Georgia Power Co
153 Projects • 23.09 GW Total Capacity • 2 States
Georgia Power Co Geographic Footprint Map
Looking for projects still in development?
EIA 860M shows operational plants and those starting operation within one year. Our Interconnection Queue dataset tracks 30,000+ projects from application through commercial operation.
| Project Name | State | County | Status | Capacity (MW) | Generation Type | Developer |
|---|---|---|---|---|---|---|
| Vogtle (1) | GA | Burke | Operational | 1.21 GW | Nuclear | Georgia Power Co |
| Vogtle (2) | GA | Burke | Operational | 1.21 GW | Nuclear | Georgia Power Co |
| Vogtle (3) | GA | Burke | Operational | 1.11 GW | Nuclear | Georgia Power Co |
| Vogtle (4) | GA | Burke | Operational | 1.11 GW | Nuclear | Georgia Power Co |
| Bowen (3) | GA | Bartow | Operational | 952 MW | Coal | Georgia Power Co |
| Bowen (4) | GA | Bartow | Operational | 952 MW | Coal | Georgia Power Co |
| Edwin I Hatch (1) | GA | Appling | Operational | 924 MW | Nuclear | Georgia Power Co |
| Edwin I Hatch (2) | GA | Appling | Operational | 924 MW | Nuclear | Georgia Power Co |
| Scherer (1) | GA | Monroe | Operational | 891 MW | Coal | Georgia Power Co |
| Scherer (2) | GA | Monroe | Operational | 891 MW | Coal | Georgia Power Co |
| Scherer (3) | GA | Monroe | Operational | 891 MW | Coal | Georgia Power Co |
| Bowen (1) | GA | Bartow | Operational | 805.8 MW | Coal | Georgia Power Co |
| Bowen (2) | GA | Bartow | Operational | 788.8 MW | Coal | Georgia Power Co |
| Yates (10) | GA | Coweta | Planned | 482.8 MW | Gas | Georgia Power Co |
| Yates (8) | GA | Coweta | Planned | 482.8 MW | Gas | Georgia Power Co |
| Yates (9) | GA | Coweta | Planned | 482.8 MW | Gas | Georgia Power Co |
| Yates (6) | GA | Coweta | Operational | 403.7 MW | Gas | Georgia Power Co |
| Yates (7) | GA | Coweta | Operational | 403.7 MW | Gas | Georgia Power Co |
| Jack McDonough (4) | GA | Cobb | Operational | 369 MW | Gas | Georgia Power Co |
| Jack McDonough (5) | GA | Cobb | Operational | 369 MW | Gas | Georgia Power Co |
| Jack McDonough (6) | GA | Cobb | Operational | 369 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (10ST) | GA | Effingham | Operational | 281.9 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (11ST) | GA | Effingham | Operational | 281.9 MW | Gas | Georgia Power Co |
| Jack McDonough (5ACT) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (5BCT) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (6ACT) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (6BCT) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (CT4A) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (CT4B) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| McGrau Ford Battery Storage Facility (1) | GA | Cherokee | Planned | 265 MW | Battery | Georgia Power Co |
| McGrau Ford Battery Storage Facility (2) | GA | Cherokee | Planned | 265 MW | Battery | Georgia Power Co |
| McIntosh Combined Cycle Facility (C10A) | GA | Effingham | Operational | 203.2 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (C10B) | GA | Effingham | Operational | 203.2 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (C11A) | GA | Effingham | Operational | 203.2 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (C11B) | GA | Effingham | Operational | 203.2 MW | Gas | Georgia Power Co |
| Robins Air Force Base Solar (1) | GA | Bibb | Operational | 128 MW | Solar | Georgia Power Co |
| Robins Air Force Base Solar (2) | GA | Bibb | Planned | 128 MW | Battery | Georgia Power Co |
| McIntosh (CT1) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT2) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT3) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT4) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT5) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT6) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT7) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT8) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| Robins (1) | GA | Houston | Operational | 91.9 MW | Oil | Georgia Power Co |
| Robins (2) | GA | Houston | Operational | 91.9 MW | Oil | Georgia Power Co |
| McManus (4A) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4B) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4C) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4D) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4E) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4F) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| Mossy Branch Battery Facility (BESS) | GA | Talbot | Operational | 65 MW | Battery | Georgia Power Co |
| Hammond (5) | GA | Floyd | Planned | 57.5 MW | Battery | Georgia Power Co |
| Wallace Dam (3) | GA | Hancock | Operational | 56.2 MW | Hydro | Georgia Power Co |
| Wallace Dam (4) | GA | Hancock | Operational | 56.2 MW | Hydro | Georgia Power Co |
