/A👉

Get exact numbers with GridTracker

N/A

AG2-237

Withdrawn0N/A👉

Get exact numbers with GridTracker

10/29/2025

AG2-239

Withdrawn0N/A👉

Get exact numbers with GridTracker

10/29/2025

AG2-247

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-249

Withdrawn20$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-250

Withdrawn20$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-260

Withdrawn149N/A👉

Get exact numbers with GridTracker

N/A

AG2-279

Withdrawn20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-281

Withdrawn50$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-282

Withdrawn10N/A👉

Get exact numbers with GridTracker

N/A

AG2-284

Withdrawn150N/A👉

Get exact numbers with GridTracker

N/A

AG2-304

Withdrawn150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-310

Withdrawn100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-311

Withdrawn75$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-314

Withdrawn67N/A👉

Get exact numbers with GridTracker

N/A

AG2-320

Withdrawn150<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-327

Withdrawn10$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-328

Withdrawn200$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-330

Withdrawn200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-331

Withdrawn200$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-336

Withdrawn80N/A👉

Get exact numbers with GridTracker

N/A

AG2-337

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-338

Withdrawn40$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-344

Withdrawn100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-347

Withdrawn448.8$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-348

Withdrawn897.6N/A👉

Get exact numbers with GridTracker

N/A

AG2-354

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AG2-355

Withdrawn125N/A👉

Get exact numbers with GridTracker

N/A

AG2-357

Withdrawn250N/A👉

Get exact numbers with GridTracker

N/A

AG2-365

Withdrawn35$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-366

Withdrawn50>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-375

Withdrawn500N/A👉

Get exact numbers with GridTracker

N/A

AG2-378

Withdrawn20$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-379

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-385

Withdrawn54$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-386

Withdrawn30N/A👉

Get exact numbers with GridTracker

N/A

AG2-400

Withdrawn100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-402

Withdrawn50<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-403

Withdrawn125<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-404

Withdrawn250<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-408

Withdrawn18<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-418

Withdrawn40>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-427

Withdrawn85$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-428

Withdrawn170$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-430

Withdrawn60$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-438

Withdrawn10<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-439

Withdrawn9.8<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-444

Withdrawn163$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-449

Withdrawn120$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-450

Withdrawn219<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-451

Withdrawn240<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-454

Withdrawn300N/A👉

Get exact numbers with GridTracker

N/A

AG2-455

Withdrawn280N/A👉

Get exact numbers with GridTracker

N/A

AG2-456

Withdrawn80$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-457

Withdrawn80$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-458

Withdrawn1.89<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-459

Lakewood-Farmingdale Road Storage FacilityWithdrawn0.7<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-460

