Tracking U.S. ISO & utility interconnection queues
Home / Projects / Massachusetts

Massachusetts Interconnection Queue Projects

Total Projects
602
Active
38
Operational
100
Withdrawn
464

All Massachusetts Projects (602)

Project NameQueue IDCountyStatus
Millennium+K1171Worcester CountyOperational
Solar + battery1000Barnstable CountyWithdrawn
Eversource Group @ Industrial Park 6361001Bristol CountyWithdrawn
Solar1002Plymouth CountyWithdrawn
Eversource Group @ Rochester #7451003Plymouth CountyWithdrawn
Eversource Group @ Sandwich 9161004Barnstable CountyWithdrawn
Eversource Group @ Tremont Substation 7131005Plymouth CountyWithdrawn
Eversource Group @ Valley 7151006Barnstable CountyWithdrawn
Eversource Group @ Wareham 7141007Plymouth CountyWithdrawn
Eversource Group @ West Pond 7371008Plymouth CountyWithdrawn
Eversource Group @ Wing Lane 6241009Bristol CountyWithdrawn
Berkshire Wind CNR1010Berkshire CountyOperational
Combined Cycle1011Suffolk CountyWithdrawn
Combined Cycle1012Suffolk CountyWithdrawn
Peabody Power102Essex CountyWithdrawn
Cranberry Highway Solar + Battery Storage1022Plymouth CountyOperational
Solar + Battery Storage1023Bristol CountyWithdrawn
ENA Old Falmouth Road PV + Storage1024Barnstable CountyOperational
Solar + Battery Storage1027Berkshire CountyWithdrawn
Solar1031Hampshire CountyWithdrawn
Eversource Group @ Bell Rock #6611032Bristol CountyWithdrawn
Battery Storage1037Suffolk CountyWithdrawn
Battery Storage1057Middlesex CountyWithdrawn
Offshore Wind1059-Withdrawn
Syncarpha Blandford Solar plus battery storage1063Berkshire CountyOperational
Hoosac Wind Project108Berkshire CountyOperational
Battery Storage1082Middlesex CountyWithdrawn
Battery Storage1083Middlesex CountyWithdrawn
AWT Fitchburg Wind Project109Worcester CountyWithdrawn
Park City Offshore Wind CNR1090-Active
Wareham11Plymouth CountyWithdrawn
Battery Storage1105Worcester CountyWithdrawn
Battery Storage1106Franklin CountyWithdrawn
Battery Storage1107Plymouth CountyWithdrawn
Battery Storage1108Plymouth CountyWithdrawn
Offshore Wind Inc. (Q806)1109-Withdrawn
Norman Street Battery Storage1110Middlesex CountyActive
Battery Storage1111Norfolk CountyWithdrawn
Battery Storage1112Franklin CountyWithdrawn
Hecate Energy Eastern Ave Energy Center1115Suffolk CountyActive
SouthCoast Wind 11116-Active
Streamfield1117Hampden CountyWithdrawn
Offshore wind Increase (QP909)1118-Withdrawn
Offshore wind1119-Withdrawn
NECCO Cogen112Suffolk CountyOperational
Offshore wind1121-Withdrawn
Battery Storage1124Hampden CountyWithdrawn
Solar + Battery Storage1126Barnstable CountyWithdrawn
Solar + Battery Storage1127Barnstable CountyWithdrawn
Solar + Battery Storage1128Berkshire CountyWithdrawn
Solar + Battery Storage1129Bristol CountyWithdrawn
Solar + Battery Storage1130Franklin CountyWithdrawn
Solar + Battery Storage1131Barnstable CountyWithdrawn
Solar + Battery Storage1132Hampshire CountyWithdrawn
Stored Solar Fitchburg CNR Only1133Worcester CountyOperational
Regional Network Service Request1140Hampden CountyWithdrawn
1200 MW DC Bidirectional Transmission line1141Suffolk CountyWithdrawn
1200 MW DC Bidirectional Transmission line1142Suffolk CountyWithdrawn
Battery Storage1143Middlesex CountyActive
Solar1144Dukes CountyWithdrawn
Lite Brite Battery Storage1148Suffolk CountyActive
Battery addition1149Franklin CountyActive
Solar + Battery Storage1152Hampshire CountyWithdrawn
Offshore wind1153-Withdrawn
Offshore wind Inc (QP700)1154-Withdrawn
Battery Storage1159Suffolk CountyWithdrawn
Solar plus Battery1160Berkshire CountyWithdrawn
Solar plus Battery1161Berkshire CountyWithdrawn
Battery Storage1170Franklin CountyWithdrawn
Barre Substation - NG WMA Group 31173Worcester CountyWithdrawn
Crystal Lake Substation - NG WMA Group 31174Worcester CountyWithdrawn
E. Westminster Substation - NG WMA Group 31175Worcester CountyWithdrawn
E. Winchendon Substation - NG WMA Group 31176Worcester CountyWithdrawn
Lashaway Substation - NG WMA Group 31177Worcester CountyWithdrawn
Little Rest Rd Substation - NG WMA Group 31178Worcester CountyWithdrawn
Meadow Street 552 Substation - NG WMA Group 31179Worcester CountyWithdrawn
Millbury Substation - NG WMA Group 31180Worcester CountyWithdrawn
N. Oxford Substation - NG WMA Group 31181Worcester CountyWithdrawn
Pratts Junc. Substation - NG WMA Group 31182Worcester CountyWithdrawn
Royalston Substation - NG WMA Group 31183Worcester CountyWithdrawn
Snow St. Substation - NG WMA Group 31184Worcester CountyWithdrawn
Stafford St. Substation - NG WMA Group 31185Worcester CountyWithdrawn