| McManus (3A) | GA | Glynn | Operational | 55.4 MW | Oil | Georgia Power Co |
| McManus (3B) | GA | Glynn | Operational | 55.4 MW | Oil | Georgia Power Co |
| McManus (3C) | GA | Glynn | Operational | 55.4 MW | Oil | Georgia Power Co |
| Bartletts Ferry (5) | AL | Lee | Operational | 54 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (6) | AL | Lee | Operational | 54 MW | Hydro | Georgia Power Co |
| Wilson (5A) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5B) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5C) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5D) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5E) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5F) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wallace Dam (1) | GA | Hancock | Operational | 52.2 MW | Pumped Storage | Georgia Power Co |
| Wallace Dam (2) | GA | Hancock | Operational | 52.2 MW | Pumped Storage | Georgia Power Co |
| Wallace Dam (5) | GA | Hancock | Operational | 52.2 MW | Pumped Storage | Georgia Power Co |
| Wallace Dam (6) | GA | Hancock | Operational | 52.2 MW | Pumped Storage | Georgia Power Co |
| Moody Air Force Base Solar (1) | GA | Lowndes | Operational | 49.5 MW | Solar | Georgia Power Co |
| Moody Air Force Base Solar (2) | GA | Lowndes | Planned | 49.5 MW | Battery | Georgia Power Co |
| Jack McDonough (3A) | GA | Cobb | Operational | 41.8 MW | Oil | Georgia Power Co |
| Jack McDonough (3B) | GA | Cobb | Operational | 41.8 MW | Oil | Georgia Power Co |
| Marine Corps Logistics Base Solar (1) | GA | Dougherty | Operational | 31 MW | Solar | Georgia Power Co |
| Fort Benning Solar Facility (1) | AL | Russell | Operational | 30 MW | Solar | Georgia Power Co |
| Fort Gordon Solar Facility (1) | GA | Richmond | Operational | 30 MW | Solar | Georgia Power Co |
| Kings Bay Solar Facility (1) | GA | Camden | Operational | 30 MW | Solar | Georgia Power Co |
| Fort Stewart Solar Facility (1) | GA | Liberty | Operational | 30 MW | Solar | Georgia Power Co |
| Sinclair Dam (1) | GA | Baldwin | Operational | 22.5 MW | Hydro | Georgia Power Co |
| Sinclair Dam (2) | GA | Baldwin | Operational | 22.5 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (4) | AL | Lee | Operational | 20 MW | Hydro | Georgia Power Co |
| Oliver Dam (1) | GA | Muscogee | Operational | 18 MW | Hydro | Georgia Power Co |
| Oliver Dam (2) | GA | Muscogee | Operational | 18 MW | Hydro | Georgia Power Co |
| Oliver Dam (3) | GA | Muscogee | Operational | 18 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (1) | AL | Lee | Operational | 15 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (2) | AL | Lee | Operational | 15 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (3) | AL | Lee | Operational | 15 MW | Hydro | Georgia Power Co |
| Tallulah Falls (1) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (2) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (3) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (4) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (5) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (6) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tugalo (1) | GA | Habersham | Operational | 11.2 MW | Hydro | Georgia Power Co |
| Tugalo (2) | GA | Habersham | Operational | 11.2 MW | Hydro | Georgia Power Co |
| Tugalo (3) | GA | Habersham | Operational | 11.2 MW | Hydro | Georgia Power Co |
| Tugalo (4) | GA | Habersham | Operational | 11.2 MW | Hydro | Georgia Power Co |
| Fort Valley State University Solar (1) | GA | Peach | Operational | 10.8 MW | Solar | Georgia Power Co |
| McIntosh Solar (1) | GA | Effingham | Operational | 10 MW | Solar | Georgia Power Co |
| Goat Rock (7) | AL | Lee | Operational | 9.3 MW | Hydro | Georgia Power Co |
| Goat Rock (8) | AL | Lee | Operational | 9.3 MW | Hydro | Georgia Power Co |
| North Highlands (1) | GA | Muscogee | Operational | 9.2 MW | Hydro | Georgia Power Co |
| North Highlands (2) | GA | Muscogee | Operational | 9.2 MW | Hydro | Georgia Power Co |
| North Highlands (3) | GA | Muscogee | Operational | 9.2 MW | Hydro | Georgia Power Co |
| Terrora (1) | GA | Rabun | Operational | 8 MW | Hydro | Georgia Power Co |
| Terrora (2) | GA | Rabun | Operational | 8 MW | Hydro | Georgia Power Co |
| Yonah (1) | GA | Stephens | Operational | 7.5 MW | Hydro | Georgia Power Co |
| Yonah (2) | GA | Stephens | Operational | 7.5 MW | Hydro | Georgia Power Co |
| Yonah (3) | GA | Stephens | Operational | 7.5 MW | Hydro | Georgia Power Co |
| Dalton 2 (1) | GA | Murray | Operational | 6.5 MW | Solar | Georgia Power Co |
| Oliver Dam (4) | GA | Muscogee | Operational | 6 MW | Hydro | Georgia Power Co |
| Goat Rock (3) | AL | Lee | Operational | 5 MW | Hydro | Georgia Power Co |
| Goat Rock (4) | AL | Lee | Operational | 5 MW | Hydro | Georgia Power Co |
| Goat Rock (5) | AL | Lee | Operational | 5 MW | Hydro | Georgia Power Co |