Withdrawn2<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-462

Withdrawn150N/A👉

Get exact numbers with GridTracker

N/A

AG2-466

Withdrawn330N/A👉

Get exact numbers with GridTracker

N/A

AG2-467

Withdrawn115N/A👉

Get exact numbers with GridTracker

N/A

AG2-469

Withdrawn80$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-498

Withdrawn50N/A👉

Get exact numbers with GridTracker

N/A

AG2-505

Withdrawn14>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-509

Withdrawn55N/A👉

Get exact numbers with GridTracker

N/A

AG2-515

Withdrawn100$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-527

Withdrawn200N/A👉

Get exact numbers with GridTracker

N/A

AG2-528

Withdrawn140N/A👉

Get exact numbers with GridTracker

N/A

AG2-531

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-532

Withdrawn20>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-533

Withdrawn20>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-534

Withdrawn20>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-535

Withdrawn20>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-538

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-541

Withdrawn65$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-542

Withdrawn70N/A👉

Get exact numbers with GridTracker

N/A

AG2-553

Withdrawn50$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-558

Withdrawn19.9N/A👉

Get exact numbers with GridTracker

N/A

AG2-559

Withdrawn19.9N/A👉

Get exact numbers with GridTracker

N/A

AG2-560

Withdrawn19.9N/A👉

Get exact numbers with GridTracker

N/A

AG2-564

Withdrawn49.99$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-575

Withdrawn100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-580

Withdrawn150N/A👉

Get exact numbers with GridTracker

N/A

AG2-587

Withdrawn50N/A👉

Get exact numbers with GridTracker

N/A

AG2-589

Withdrawn20$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-590

Withdrawn38.2N/A👉

Get exact numbers with GridTracker

N/A

AG2-594

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-595

Withdrawn65N/A👉

Get exact numbers with GridTracker

N/A

AG2-599

Withdrawn19.6N/A👉

Get exact numbers with GridTracker

N/A

AG2-600

Withdrawn19.6N/A👉

Get exact numbers with GridTracker

N/A

AG2-602

Withdrawn0N/A👉

Get exact numbers with GridTracker

N/A

AG2-603

Withdrawn77N/A👉

Get exact numbers with GridTracker

N/A

AG2-606

Withdrawn89N/A👉

Get exact numbers with GridTracker

N/A

AG2-607

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-615

Withdrawn100>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-627

Withdrawn40$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-631

Withdrawn150N/A👉

Get exact numbers with GridTracker

N/A

AG2-639

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-640

Withdrawn18.7N/A👉

Get exact numbers with GridTracker

N/A

AG2-646

Withdrawn200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-654

Withdrawn14.7<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-655

Withdrawn500N/A👉

Get exact numbers with GridTracker

N/A

AG2-658

Withdrawn210$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-668

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AG2-670

Withdrawn75$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AG2-690

Withdrawn300N/A👉

Get exact numbers with GridTracker

N/A

AH1-005

Withdrawn20$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-012

Withdrawn50$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-027

Withdrawn25$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-034

Scotland SolarWithdrawn100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-035

Withdrawn20$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-041

Withdrawn125N/A👉

Get exact numbers with GridTracker

N/A

AH1-042

Stony Run Solar Project, LLCWithdrawn154$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-045

Withdrawn23N/A👉

Get exact numbers with GridTracker

N/A

AH1-046

Withdrawn25N/A👉

Get exact numbers with GridTracker

N/A

AH1-047

Withdrawn58.6$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-050

Withdrawn50$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-051

Withdrawn30$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-056

Sugar Solar LLCWithdrawn100$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-065

Churchill Storage Solutions LLCWithdrawn20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-066

Churchill Storage Solutions LLCWithdrawn10<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-069

Withdrawn17$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-070

Withdrawn17$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-075

Withdrawn8$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-076

Withdrawn18N/A👉

Get exact numbers with GridTracker

N/A

AH1-081

Withdrawn60N/A👉

Get exact numbers with GridTracker

N/A

AH1-082

Withdrawn44N/A👉

Get exact numbers with GridTracker

N/A

AH1-083

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AH1-084

Withdrawn2500N/A👉

Get exact numbers with GridTracker

N/A

AH1-086

Summersweet Energy Center, LLCWithdrawn90<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-087

Summersweet Energy Center, LLCWithdrawn20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-088

Summersweet Energy Center, LLCWithdrawn20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-089

Summersweet Energy Center, LLCWithdrawn20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-092

Withdrawn90N/A👉

Get exact numbers with GridTracker

N/A

AH1-094

Norwalk Solar IWithdrawn49.9N/A👉

Get exact numbers with GridTracker

N/A

AH1-102

Withdrawn100$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-136

Withdrawn20$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-140

Withdrawn150$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-146

Withdrawn200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-147

Withdrawn200$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-148

Withdrawn200N/A👉

Get exact numbers with GridTracker

N/A

AH1-152

Withdrawn30N/A👉

Get exact numbers with GridTracker

N/A

AH1-154

Withdrawn30N/A👉

Get exact numbers with GridTracker

N/A

AH1-157

Withdrawn100$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-158

Withdrawn30$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-159

ASD Carmen PA2 SolarWithdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AH1-160

ASD Warner PA2 Solar LLCWithdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AH1-162