Treasure Valley Substation - NG WMA Group 31186Worcester CountyWithdrawn
W. Charlton Substation - NG WMA Group 31187Worcester CountyWithdrawn
Ware Substation - NG WMA Group 31188Hampshire CountyWithdrawn
Wendall Depot Substation - NG WMA Group 31189Franklin CountyWithdrawn
Increase to Pumping load1191Berkshire CountyWithdrawn
Bear Swamp Pumping Load Increase1194Berkshire CountyOperational
Regional Network Service1195Middlesex CountyOperational
Energy Storage1196Hampden CountyWithdrawn
Battery Storage1197Bristol CountyWithdrawn
Storage1198Bristol CountyWithdrawn
Berkshire Power12Hampden CountyOperational
Battery Storage1206Berkshire CountyWithdrawn
Battery Storage1207Barnstable CountyWithdrawn
Hopkinton 126 - EMA ASO1212Middlesex CountyWithdrawn
Holliston 130 - EMA ASO1213Middlesex CountyWithdrawn
Group @ Medway 65 - EMA ASO1214Middlesex CountyWithdrawn
Group @ Maynard 416 - EMA ASO1215Middlesex CountyWithdrawn
Group @ Podick - WMA ASO1216Hampden CountyWithdrawn
Oswald - WMA ASO1217Franklin CountyWithdrawn
Group @ Montigue - WMA ASO1218Franklin CountyWithdrawn
Group @ French King - WMA ASO1219Franklin CountyWithdrawn
Group @ Blandford 19J - WMA ASO1220Berkshire CountyWithdrawn
Cumberland 22B - WMA ASO1221Hampden CountyWithdrawn
Group @ Berkshire 18C1222Hampden CountyWithdrawn
Battery Storage1223Worcester CountyWithdrawn
Solar plus Battery1224Worcester CountyWithdrawn
Offshore Wind1225-Withdrawn
Solar plus Battery1229Hampshire CountyWithdrawn
Battery Storage1233Bristol CountyWithdrawn
Battery Storage1234Bristol CountyWithdrawn
Battery Storage1235Bristol CountyWithdrawn
Battery Storage1238Norfolk CountyActive
Battery Storage1248Bristol CountyWithdrawn
Battery Storage1252Essex CountyWithdrawn
Battery Storage CNR Only (see QP887)1253Norfolk CountyWithdrawn
Battery Storage CNR Only1258Norfolk CountyWithdrawn
Battery Storage1259Berkshire CountyWithdrawn
Solar plus Battery1260Hampden CountyWithdrawn
Battery Storage1263Hampshire CountyWithdrawn
Bear Swamp Pump Load increase1264Berkshire CountyOperational
West Springfield 45 MW BESS1272Hampden CountyActive
Canton 470 - EMA ASO1273Norfolk CountyWithdrawn
Crystal Spring 646 - EMA ASO1274Plymouth CountyWithdrawn
Group @ Duxbury 738 - EMA ASO1275Plymouth CountyWithdrawn
Falmouth 933 - EMA ASO1276Barnstable CountyWithdrawn
Fisher Road 657 - EMA ASO1277Bristol CountyWithdrawn
Harwich 968 - EMA ASO1278Barnstable CountyWithdrawn
Group @ Hatchville 936 - EMA ASO1279Barnstable CountyWithdrawn
Hyannis 961 - EMA ASO1280Barnstable CountyWithdrawn
Group @ Industrial Park 636 - EMA ASO1281Bristol CountyWithdrawn
Marshfield 739 - EMA ASO1282Plymouth CountyWithdrawn
Mashpee 946 - EMA ASO1283Barnstable CountyWithdrawn
Group @ Orleans 975 - EMA ASO1284Barnstable CountyWithdrawn
Sandwich 916 - EMA ASO1285Barnstable CountyWithdrawn
Tremont 713 - EMA ASO1286Plymouth CountyWithdrawn
Valley 715 - EMA ASO1287Plymouth CountyWithdrawn
Wellfleet 976 - EMA ASO1288Barnstable CountyWithdrawn
Group @ West Pond 737 - EMA ASO1289Middlesex CountyWithdrawn
Group @ Wing Lane 624 - EMA ASO1290Bristol CountyWithdrawn
Turners Falls CNR1291Franklin CountyOperational
Battery Storage1292Worcester CountyWithdrawn
GRID RNS1293Middlesex CountyActive
Offshore Wind1297-Withdrawn
Battery Storage1298Worcester CountyWithdrawn
Summit Power13Hampden CountyWithdrawn
Solar plus Battery Increase (QP1129)1300Bristol CountyWithdrawn
Battery Storage1301Worcester CountyWithdrawn
Battery Storage1302Franklin CountyWithdrawn
Battery Storage1303Franklin CountyWithdrawn
Uxbridge Substation – NG Hopedale West Group Study1304Worcester CountyWithdrawn
Depot Street Substation – NG Hopedale West Group Study1305Worcester CountyWithdrawn
Whitins Pond Substation – NG Hopedale West Group Study1306Worcester CountyWithdrawn
Whitins Pond Substation – NG Hopedale West Group Study1307Worcester CountyWithdrawn
Uxbridge Substation – NG Hopedale West Group Study1308Worcester CountyWithdrawn
Battery Storage1310Berkshire CountyWithdrawn
RNS - move load to new substation1311Plymouth CountyActive
non-controllable ETU - inc the simultaneous injection capacity to 2400 MW at Brayton Pt 345 kV sub1312Somerset CountyWithdrawn
Offshore Wind1314-Withdrawn
GRID LNS1318Middlesex CountyWithdrawn
Battery Storage1320Worcester CountyActive
NEP LNS1321Somerset CountyWithdrawn
Battery Storage1327Norfolk CountyWithdrawn
Battery Storage1331Hampden CountyWithdrawn
Battery Storage1335Bristol CountyWithdrawn
Battery Storage1336Worcester CountyWithdrawn
Battery Storage1337Berkshire CountyWithdrawn
Battery Storage1338Hampden CountyWithdrawn