| Goat Rock (6) | AL | Lee | Operational | 5 MW | Hydro | Georgia Power Co |
| Guyton Community Solar (1) | GA | Effingham | Operational | 3.6 MW | Solar | Georgia Power Co |
| Burton Dam (1) | GA | Rabun | Operational | 3 MW | Hydro | Georgia Power Co |
| Burton Dam (2) | GA | Rabun | Operational | 3 MW | Hydro | Georgia Power Co |
| Wilson (IC1) | GA | Burke | Operational | 2.6 MW | Oil | Georgia Power Co |
| Waynesboro Community Solar (1) | GA | Burke | Operational | 2.4 MW | Solar | Georgia Power Co |
| Lloyd Shoals (1) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (2) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (3) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (4) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (5) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (6) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (1) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (2) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (3) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (4) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (5) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (6) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (7) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Nacoochee (1) | GA | Rabun | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Nacoochee (2) | GA | Rabun | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Comer Solar (1) | GA | Madison | Operational | 2 MW | Solar | Georgia Power Co |
| McManus (IC1) | GA | Glynn | Operational | 2 MW | Oil | Georgia Power Co |
| North Highlands (4) | GA | Muscogee | Operational | 2 MW | Hydro | Georgia Power Co |
| Flint River (1) | GA | Dougherty | Operational | 1.8 MW | Hydro | Georgia Power Co |
| Flint River (2) | GA | Dougherty | Operational | 1.8 MW | Hydro | Georgia Power Co |
| Flint River (3) | GA | Dougherty | Operational | 1.8 MW | Hydro | Georgia Power Co |
| Tri-County Solar Facility (PV1) | GA | Putnam | Operational | 1 MW | Solar | Georgia Power Co |
| Tech Square Microgrid (DG1) | GA | Fulton | Operational | 0.6 MW | Oil | Georgia Power Co |
| Atlanta Falcons Solar (3) | GA | Fulton | Operational | 0.5 MW | Solar | Georgia Power Co |
| Atlanta Falcons Solar (1) | GA | Fulton | Operational | 0.3 MW | Solar | Georgia Power Co |
| Atlanta Falcons Solar (2) | GA | Fulton | Operational | 0.2 MW | Solar | Georgia Power Co |
| Tech Square Microgrid (BESS1) | GA | Fulton | Operational | 0.2 MW | Battery | Georgia Power Co |
| Tech Square Microgrid (FC1) | GA | Fulton | Operational | 0.2 MW | Gas | Georgia Power Co |
| Tech Square Microgrid (NGE1) | GA | Fulton | Operational | 0.2 MW | Gas | Georgia Power Co |
| Tech Square Microgrid (NGE2) | GA | Fulton | Operational | 0.2 MW | Gas | Georgia Power Co |
Data source: U.S. Energy Information Administration EIA Form 860M
Stay up to date via our email newsletter:
Interconnection queue requests/projects in list format
All transmission grid interconnection queue requests/projects All distribution grid (DG) interconnection queue requests/projects Data center projects by state EIA860 planned and operational power plant projectsInsights
Charts State of interconnection queues — January 2024In 2024, interconnection queues shrank for the first time in yearsAll blog postsOther energy & climate tools
Inflation Reduction Act Bill Text Viewer ToolClimate Tech Jobs Tracker (30,000+ jobs)Climate Tech Hiring Trends & ChartsQueue requests/projects by country
Queue requests/projects by power market
Queue requests/projects by status
Queue requests/projects by cluster
Queue requests/projects by U.S. state
Queue requests/projects by Canadian province
Data Centers
All data center projectsBy U.S. State
Interconnection queue requests/projects by transmission owner
Interconnection queue requests/projects by year
Queue requests/projects in 2026Queue requests/projects in 2025Queue requests/projects in 2024Queue requests/projects in 2023Queue requests/projects in 2022Queue requests/projects in 2021Queue requests/projects in 2020Queue requests/projects in 2019Queue requests/projects in 2018Queue requests/projects in 2017Queue requests/projects in 2016Queue requests/projects in 2015Queue requests/projects in 2014Queue requests/projects in 2013Queue requests/projects in 2012Queue requests/projects in 2011Queue requests/projects in 2010Queue requests/projects in 2009Queue requests/projects in 2008Queue requests/projects in 2007Queue requests/projects in 2006Queue requests/projects in 2005Queue requests/projects in 2004Queue requests/projects in 2003Queue requests/projects in 2002Queue requests/projects in 2001Queue requests/projects in 2000Queue requests/projects in 1999Queue requests/projects in 1998Queue requests/projects in 1997Queue requests/projects in 1996Queue requests/projects in 1995© 2026 Interconnection.fyi. All rights reserved.