ASD Woodbury PA2 Solar IWithdrawn16N/A👉

Get exact numbers with GridTracker

N/A

AH1-163

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AH1-164

Withdrawn35$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-179

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AH1-185

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AH1-189

Withdrawn140N/A👉

Get exact numbers with GridTracker

N/A

AH1-197

Withdrawn7.1N/A👉

Get exact numbers with GridTracker

N/A

AH1-201

Mountain Ridge SolarWithdrawn40$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-203

Turnpike SolarWithdrawn70$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-205

Withdrawn16$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-212

Noels Creek SolarWithdrawn20$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-215

Withdrawn31.5$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-217

Withdrawn57$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-222

Withdrawn30N/A👉

Get exact numbers with GridTracker

N/A

AH1-226

Withdrawn115N/A👉

Get exact numbers with GridTracker

N/A

AH1-234

Withdrawn224$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-241

Energix Westmoreland LLCWithdrawn100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-255

Mount Storm Repower BESS 1Withdrawn240N/A👉

Get exact numbers with GridTracker

N/A

AH1-265

Winslow Landfill Solar FarmWithdrawn29.4$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-268

Clark Run Solar BESSWithdrawn36.6$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-274

Withdrawn16.7$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-281

Withdrawn20$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-285

Withdrawn86$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-290

Changewater Solar FarmWithdrawn19.25N/A👉

Get exact numbers with GridTracker

N/A

AH1-291

Withdrawn185N/A👉

Get exact numbers with GridTracker

N/A

AH1-294

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AH1-295

Withdrawn130N/A👉

Get exact numbers with GridTracker

N/A

AH1-296

Withdrawn60N/A👉

Get exact numbers with GridTracker

N/A

AH1-297

Withdrawn200N/A👉

Get exact numbers with GridTracker

N/A

AH1-298

Withdrawn75$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-307

Withdrawn50N/A👉

Get exact numbers with GridTracker

N/A

AH1-308

Withdrawn50<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-309

Withdrawn27<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-313

Nittany North SolarWithdrawn100$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-316

Withdrawn4.4N/A👉

Get exact numbers with GridTracker

N/A

AH1-318

Withdrawn60N/A👉

Get exact numbers with GridTracker

N/A

AH1-319

Sloopy StorageWithdrawn54N/A👉

Get exact numbers with GridTracker

N/A

AH1-320

Withdrawn69N/A👉

Get exact numbers with GridTracker

N/A

AH1-321

Withdrawn54N/A👉

Get exact numbers with GridTracker

N/A

AH1-323

Withdrawn100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-324

Withdrawn80$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-325

Withdrawn50N/A👉

Get exact numbers with GridTracker

N/A

AH1-331

McLane SolarWithdrawn19.9N/A👉

Get exact numbers with GridTracker

N/A

AH1-337

Withdrawn46$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-339

Withdrawn80$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-340

Preston County Solar ProjectWithdrawn48.89$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-352

Withdrawn40N/A👉

Get exact numbers with GridTracker

N/A

AH1-353

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AH1-354

Withdrawn40N/A👉

Get exact numbers with GridTracker

N/A

AH1-355

Carvers Creek LLCWithdrawn40N/A👉

Get exact numbers with GridTracker

N/A

AH1-356

Withdrawn30N/A👉

Get exact numbers with GridTracker

N/A

AH1-357

McKean Solar 1 - 20 MWWithdrawn20$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-358

McKean Solar 1 - Energy StorageWithdrawn20$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-359

McKean Solar 2 - 20 MWWithdrawn20$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-360

McKean Solar 2 - Energy StorageWithdrawn20$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-361

Withdrawn50N/A👉

Get exact numbers with GridTracker

N/A

AH1-367A

Iron Javelin EmeraldWithdrawn72<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-376

Trillium PV IWithdrawn28N/A👉

Get exact numbers with GridTracker

N/A

AH1-377

Keysville PV I, LLCWithdrawn186$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-378