Battery Storage1339Bristol CountyWithdrawn
Battery Storage1340Bristol CountyWithdrawn
Battery Storage1341Bristol CountyWithdrawn
Offshore Wind1343-Withdrawn
Offshore Wind CNR only1344-Withdrawn
Russell Biomass135Hampden CountyWithdrawn
(Offshore wind Increase (Q700 +Q1154)1356-Withdrawn
Offshore Wind1361-Withdrawn
Battery Storage Increase (QP1238)1362Norfolk CountyWithdrawn
Battery Storage1363Hampden CountyWithdrawn
Battery Storage1365Hampden CountyActive
Battery Storage1367Bristol CountyWithdrawn
Battery Storage1368Essex CountyWithdrawn
Battery Storage Increase (QP1362)1373Norfolk CountyWithdrawn
Vineyard Offshore Wind CNR1382-Active
Battery Storage1384Worcester CountyWithdrawn
Battery Storage1385Worcester CountyWithdrawn
Battery Storage1386Berkshire CountyWithdrawn
Non-controllable objective ETU to enable 1200 MW offshore wind/300 MW solar at Crystal Springs sub1387Plymouth CountyWithdrawn
Lowell Power Generators139Middlesex CountyWithdrawn
Battery Storage1395Hampshire CountyWithdrawn
Battery Storage1397Worcester CountyWithdrawn
Battery Storage1398Worcester CountyWithdrawn
Battery Storage1399Hampden CountyWithdrawn
Cabot Power14Middlesex CountyWithdrawn
controllable 345 kV ETU - Brayton Point to Pottersville1401Bristol CountyWithdrawn
Battery Storage1402Hampden CountyWithdrawn
Individual @ French King1404Franklin CountyWithdrawn
EE Group @ Southwick1405Hampden CountyWithdrawn
EE Group @ Doreen1406Berkshire CountyWithdrawn
EE Group @ Blandford1407Hampshire CountyWithdrawn
Individual @ Partridge1408Berkshire CountyWithdrawn
Individual @ Montague1409Franklin CountyWithdrawn
Gas Turbine141Middlesex CountyWithdrawn
Individual @ Amherst1410Hampshire CountyWithdrawn
1200 MW controllable ETU - unidirectional1411Middlesex CountyWithdrawn
Battery Storage1412Bristol CountyActive
Group @ Orchard1413Hampden CountyWithdrawn
Individual @ Piper1414Hampden CountyWithdrawn
Battery Storage1415Worcester CountyWithdrawn
Battery Storage1416Hampshire CountyWithdrawn
Battery Storage1419Bristol CountyWithdrawn
Battery Storage1421Bristol CountyWithdrawn
Battery Storage1423Worcester CountyWithdrawn
Battery Storage1424Worcester CountyWithdrawn
Battery Storage1425Hampden CountyWithdrawn
Battery Storage1426Bristol CountyWithdrawn
Battery Storage1430Bristol CountyWithdrawn
Battery Storage1433Hampden CountyWithdrawn
Battery Storage1434Franklin CountyWithdrawn
Battery Storage1439Hampshire CountyWithdrawn
Battery Storage1440Hampden CountyWithdrawn
Battery Storage1441Hampden CountyWithdrawn
Battery Storage1442Bristol CountyWithdrawn
Battery Storage1444Norfolk CountyWithdrawn
Offshore wind1451-Withdrawn
Battery Storage1452Worcester CountyWithdrawn
Battery Storage1460Bristol CountyActive
Battery Storage1462Norfolk CountyWithdrawn
EE Valley DG Group Study1463Plymouth CountyWithdrawn
Battery Storage1467Worcester CountyWithdrawn
Battery Storage1468Plymouth CountyWithdrawn
Battery Storage1469Worcester CountyWithdrawn
Gas Turbine147Suffolk CountyWithdrawn
Battery Storage1473Hampden CountyWithdrawn
NG NEMA Group DER Study1474Essex CountyWithdrawn
NG NEMA Group DER Study1475Essex CountyWithdrawn
NG NEMA Group DER Study1476Middlesex CountyWithdrawn
NG DG @ Sykes Road1477Bristol CountyWithdrawn
Battery Storage1478Hampden CountyWithdrawn
Canton 470 110A - 2023 EE GB ASO1491Norfolk CountyWithdrawn
Medway 65 110A - 2023 EE GB ASO1492Middlesex CountyWithdrawn
Medway 65 110B - 2023 EE GB ASO1493Middlesex CountyWithdrawn
Walpole 146 110A - 2023 EE GB ASO1494Norfolk CountyWithdrawn
Battery Storage1499Hampden CountyWithdrawn
Offshore Wind CNR only1500-Withdrawn
Battery Storage1506Middlesex CountyWithdrawn
Battery Storage1509Worcester CountyWithdrawn
Fitchburg Renewable Energy151Worcester CountyOperational
Battery Storage1510Worcester CountyWithdrawn
Battery Storage1511Hampden CountyWithdrawn
Battery Storage + Solar1512Franklin CountyWithdrawn
Battery Storage1513Worcester CountyActive
Battery Storage1514Worcester CountyWithdrawn
Battery Storage1515Berkshire CountyActive
Battery Storage1517Franklin CountyWithdrawn
Battery Storage1518Berkshire CountyActive
MATEP (Medical Area Total Energy Project)152Suffolk CountyOperational
Battery Storage1522Bristol CountyWithdrawn
Battery Storage1523Norfolk CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1526Bristol CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1527Barnstable CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1528Plymouth CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1529Plymouth CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1530Bristol CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1531Plymouth CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1532Plymouth CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1533Plymouth CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1534Plymouth CountyWithdrawn
