Massachusetts Interconnection Queue Projects
- Total Projects
- 602
- Active
- 38
- Operational
- 100
- Withdrawn
- 464
All Massachusetts Projects (602)
| Project Name | Queue ID | County | Status |
|---|---|---|---|
| Millennium+K117 | 1 | Worcester County | Operational |
| Solar + battery | 1000 | Barnstable County | Withdrawn |
| Eversource Group @ Industrial Park 636 | 1001 | Bristol County | Withdrawn |
| Solar | 1002 | Plymouth County | Withdrawn |
| Eversource Group @ Rochester #745 | 1003 | Plymouth County | Withdrawn |
| Eversource Group @ Sandwich 916 | 1004 | Barnstable County | Withdrawn |
| Eversource Group @ Tremont Substation 713 | 1005 | Plymouth County | Withdrawn |
| Eversource Group @ Valley 715 | 1006 | Barnstable County | Withdrawn |
| Eversource Group @ Wareham 714 | 1007 | Plymouth County | Withdrawn |
| Eversource Group @ West Pond 737 | 1008 | Plymouth County | Withdrawn |
| Eversource Group @ Wing Lane 624 | 1009 | Bristol County | Withdrawn |
| Berkshire Wind CNR | 1010 | Berkshire County | Operational |
| Combined Cycle | 1011 | Suffolk County | Withdrawn |
| Combined Cycle | 1012 | Suffolk County | Withdrawn |
| Peabody Power | 102 | Essex County | Withdrawn |
| Cranberry Highway Solar + Battery Storage | 1022 | Plymouth County | Operational |
| Solar + Battery Storage | 1023 | Bristol County | Withdrawn |
| ENA Old Falmouth Road PV + Storage | 1024 | Barnstable County | Operational |
| Solar + Battery Storage | 1027 | Berkshire County | Withdrawn |
| Solar | 1031 | Hampshire County | Withdrawn |
| Eversource Group @ Bell Rock #661 | 1032 | Bristol County | Withdrawn |
| Battery Storage | 1037 | Suffolk County | Withdrawn |
| Battery Storage | 1057 | Middlesex County | Withdrawn |
| Offshore Wind | 1059 | - | Withdrawn |
| Syncarpha Blandford Solar plus battery storage | 1063 | Berkshire County | Operational |
| Hoosac Wind Project | 108 | Berkshire County | Operational |
| Battery Storage | 1082 | Middlesex County | Withdrawn |
| Battery Storage | 1083 | Middlesex County | Withdrawn |
| AWT Fitchburg Wind Project | 109 | Worcester County | Withdrawn |
| Park City Offshore Wind CNR | 1090 | - | Active |
| Wareham | 11 | Plymouth County | Withdrawn |
| Battery Storage | 1105 | Worcester County | Withdrawn |
| Battery Storage | 1106 | Franklin County | Withdrawn |
| Battery Storage | 1107 | Plymouth County | Withdrawn |
| Battery Storage | 1108 | Plymouth County | Withdrawn |
| Offshore Wind Inc. (Q806) | 1109 | - | Withdrawn |
| Norman Street Battery Storage | 1110 | Middlesex County | Active |
| Battery Storage | 1111 | Norfolk County | Withdrawn |
| Battery Storage | 1112 | Franklin County | Withdrawn |
| Hecate Energy Eastern Ave Energy Center | 1115 | Suffolk County | Active |
| SouthCoast Wind 1 | 1116 | - | Active |
| Streamfield | 1117 | Hampden County | Withdrawn |
| Offshore wind Increase (QP909) | 1118 | - | Withdrawn |
| Offshore wind | 1119 | - | Withdrawn |
| NECCO Cogen | 112 | Suffolk County | Operational |
| Offshore wind | 1121 | - | Withdrawn |
| Battery Storage | 1124 | Hampden County | Withdrawn |
| Solar + Battery Storage | 1126 | Barnstable County | Withdrawn |
| Solar + Battery Storage | 1127 | Barnstable County | Withdrawn |
| Solar + Battery Storage | 1128 | Berkshire County | Withdrawn |
| Solar + Battery Storage | 1129 | Bristol County | Withdrawn |
| Solar + Battery Storage | 1130 | Franklin County | Withdrawn |
| Solar + Battery Storage | 1131 | Barnstable County | Withdrawn |
| Solar + Battery Storage | 1132 | Hampshire County | Withdrawn |
| Stored Solar Fitchburg CNR Only | 1133 | Worcester County | Operational |
| Regional Network Service Request | 1140 | Hampden County | Withdrawn |
| 1200 MW DC Bidirectional Transmission line | 1141 | Suffolk County | Withdrawn |
| 1200 MW DC Bidirectional Transmission line | 1142 | Suffolk County | Withdrawn |
| Battery Storage | 1143 | Middlesex County | Active |
| Solar | 1144 | Dukes County | Withdrawn |
| Lite Brite Battery Storage | 1148 | Suffolk County | Active |
| Battery addition | 1149 | Franklin County | Active |
| Solar + Battery Storage | 1152 | Hampshire County | Withdrawn |
| Offshore wind | 1153 | - | Withdrawn |
| Offshore wind Inc (QP700) | 1154 | - | Withdrawn |
| Battery Storage | 1159 | Suffolk County | Withdrawn |
| Solar plus Battery | 1160 | Berkshire County | Withdrawn |
| Solar plus Battery | 1161 | Berkshire County | Withdrawn |
| Battery Storage | 1170 | Franklin County | Withdrawn |