Victoria PV I, LLCWithdrawn51N/A👉

Get exact numbers with GridTracker

N/A

AH1-380

Withdrawn20>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-390

THP Solar 1Withdrawn19.9N/A👉

Get exact numbers with GridTracker

N/A

AH1-391

Michiana SolarWithdrawn100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-408

Withdrawn120$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-426

Withdrawn64.6$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-426A

Withdrawn32.3$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-427

Withdrawn100$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-428

Withdrawn40N/A👉

Get exact numbers with GridTracker

N/A

AH1-429

Withdrawn90N/A👉

Get exact numbers with GridTracker

N/A

AH1-432

Withdrawn60N/A👉

Get exact numbers with GridTracker

N/A

AH1-434

ACE Development Company, LLCWithdrawn75N/A👉

Get exact numbers with GridTracker

N/A

AH1-440

ACE Development Company, LLCWithdrawn34N/A👉

Get exact numbers with GridTracker

N/A

AH1-446

Withdrawn65N/A👉

Get exact numbers with GridTracker

N/A

AH1-447

Withdrawn60N/A👉

Get exact numbers with GridTracker

N/A

AH1-462

Black Tulip StorageWithdrawn60N/A👉

Get exact numbers with GridTracker

N/A

AH1-463

Withdrawn65N/A👉

Get exact numbers with GridTracker

N/A

AH1-466

Withdrawn600N/A👉

Get exact numbers with GridTracker

N/A

AH1-467

Withdrawn300N/A👉

Get exact numbers with GridTracker

N/A

AH1-487

Maysville Solar 2Withdrawn20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-490

Tamarack Solar 1Withdrawn20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-491

Waterford Solar 1Withdrawn20<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-492

Grand View Solar IWithdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AH1-526

Echelon SolarWithdrawn80N/A👉

Get exact numbers with GridTracker

N/A

AH1-530

Withdrawn28N/A👉

Get exact numbers with GridTracker

N/A

AH1-533

Greenwood Solar IIWithdrawn96.2N/A👉

Get exact numbers with GridTracker

N/A

AH1-536

Withdrawn41.8$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-538

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AH1-539

Withdrawn129.4$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-540

Withdrawn165N/A👉

Get exact numbers with GridTracker

N/A

AH1-549

Withdrawn180N/A👉

Get exact numbers with GridTracker

N/A

AH1-557

Larrabee 230 kV IVWithdrawn1300N/A👉

Get exact numbers with GridTracker

N/A

AH1-558

Doswell Limited PartnershipWithdrawn250N/A👉

Get exact numbers with GridTracker

N/A

AH1-560

Withdrawn150N/A👉

Get exact numbers with GridTracker

N/A

AH1-561

Ironwood Battery StorageWithdrawn250N/A👉

Get exact numbers with GridTracker

N/A

AH1-562

Springdale Battery Storage IIWithdrawn250N/A👉

Get exact numbers with GridTracker

N/A

AH1-565

Troy Battery StorageWithdrawn250N/A👉

Get exact numbers with GridTracker

N/A

AH1-566

Armstrong Battery StorageWithdrawn250N/A👉

Get exact numbers with GridTracker

N/A

AH1-569

Withdrawn42N/A👉

Get exact numbers with GridTracker

N/A

AH1-572

Withdrawn30N/A👉

Get exact numbers with GridTracker

N/A

AH1-573

Withdrawn19.99N/A👉

Get exact numbers with GridTracker

N/A

AH1-577

Withdrawn70<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-578

Withdrawn28<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-584

Withdrawn50>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-585

Withdrawn50>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-586

Withdrawn45>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-587

Wild Hollow SolarWithdrawn200$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-588

McKean County Solar IIWithdrawn240$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-589

Wild Sky StorageWithdrawn170$1M - $1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-590