EE 2024 SEMA/Cape ASO Group Study1535Barnstable CountyWithdrawn
Gas Turbine (Additional Capacity)154Suffolk CountyWithdrawn
Battery Storage1541Middlesex CountyWithdrawn
Battery Storage1542Hampden CountyActive
Battery Storage1543Barnstable CountyActive
Battery Storage1544Franklin CountyWithdrawn
Battery Storage1545Franklin CountyWithdrawn
Battery Storage1546Berkshire CountyActive
Gas Turbine155Middlesex CountyWithdrawn
Battery Storage1550Plymouth CountyWithdrawn
Battery Storage1551Worcester CountyActive
Battery Storage1553Middlesex CountyActive
Battery Storage1555Essex CountyActive
Battery Storage1556Worcester CountyWithdrawn
Battery Storage1557Essex CountyActive
Battery Storage1558Bristol CountyWithdrawn
Brayton Point Unit 3 Voltage Regulator Replacement156Bristol CountyOperational
Salem Harbor Unit 1 Exciter Replacement156Essex CountyOperational
Battery Storage1560Bristol CountyWithdrawn
Battery Storage1565Bristol CountyWithdrawn
Battery Storage1567Middlesex CountyActive
Billerica Power157Middlesex CountyWithdrawn
Battery Storage1570Worcester CountyWithdrawn
Battery Storage1571Worcester CountyWithdrawn
RMLD DER Group Study1579Middlesex CountyWithdrawn
RMLD DER Group Study1580Middlesex CountyWithdrawn
TMLP Landfill Solar1581Bristol CountyWithdrawn
Paxton BESS1582Worcester CountyWithdrawn
HGE Group Study1583Hampden CountyWithdrawn
HGE Group Study1584Hampden CountyWithdrawn
HGE Group Study1585Hampden CountyWithdrawn
Battery Storage1587Worcester CountyWithdrawn
SHELD BESS1592Hampden CountyWithdrawn
BESS1601Essex CountyWithdrawn
Mirant Kendall Jet 2163Middlesex CountyWithdrawn
Gas Turbine Capacity Increase (see #155)170Middlesex CountyWithdrawn
Thomas A. Watson Generating Station171Norfolk CountyOperational
Combined Cycle174Hampden CountyWithdrawn
Gas Turbine177Worcester CountyWithdrawn
Brockton Combined Cycle178Plymouth CountyWithdrawn
Gas Turbine Capacity Increase( #157)184Middlesex CountyWithdrawn
Gas Turbine Capacity Increase( #178)188Plymouth CountyWithdrawn
Covanta Haverhill Landfill Gas189Essex CountyOperational
Gas Turbine190Hampden CountyWithdrawn
Salem Harbor Unit 3 Exciter Replacement192Essex CountyOperational
Dartmouth Power Expansion195Bristol CountyOperational
Northfield Mt Upgrade #1196Franklin CountyOperational
Northfield Mt. Upgrade #2196Franklin CountyOperational
Northfield Mt Upgrade #3196Franklin CountyOperational
Northfield Mt. Upgrade #4196Franklin CountyOperational
UMass Gas Turbine196Hampshire CountyOperational
Gas Turbine208Norfolk CountyWithdrawn
Mount Tom Voltage Regulator Replacement209Hampden CountyOperational
MATEP (Medical Area Total Energy Project)-modify i210Suffolk CountyOperational
Combined Cycle211Bristol CountyWithdrawn
Gas Turbine213Worcester CountyWithdrawn
Gas Turbine213Worcester CountyWithdrawn
Combined Cycle215Norfolk CountyWithdrawn
Combined Cycle216Bristol CountyWithdrawn
Northfield Mt. Equipment Replacement217Franklin CountyOperational
Biomass Project ( Also see queue position #223)218Berkshire CountyWithdrawn
L'Energia219Middlesex CountyOperational
Increase to biomass project in queue position 218223Berkshire CountyWithdrawn
Bear Swamp Uprate - First Unit227Berkshire CountyWithdrawn
Pump Storage Capacity Upgrade227Berkshire CountyWithdrawn
Brayton Point 3 Uprate( see 243)231Bristol CountyOperational
Pioneer Valley Energy Center236Hampden CountyWithdrawn
Barre Mass Landfill Gas238Worcester CountyWithdrawn
Increase to Steam Turbine Capacity Uprate (See QP243Bristol CountyOperational
Gas Turbine246Worcester CountyWithdrawn
Patriot Power25Bristol CountyWithdrawn
Wind Project254Berkshire CountyWithdrawn
Combined Cycle259Norfolk CountyWithdrawn
S&P Cogeneration26Essex CountyWithdrawn
MATEP - Third CTG265Suffolk CountyWithdrawn
Indian River Power269Hampden CountyOperational
Palmer Renewable Energy273Hampden CountyWithdrawn
Two terminal, 1000 MW , 500 kV, dc line278-Withdrawn
Biomass Project282Franklin CountyWithdrawn
1100 MW HVDC Line283-Withdrawn
Gas Turbine286Worcester CountyWithdrawn
Biomass Project292Berkshire CountyWithdrawn
Combined Cycle295Plymouth CountyWithdrawn
Salem Harbor 2 Exciter Replacement296Essex CountyOperational
Internal Combustion305Dukes CountyWithdrawn
Hydro306Hampden CountyWithdrawn
Overflow #3306Hampden CountyWithdrawn
Combined Cycle314Plymouth CountyWithdrawn
Cresent Hydroelectric Project Uprate315Hampden CountyOperational
Solar326Hampden CountyWithdrawn
Douglas Woods Wind Unit 12328Worcester CountyWithdrawn
Douglas Woods Wind Units 1-11328Worcester CountyWithdrawn
Sithe Edgar Station Expansion (Fore River)33Norfolk CountyOperational
Sithe Framingham Station Expansion33Middlesex CountyWithdrawn
Sithe Medway33Norfolk CountyWithdrawn
Sithe Mystic Station Expansion Unit 833Suffolk CountyOperational
Sithe Mystic Station Expansion Unit 933Suffolk CountyOperational
Kendall #3 Back Pressure Steam Turbine331Middlesex CountyOperational
Wind334Hampden CountyWithdrawn
HVDC Line341-Withdrawn
Operating change343Plymouth CountyWithdrawn
Mass Power Increase344Hampden CountyOperational
Salem Harbor Station Increase352Essex CountyOperational
Wind353Barnstable CountyWithdrawn
Wind353Plymouth CountyWithdrawn
Combined Cycle Increase354Berkshire CountyWithdrawn
Altresco Increase (winter)356Berkshire CountyOperational
Bear Swamp AVR/PSS Unit 1359Franklin CountyOperational
Bear Swamp AVR/PSS Unit 2359Franklin CountyOperational
FPL Energy (Bedford)36Bristol CountyWithdrawn
Indian River Power Supply CNR360Hampden CountyOperational
Turners Falls Hydro CNR360Franklin CountyOperational
Woronoco Hydro CNR360Hampden CountyOperational
Solar363Bristol CountyWithdrawn
Solar364Hampden CountyWithdrawn
CC Administrative Increase373Hampden CountyWithdrawn
Brayton Pt. 1 Exciter Replacement374Bristol CountyOperational
Brayton Pt. 2 Exciter Replacement374Bristol CountyWithdrawn
Harrington Street PV Project (QF)377Worcester CountyOperational
HVDC Line378-Withdrawn
CornerStone Power Monson 2379Hampden CountyWithdrawn
CornerStone Power Monson 3379Hampden CountyWithdrawn
1000 MW HVDC Line380-Withdrawn
1000 MW HVDC Line380-Withdrawn
Footprint Combined Cycle Unit387Essex CountyOperational
Berkshire Wind Increase396Berkshire CountyActive
Dighton Power Uprate398Bristol CountyOperational
EMI Dighton Power Project4Bristol CountyOperational
Glen Charlie Unit One40Plymouth CountyWithdrawn
MATEP -3rd CTG404Suffolk CountyOperational
Gas Turbine408Middlesex CountyWithdrawn
Gas Turbine409Norfolk CountyWithdrawn
Canal 2 Repowering41Barnstable CountyWithdrawn
Gas Turbine Increase411Essex CountyOperational
Hydro Increase424Hampden CountyWithdrawn
1200 MW AC to HVDC Tie428Middlesex CountyWithdrawn
MATEP (Combined Cycle) Increase433Suffolk CountyOperational
Potter Repowering438Norfolk CountyWithdrawn
Simple Cycle439Essex CountyWithdrawn
Brockton Power Project44Plymouth CountyWithdrawn
Glendale Hydroelectric Expansion Project441Berkshire CountyOperational
Combined Cycle442Hampden CountyWithdrawn
Brockton Combined Cycle CNR Increase443Plymouth CountyWithdrawn
Medway Peaker - SEMARI444Norfolk CountyOperational
Gas Turbine445Norfolk CountyWithdrawn
Canal 3449Barnstable CountyOperational
Kendall Repowering Project45Suffolk CountyOperational
1200 MW HVDC Tie456Middlesex CountyWithdrawn
Campello Power Co.46Plymouth CountyWithdrawn
1000 MW HVDC464Suffolk CountyWithdrawn
MASSPOWER CNR Recovery467Hampden CountyOperational
Nickel Hill Energy Project47Middlesex CountyWithdrawn
Combined Cycle Increase472Hampden CountyWithdrawn
RNS Application473Norfolk CountyWithdrawn
CNR Increase474Middlesex CountyWithdrawn
600 MW HVDC Tie475Berkshire CountyWithdrawn
1000 MW HVDC Tie480Suffolk CountyWithdrawn
Combined Cycle485Hampden CountyWithdrawn
Kendall Reconfiguration Project490Middlesex CountyOperational
Fore River CNR Increase491Norfolk CountyOperational
1000 MW HVDC - bidirectional493Middlesex CountyWithdrawn
1000 MW HVDC - bidirectional494Suffolk CountyWithdrawn
Brayton Pt5Bristol CountyWithdrawn
Patriot Cabot Street Station50Hampden CountyWithdrawn
Internal HVDC - North to South flow506Suffolk CountyWithdrawn
HVDC from NY to WMA - bidirectional508Berkshire CountyWithdrawn
HVDC Line509Middlesex CountyWithdrawn
HVDC Line510Plymouth CountyWithdrawn
HVDC Line511Barnstable CountyWithdrawn
AC to HVDC Tie512Middlesex CountyWithdrawn
HVDC from S. Maine to Mystic - bidirectional flow517Middlesex CountyWithdrawn
HVDC from S. Maine to K Street - bidirectional fl518Suffolk CountyWithdrawn
Combined Cycle Upgrade #1526Worcester CountyWithdrawn
Combined Cycle Uprate #2527Worcester CountyOperational
Combined Cycle Upgrate #3528Worcester CountyWithdrawn
Combined Cycle CNR Only529Worcester CountyWithdrawn
Holiday Hill Community Wind535Hampden CountyOperational
Combustion Turbine537Middlesex CountyWithdrawn
Hoosac Wind Project CNR Only539Franklin CountyOperational