Messenger Brothers Solar IWithdrawn50N/A👉

Get exact numbers with GridTracker

N/A

AH1-591

Messenger Brothers Solar IIWithdrawn50N/A👉

Get exact numbers with GridTracker

N/A

AH1-592

Messenger Brothers StorageWithdrawn45N/A👉

Get exact numbers with GridTracker

N/A

AH1-626

Withdrawn62.5N/A👉

Get exact numbers with GridTracker

N/A

AH1-627

Withdrawn62.5N/A👉

Get exact numbers with GridTracker

N/A

AH1-634

Withdrawn68<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-644

Withdrawn100$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-668

Withdrawn19.9N/A👉

Get exact numbers with GridTracker

N/A

AH1-669

Withdrawn50$300K - $750K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-670

Withdrawn250$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-674

Withdrawn1700N/A👉

Get exact numbers with GridTracker

N/A

AH1-675

Withdrawn2175N/A👉

Get exact numbers with GridTracker

N/A

AH1-676

Withdrawn1294.6$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-688

Withdrawn1450N/A👉

Get exact numbers with GridTracker

N/A

AH1-689

Withdrawn1450N/A👉

Get exact numbers with GridTracker

N/A

AH1-690

Withdrawn1475$750K - $1M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-697

Withdrawn39N/A👉

Get exact numbers with GridTracker

N/A

AH1-700

Withdrawn55N/A👉

Get exact numbers with GridTracker

N/A

AH1-705

Withdrawn32.4<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-707

Withdrawn30>$1.5M / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-708

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AH1-709

Withdrawn80N/A👉

Get exact numbers with GridTracker

N/A

AH1-717

Withdrawn85$150K - $300K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-720