Combined cycle (alt to Q442/472)541Hampden CountyWithdrawn
combustion turbine542Norfolk CountyWithdrawn
NEA Bell. Uprate (Northeast Energy Associates, LP)546Norfolk CountyActive
Combined Cycle548Plymouth CountyWithdrawn
Southbridge LFGTE Engine 2554Worcester CountyWithdrawn
HVDC from ME to MA (MA import only)569Plymouth CountyWithdrawn
Kendall Revised Reconfiguration Project570Middlesex CountyOperational
Combined Cycle580Worcester CountyWithdrawn
Solar581Worcester CountyWithdrawn
Solar582Worcester CountyWithdrawn
ETU CNI only (see Q508)584Berkshire CountyWithdrawn
HVDC Tie NB to Mystic585Middlesex CountyWithdrawn
Berkshire Power Uprate59Hampden CountyWithdrawn
Bear Swamp Unit 1 and 2 Upgrade592Berkshire CountyActive
Combined Cycle GT608Bristol CountyWithdrawn
Simple Cycle Gas Turbine617Essex CountyOperational
Bay State Offshore Wind 1618-Withdrawn
Bi-directional AC LIne619Berkshire CountyWithdrawn
Cogen DG622Middlesex CountyOperational
Vineyard Offshore Wind624-Active
345 kV AC line625Bristol CountyWithdrawn
Offshore Wind w/ battery storage632-Withdrawn
West Springfield Station64Hampden CountyOperational
1000 MW HVDC (import only)640Plymouth CountyWithdrawn
Repowering Increase642Norfolk CountyWithdrawn
AC tie line (import only)651Berkshire CountyWithdrawn
Offshore Wind669-Withdrawn
Lowell Power Expansion67Middlesex CountyWithdrawn
solar with battery682Worcester CountyWithdrawn
Solar686Berkshire CountyWithdrawn
Energy Storage687Barnstable CountyWithdrawn
Energy Storage688Worcester CountyWithdrawn
Energy Storage689Middlesex CountyWithdrawn
Energy Storage690Bristol CountyWithdrawn
Solar697Worcester CountyOperational
Solar698Worcester CountyOperational
Offshore Wind with battery addition699-Withdrawn
Park City Offshore Wind700-Active
Offshore Wind701-Withdrawn
Solar702Plymouth CountyOperational
Solar703Plymouth CountyActive
Solar704Bristol CountyOperational
Tewksbury Power72Middlesex CountyWithdrawn
Battery Storage723Barnstable CountyWithdrawn
Cranberry Point Energy Storage726Plymouth CountyOperational
Somerset A73Bristol CountyWithdrawn
Somerset Diversity73Bristol CountyWithdrawn
Energy Storage752Bristol CountyWithdrawn
Storage761Middlesex CountyWithdrawn
Solar with battery addition768Hampshire CountyOperational
Wind769Berkshire CountyWithdrawn
Berkshire Wind Power Project77Berkshire CountyOperational
Combined Reciprocating, Solar and Battery772Middlesex CountyOperational
Solar773Plymouth CountyOperational
Kearsarge Solar with battery778Norfolk CountyOperational
Solar with Battery779Worcester CountyOperational
Combined Reciprocating, Solar and Battery modification780Middlesex CountyWithdrawn
Solar797Worcester CountyWithdrawn
ANP Bellingham Energy Project Unit 18Norfolk CountyOperational
ANP Bellingham Energy Project Unit 28Norfolk CountyOperational
ANP Blackstone Energy Project Unit 18Worcester CountyOperational
ANP Blackstone Energy Project Unit 28Worcester CountyOperational
Offshore Wind806-Withdrawn
Barre substation - NG Western MA Area Cluster Study808Worcester CountyWithdrawn
Belchertown Substation - NG Western MA Area Cluster Study809Hampden CountyOperational
Chestnut Hill 702 Substation - NG Western MA Area Cluster Study810Worcester CountyOperational
Crystal Lake Substation - NG Western MA Area Cluster Study811Worcester CountyOperational
E. Westminster Substation - NG Western MA Area Cluster Study812Worcester CountyWithdrawn
E. Winchendon Substation - NG Western MA Area Cluster Study813Worcester CountyWithdrawn
Five Corners Substation - NG Western MA Area Cluster Study814Hampshire CountyOperational
Lashaway Substation - NG Western MA Area Cluster Study815Worcester CountyWithdrawn
Leicester - NG Western MA Area Cluster Study816Worcester CountyOperational
Little Rest Rd Substation - NG Western MA Area Cluster Study817Worcester CountyWithdrawn
Meadow Street 552 Substation - NG Western MA Area Cluster Study818Worcester CountyWithdrawn
N. Oxford Substation - NG Western MA Area Cluster Study819Worcester CountyOperational
Cape Cod Offshore Wind Project82Barnstable CountyWithdrawn
Palmer Substation - NG Western MA Area Cluster Study820Hampden CountyWithdrawn
Pondville - NG Western MA Area Cluster Study821Worcester CountyWithdrawn
Royalston - NG Western MA Area Cluster Study822Worcester CountyWithdrawn
Thorndike Substation - NG Western MA Area Cluster Study823Hampden CountyWithdrawn
Ware Substation - NG Western MA Area Cluster Study824Hampshire CountyWithdrawn
Webster St - NG Western MA Area Cluster Study825Worcester CountyWithdrawn
Wendell Depot Substation - NG Western MA Area Cluster Study826Franklin CountyOperational
Westminster - NG Western MA Area Cluster Study827Worcester CountyOperational
ETU for simultaneous delivery of specific Queued projects828-Withdrawn
Offshore Wind829-Withdrawn
Neptune Phase3 Boston Import from NB or NS83Suffolk CountyWithdrawn
Offshore Wind830-Withdrawn
Battery Storage832Plymouth CountyWithdrawn
Solar835Norfolk CountyWithdrawn
Somerset Wind Link - 1200 MW HVDC Line (Controllable) into Brayton Point837Bristol CountyActive
Phase 1 - Nantucket Shouls Wind84Barnstable CountyWithdrawn
Phase 2 - Nantucket Shouls Wind84Barnstable CountyWithdrawn
Phase 2 - Nantucket Sound Wind84Barnstable CountyWithdrawn
Phase 3 - Nantucket Shouls Wind84Barnstable CountyWithdrawn
Phase 4 - Nantucket Shouls Wind84Barnstable CountyWithdrawn
Phase I - Nantucket Sound Wind Project84Barnstable CountyWithdrawn
Medway Grid Battery Storage844Norfolk CountyActive
Offshore Wind Increase846-Withdrawn
Battery Storage847Essex CountyWithdrawn
Adams substation - NG Western MA Area Cluster Study848Berkshire CountyWithdrawn
Ashburnham substation - NG Western MA Area Cluster Study849Worcester CountyWithdrawn
Pilgrim Power Uprate85Plymouth CountyOperational
Bear Swamp Upper Yard substation - NG Western MA Area Cluster Study850Berkshire CountyOperational
Brookfield substation - NG Western MA Area Cluster Study851Worcester CountyWithdrawn
E. Webster substation - NG Western MA Area Cluster Study852Worcester CountyWithdrawn
East Longmeadow substation - NG Western MA Area Cluster Study853Hampden CountyWithdrawn
Litchfield substation - NG Western MA Area Cluster Study854Worcester CountyOperational
Millbury substation - NG Western MA Area Cluster Study855Worcester CountyWithdrawn
New Salem substation - NG Western MA Area Cluster Study856Worcester CountyWithdrawn
Powder Mill substation - NG Western MA Area Cluster Study857Worcester CountyWithdrawn
Pratts Junction substation - NG Western MA Area Cluster Study858Worcester CountyWithdrawn
Prospect Street substation - NG Western MA Area Cluster Study859Worcester CountyWithdrawn
Shutesbury substation - NG Western MA Area Cluster Study860Hampshire CountyWithdrawn
Snow Street substation - NG Western MA Area Cluster Study861Worcester CountyWithdrawn
Stafford Street substation - NG Western MA Area Cluster Study862Worcester CountyWithdrawn
Treasure Valley substation - NG Western MA Area Cluster Study863Worcester CountyOperational
W. Charlton substation - NG Western MA Area Cluster Study864Worcester CountyWithdrawn
West Hampden 139 substation - NG Western MA Area Cluster Study865Hampden CountyWithdrawn
Whitmanville substation - NG Western MA Area Cluster Study866Worcester CountyWithdrawn
Wilbraham substation - NG Western MA Area Cluster Study867Hampden CountyOperational
1200 MW HVDC Line (controllable) Into Mystic873Middlesex CountyWithdrawn
Energy Storage876Bristol CountyWithdrawn
Energy Storage877Norfolk CountyActive
Fore River CNR Uprate881Norfolk CountyOperational
Kendall CNR Restoration882Middlesex CountyOperational
Kendall Combined Cycle increase883Middlesex CountyWithdrawn
Battery Storage886Norfolk CountyWithdrawn
Battery Storage887Plymouth CountyWithdrawn
Cape Wind Turbine Generators89-Withdrawn
IDC Bellingham9Norfolk CountyWithdrawn
Cabot Station CUO Uprate90Franklin CountyOperational
Offshore Wind909-Withdrawn
Sithe Mystic 4,5,6 Reconfiguration of Interconnect92Middlesex CountyWithdrawn
Offshore wind Increase (Q829)922-Withdrawn
Bay State Wind 4 Offshore Wind944-Active
Vineyard Offshore Wind CNR Only955-Active
Eversource Group Study @ Brook St973Plymouth CountyWithdrawn
Solar plus Battery974Bristol CountyWithdrawn
Eversource Group Study @ Crystal Spring975Plymouth CountyWithdrawn
Eversource Group Study @ Industrial Park976Bristol CountyWithdrawn
Eversource Group Study @ Wareham977Plymouth CountyWithdrawn
Eversource Group Study @ Wing Lane978Bristol CountyWithdrawn
Storage984Middlesex CountyWithdrawn
Eversource Group Study @ Blandford989Hampden CountyWithdrawn
Solar990Berkshire CountyWithdrawn
Solar991Franklin CountyWithdrawn
Eversource Group @ Arsene St 654992Bristol CountyWithdrawn
Solar + Battery993Plymouth CountyWithdrawn
Solar + battery994Middlesex CountyWithdrawn
Solar + Battery995Norfolk CountyWithdrawn
Eversource Group @ Cross Rd 651996Bristol CountyWithdrawn
Eversource Group @ Crystal Spring 646997Middlesex CountyWithdrawn
Eversource Group @ Falmouth 993998Barnstable CountyWithdrawn
Eversource Group @ Fisher Rd Substation 657999Bristol CountyWithdrawn
Interconnection.fyi
Tracking U.S. ISO & utility interconnection queues