Withdrawn60<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-724

Withdrawn650N/A👉

Get exact numbers with GridTracker

N/A

AH1-726

Withdrawn600N/A👉

Get exact numbers with GridTracker

N/A

AH1-728

Withdrawn185N/A👉

Get exact numbers with GridTracker

N/A

AH1-729

Withdrawn100<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-730

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AH1-731

Withdrawn107N/A👉

Get exact numbers with GridTracker

N/A

AH1-732

Withdrawn50N/A👉

Get exact numbers with GridTracker

N/A

AH1-733

Withdrawn637.8N/A👉

Get exact numbers with GridTracker

N/A

AH1-735

Withdrawn19<$150K / MW👉

Get exact numbers with GridTracker

10/29/2025

AH1-736

Withdrawn300N/A👉

Get exact numbers with GridTracker

N/A

AH1-737

Withdrawn200N/A👉

Get exact numbers with GridTracker

N/A

AH1-738

Withdrawn200N/A👉

Get exact numbers with GridTracker

N/A

AH1-739

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AH1-740

Withdrawn770N/A👉

Get exact numbers with GridTracker

N/A

AH1-741

Withdrawn115N/A👉

Get exact numbers with GridTracker

N/A

AH1-742

Withdrawn20N/A👉

Get exact numbers with GridTracker

N/A

AH1-743

Withdrawn333.78N/A👉

Get exact numbers with GridTracker

N/A

AH1-745

Withdrawn770N/A👉

Get exact numbers with GridTracker

N/A

AH1-747

Withdrawn300N/A👉

Get exact numbers with GridTracker

N/A

AH1-748

Withdrawn3.2N/A👉

Get exact numbers with GridTracker

N/A

AH1-749

Withdrawn216N/A👉

Get exact numbers with GridTracker

N/A

AH1-750

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AH1-751

Withdrawn150N/A👉

Get exact numbers with GridTracker

N/A

AH1-752

Withdrawn400N/A👉

Get exact numbers with GridTracker

N/A

AH1-753

Withdrawn455N/A👉

Get exact numbers with GridTracker

N/A

AH1-754

Withdrawn500N/A👉

Get exact numbers with GridTracker

N/A

AH1-755

Withdrawn330N/A👉

Get exact numbers with GridTracker

N/A

AH1-756

Withdrawn250N/A👉

Get exact numbers with GridTracker

N/A

AH1-757

Withdrawn500N/A👉

Get exact numbers with GridTracker

N/A

AH1-758

Withdrawn500N/A👉

Get exact numbers with GridTracker

N/A

AH1-759

Withdrawn600N/A👉

Get exact numbers with GridTracker

N/A

AH1-760

Withdrawn31N/A👉

Get exact numbers with GridTracker

N/A

AH1-761

Withdrawn71N/A👉

Get exact numbers with GridTracker

N/A

AH1-762

Withdrawn225N/A👉

Get exact numbers with GridTracker

N/A

AH1-763

Withdrawn100N/A👉

Get exact numbers with GridTracker

N/A

AH1-764

Withdrawn148N/A👉

Get exact numbers with GridTracker

N/A

AH1-765

Withdrawn205N/A👉

Get exact numbers with GridTracker

N/A

AH1-766

Withdrawn205N/A👉

Get exact numbers with GridTracker

N/A

AH1-767

Withdrawn140N/A👉

Get exact numbers with GridTracker

N/A

AH1-768

Withdrawn110N/A👉

Get exact numbers with GridTracker

N/A

AH1-769

Withdrawn105N/A👉

Get exact numbers with GridTracker

N/A

AH1-770

Withdrawn184N/A👉

Get exact numbers with GridTracker

N/A

Interconnection.fyi
Tracking U.S. ISO & utility interconnection queues

Stay up to date via our email newsletter:

Interconnection queue requests/projects in list format

All transmission grid interconnection queue requests/projects All distribution grid (DG) interconnection queue requests/projects Data center projects by state EIA860 planned and operational power plant projects

Insights

Charts State of interconnection queues — January 2024In 2024, interconnection queues shrank for the first time in yearsAll insights

Other energy & climate tools

Inflation Reduction Act Bill Text Viewer ToolClimate Tech Jobs Tracker (30,000+ jobs)Climate Tech Hiring Trends & ChartsBuy/Sell Surplus Transformers