Stay up to date via our email newsletter:

Interconnection queue requests/projects in list format

All transmission grid interconnection queue requests/projects All distribution grid (DG) interconnection queue requests/projects Data center projects by state EIA860 planned and operational power plant projects

Insights

Charts State of interconnection queues — January 2024In 2024, interconnection queues shrank for the first time in yearsAll blog posts

Other energy & climate tools

Inflation Reduction Act Bill Text Viewer ToolClimate Tech Jobs Tracker (30,000+ jobs)Climate Tech Hiring Trends & Charts

Queue requests/projects by U.S. state


Queue requests/projects by Canadian province

Queue requests/projects by project type

GenerationLoadReplacementSurplusTransmissionUpgrade

Data Centers

All data center projects

By U.S. State

Interconnection queue requests/projects by transmission owner

Alberta Electric System OperatorAllegheny PowerAlliant Energy EastAlliant Energy WestAmeren IllinoisAmeren MissouriAmerican Electric PowerAmerican Municipal PowerAmerican Transmission CompanyAmerican Transmission SystemsArizona Public ServiceArkansas Electric Cooperative CorporationAssociated Electric CooperativeAvista UtilitiesBC HydroBaltimore Gas and ElectricBangor Hydro ElectricBasin Electric Power CooperativeBig Rivers Electric CorporationBlack Hills Cheyenne Light Fuel and Power TransmissionBlack Hills Colorado ElectricBlack Hills PowerBonneville Power AdministrationCedar Falls UtilitiesCentral Hudson Gas and ElectricCentral Maine PowerCentral Power Electric CooperativeChelan County Public Utility DistrictCity Utilities of Springfield MissouriCity Water, Light and PowerCity of Columbia, MissouriCity of Muscatine, IowaCleco HoldingsColorado River Storage Project TransmissionColorado Springs UtilitiesCommonwealth EdisonConsolidated EdisonConsumers EnergyCooperative EnergyCorn Belt Power CooperativeDCR TransmissionDairyland Power CooperativeDayton Power and LightDelmarva Power and LightDesertLinkDominion EnergyDominion Energy South CarolinaDuke EnergyDuke Energy CarolinasDuke Energy FloridaDuke Energy IndianaDuke Energy Ohio and KentuckyDuke Energy ProgressDuquesne Light CompanyEast Kentucky Power CooperativeEast River Electric Power CooperativeEast Texas Electric CooperativeEl Paso ElectricEmpire District Electric CompanyEntergyEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasEssential PowerEvergyEvergy Missouri WestEversourceEwington Energy SystemsFirstEnergyFlorida Power and LightGeorgia TransmissionGrand River Dam AuthorityGrand River EnergyGrant County Public Utility DistrictGridLianceGridLiance WestGridUnityHenderson Municipal Power and LightHoosier EnergyHorizon West TransmissionHydro-QuébecISO New EnglandITC Great PlainsITC MidwestITC TransmissionIdaho Power CompanyImperial Irrigation DistrictIndependence Power and LightIndependent Electricity System OperatorIndianapolis Power and LightJacksonville Electric AuthorityJersey Central Power and LightKACYKansas City Board of Public UtilitiesKansas City Power and LightKansas Power PoolLS PowerLS Power Grid New YorkLafayette Utilities SystemLea County Electric CooperativeLincoln Electric SystemLong Island Power Authority
Los Angeles Department of Water and PowerLouisville Gas and Electric and Kentucky Utilities EnergyLoveland Area Projects TransmissionLower Yellowstone Rural Electric CooperativeMadison Gas and ElectricMaine Public ServiceManitoba HydroMetropolitan Edison CompanyMichigan Electric Transmission CompanyMichigan Public Power AgencyMid-Kansas Electric CompanyMidAmerican EnergyMidcontinent Independent System OperatorMidwest EnergyMinnesota Municipal Power AgencyMinnesota PowerMinnkota Power CooperativeMissouri River Energy ServicesMissouri Western Energy CorporationMontana-Dakota UtilitiesMunicipal Commission of BoonvilleNAEANB PowerNV EnergyNational GridNavajo-CrystalNebraska Public Power DistrictNew York Power AuthorityNew York State Electric and GasNew York TranscoNextEra Energy TransmissionNextEra Energy Transmission SouthwestNorthWestern EnergyNortheast UtilitiesNorthern Indiana Public ServiceNorthern States Power CompanyNorthwest Iowa Power CooperativeNorthwestern Wisconsin Electric CompanyNova Scotia PowerOhio Valley Electric CorporationOklahoma Gas and ElectricOld Dominion Electric CooperativeOmaha Public Power DistrictOrange and RocklandOrlando Utilities CommissionOtter Tail Power CompanyPECO Energy CompanyPJMPPL CorporationPacifiCorpPacific Gas and Electric CompanyPennsylvania Electric CompanyPeople's Electric CooperativePlatte River Power AuthorityPortland General ElectricPotomac Electric Power CompanyPrairie PowerPublic Service Company Of ColoradoPublic Service Company of New MexicoPublic Service Electric and GasPuget Sound EnergyRochester Gas and ElectricRochester Public UtilitiesRockland Electric CompanySacramento Municipal Utility DistrictSalt River ProjectSan Diego Gas and ElectricSantee CooperSaskPowerSeminole Electric CooperativeSouth Mississippi Electric Power AssociationSouthern California EdisonSouthern CompanySouthern Illinois Power CooperativeSouthern Indiana Gas and Electric CompanySouthern Maryland Electric CooperativeSouthern Minnesota Municipal Power AgencySouthwestern Power AdministrationSouthwestern Public Service CompanySunflower Electric Power CorporationTacoma Public UtilitiesTampa Electric CompanyTennessee Valley AuthorityTransource MissouriTri-State Generation and Transmission AssociationTucson Electric PowerUnited Gas Improvement CompanyUnited Illuminating CompanyUpper Peninsula Power CompanyValley Electric AssociationVillage of ArcadeVillage of IlionWAPA Sierra NevadaWAPA/BEPC/HCPD Integrated SystemWabash Valley Power AssociationWestar EnergyWestern Area Power AdministrationWestern Area Power Administration Desert Southwest RegionWestern Farmers Electric CooperativeWisconsin Electric Power CompanyWisconsin Public Service CorporationWolverine Power Supply CooperativeXcel Energy