Queue requests/projects by U.S. state


Queue requests/projects by Canadian province

Queue requests/projects by project type

GenerationLoadReplacementSurplusTransmissionUpgrade

Data Centers

All data center projects

By U.S. State

Interconnection queue requests/projects by transmission owner

Alberta Electric System OperatorAllegheny PowerAlliant Energy EastAlliant Energy WestAmeren IllinoisAmeren MissouriAmerican Electric PowerAmerican Municipal PowerAmerican Transmission CompanyAmerican Transmission SystemsArizona Public ServiceArkansas Electric Cooperative CorporationAssociated Electric CooperativeAvista UtilitiesBC HydroBaltimore Gas and ElectricBangor Hydro ElectricBasin Electric Power CooperativeBig Rivers Electric CorporationBlack Hills Cheyenne Light Fuel and Power TransmissionBlack Hills Colorado ElectricBlack Hills PowerBonneville Power AdministrationCedar Falls UtilitiesCentral Hudson Gas and ElectricCentral Maine PowerCentral Power Electric CooperativeChelan County Public Utility DistrictCity Utilities of Springfield MissouriCity Water, Light and PowerCity of Columbia, MissouriCity of Muscatine, IowaCleco HoldingsColorado River Storage Project TransmissionColorado Springs UtilitiesCommonwealth EdisonConsolidated EdisonConsumers EnergyCooperative EnergyCorn Belt Power CooperativeDCR TransmissionDairyland Power CooperativeDayton Power and LightDelmarva Power and LightDesertLinkDominion EnergyDominion Energy South CarolinaDuke EnergyDuke Energy CarolinasDuke Energy FloridaDuke Energy IndianaDuke Energy Ohio and KentuckyDuke Energy ProgressDuquesne Light CompanyEast Kentucky Power CooperativeEast River Electric Power CooperativeEast Texas Electric CooperativeEl Paso ElectricEmpire District Electric CompanyEntergyEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasEssential PowerEvergyEvergy Missouri WestEversourceEwington Energy SystemsFarmington Electric Utility SystemFirstEnergyFlorida Power and LightGeorgia TransmissionGrand River Dam AuthorityGrand River EnergyGrant County Public Utility DistrictGridLianceGridLiance WestGridUnityHenderson Municipal Power and LightHoosier EnergyHorizon West TransmissionHydro-QuébecIMEUISO New EnglandITC Great PlainsITC MidwestITC TransmissionIdaho Power CompanyImperial Irrigation DistrictIndependence Power and LightIndependent Electricity System OperatorIndianapolis Power and LightJacksonville Electric AuthorityJersey Central Power and LightKACYKansas City Board of Public UtilitiesKansas City Power and LightKansas Power PoolLS PowerLS Power Grid New YorkLafayette Utilities SystemLea County Electric CooperativeLincoln Electric System
Long Island Power AuthorityLos Angeles Department of Water and PowerLouisville Gas and Electric and Kentucky Utilities EnergyLoveland Area Projects TransmissionLower Yellowstone Rural Electric CooperativeMadison Gas and ElectricMaine Public ServiceManitoba HydroMetropolitan Edison CompanyMichigan Electric Transmission CompanyMichigan Public Power AgencyMid-Kansas Electric CompanyMidAmerican EnergyMidcontinent Independent System OperatorMidwest EnergyMinnesota Municipal Power AgencyMinnesota PowerMinnkota Power CooperativeMissouri River Energy ServicesMissouri Western Energy CorporationMontana-Dakota UtilitiesMunicipal Commission of BoonvilleNAEANB PowerNV EnergyNational GridNavajo-CrystalNebraska Public Power DistrictNew York Power AuthorityNew York State Electric and GasNew York TranscoNextEra Energy TransmissionNextEra Energy Transmission SouthwestNorthWestern EnergyNortheast UtilitiesNorthern Indiana Public ServiceNorthern States Power CompanyNorthwest Iowa Power CooperativeNorthwestern Wisconsin Electric CompanyNova Scotia PowerOhio Valley Electric CorporationOklahoma Gas and ElectricOld Dominion Electric CooperativeOmaha Public Power DistrictOrange and RocklandOrlando Utilities CommissionOtter Tail Power CompanyPECO Energy CompanyPJMPPL CorporationPacifiCorpPacific Gas and Electric CompanyPennsylvania Electric CompanyPeople's Electric CooperativePlatte River Power AuthorityPortland General ElectricPotomac Electric Power CompanyPrairie PowerPublic Service Company Of ColoradoPublic Service Company of New MexicoPublic Service Electric and GasPuget Sound EnergyRochester Gas and ElectricRochester Public UtilitiesRockland Electric CompanySacramento Municipal Utility DistrictSalt River ProjectSam Houston Electric CooperativeSan Diego Gas and ElectricSantee CooperSaskPowerSeminole Electric CooperativeSouth Mississippi Electric Power AssociationSouthern California EdisonSouthern CompanySouthern Illinois Power CooperativeSouthern Indiana Gas and Electric CompanySouthern Maryland Electric CooperativeSouthern Minnesota Municipal Power AgencySouthwestern Power AdministrationSouthwestern Public Service CompanySunflower Electric Power CorporationTacoma Public UtilitiesTampa Electric CompanyTennessee Valley AuthorityTransource MissouriTri-State Generation and Transmission AssociationTucson Electric PowerUnited Gas Improvement CompanyUnited Illuminating CompanyUpper Peninsula Power CompanyValley Electric AssociationVillage of ArcadeWAPA Sierra NevadaWAPA/BEPC/HCPD Integrated SystemWabash Valley Power AssociationWestar EnergyWestern Area Power AdministrationWestern Area Power Administration Desert Southwest RegionWestern Farmers Electric CooperativeWisconsin Electric Power CompanyWisconsin Public Service CorporationWolverine Power Supply CooperativeXcel Energy

© 2026 Interconnection.fyi. All rights reserved.

GridTracker by Interconnection.fyi

Full access to the data

See all the data

Find relevant dockets and filings

Track data center builds