| Barre Substation - NG WMA Group 3 | 1173 | Worcester County | Withdrawn |
| Crystal Lake Substation - NG WMA Group 3 | 1174 | Worcester County | Withdrawn |
| E. Westminster Substation - NG WMA Group 3 | 1175 | Worcester County | Withdrawn |
| E. Winchendon Substation - NG WMA Group 3 | 1176 | Worcester County | Withdrawn |
| Lashaway Substation - NG WMA Group 3 | 1177 | Worcester County | Withdrawn |
| Little Rest Rd Substation - NG WMA Group 3 | 1178 | Worcester County | Withdrawn |
| Meadow Street 552 Substation - NG WMA Group 3 | 1179 | Worcester County | Withdrawn |
| Millbury Substation - NG WMA Group 3 | 1180 | Worcester County | Withdrawn |
| N. Oxford Substation - NG WMA Group 3 | 1181 | Worcester County | Withdrawn |
| Pratts Junc. Substation - NG WMA Group 3 | 1182 | Worcester County | Withdrawn |
| Royalston Substation - NG WMA Group 3 | 1183 | Worcester County | Withdrawn |
| Snow St. Substation - NG WMA Group 3 | 1184 | Worcester County | Withdrawn |
| Stafford St. Substation - NG WMA Group 3 | 1185 | Worcester County | Withdrawn |
| Treasure Valley Substation - NG WMA Group 3 | 1186 | Worcester County | Withdrawn |
| W. Charlton Substation - NG WMA Group 3 | 1187 | Worcester County | Withdrawn |
| Ware Substation - NG WMA Group 3 | 1188 | Hampshire County | Withdrawn |
| Wendall Depot Substation - NG WMA Group 3 | 1189 | Franklin County | Withdrawn |
| Increase to Pumping load | 1191 | Berkshire County | Withdrawn |
| Bear Swamp Pumping Load Increase | 1194 | Berkshire County | Operational |
| Regional Network Service | 1195 | Middlesex County | Operational |
| Energy Storage | 1196 | Hampden County | Withdrawn |
| Battery Storage | 1197 | Bristol County | Withdrawn |
| Storage | 1198 | Bristol County | Withdrawn |
| Berkshire Power | 12 | Hampden County | Operational |
| Battery Storage | 1206 | Berkshire County | Withdrawn |
| Battery Storage | 1207 | Barnstable County | Withdrawn |
| Hopkinton 126 - EMA ASO | 1212 | Middlesex County | Withdrawn |
| Holliston 130 - EMA ASO | 1213 | Middlesex County | Withdrawn |
| Group @ Medway 65 - EMA ASO | 1214 | Middlesex County | Withdrawn |
| Group @ Maynard 416 - EMA ASO | 1215 | Middlesex County | Withdrawn |
| Group @ Podick - WMA ASO | 1216 | Hampden County | Withdrawn |
| Oswald - WMA ASO | 1217 | Franklin County | Withdrawn |
| Group @ Montigue - WMA ASO | 1218 | Franklin County | Withdrawn |
| Group @ French King - WMA ASO | 1219 | Franklin County | Withdrawn |
| Group @ Blandford 19J - WMA ASO | 1220 | Berkshire County | Withdrawn |
| Cumberland 22B - WMA ASO | 1221 | Hampden County | Withdrawn |
| Group @ Berkshire 18C | 1222 | Hampden County | Withdrawn |
| Battery Storage | 1223 | Worcester County | Withdrawn |
| Solar plus Battery | 1224 | Worcester County | Withdrawn |
| Offshore Wind | 1225 | - | Withdrawn |
| Solar plus Battery | 1229 | Hampshire County | Withdrawn |
| Battery Storage | 1233 | Bristol County | Withdrawn |
| Battery Storage | 1234 | Bristol County | Withdrawn |
| Battery Storage | 1235 | Bristol County | Withdrawn |
| Battery Storage | 1238 | Norfolk County | Active |
| Battery Storage | 1248 | Bristol County | Withdrawn |
| Battery Storage | 1252 | Essex County | Withdrawn |
| Battery Storage CNR Only (see QP887) | 1253 | Norfolk County | Withdrawn |
| Battery Storage CNR Only | 1258 | Norfolk County | Withdrawn |
| Battery Storage | 1259 | Berkshire County | Withdrawn |
| Solar plus Battery | 1260 | Hampden County | Withdrawn |
| Battery Storage | 1263 | Hampshire County | Withdrawn |
| Bear Swamp Pump Load increase | 1264 | Berkshire County | Operational |
| West Springfield 45 MW BESS | 1272 | Hampden County | Active |
| Canton 470 - EMA ASO | 1273 | Norfolk County | Withdrawn |
| Crystal Spring 646 - EMA ASO | 1274 | Plymouth County | Withdrawn |
| Group @ Duxbury 738 - EMA ASO | 1275 | Plymouth County | Withdrawn |
| Falmouth 933 - EMA ASO | 1276 | Barnstable County | Withdrawn |
| Fisher Road 657 - EMA ASO | 1277 | Bristol County | Withdrawn |
| Harwich 968 - EMA ASO | 1278 | Barnstable County | Withdrawn |
| Group @ Hatchville 936 - EMA ASO | 1279 | Barnstable County | Withdrawn |
| Hyannis 961 - EMA ASO | 1280 | Barnstable County | Withdrawn |
| Group @ Industrial Park 636 - EMA ASO | 1281 | Bristol County | Withdrawn |
| Marshfield 739 - EMA ASO | 1282 | Plymouth County | Withdrawn |
| Mashpee 946 - EMA ASO | 1283 | Barnstable County | Withdrawn |
| Group @ Orleans 975 - EMA ASO | 1284 | Barnstable County | Withdrawn |
| Sandwich 916 - EMA ASO | 1285 | Barnstable County | Withdrawn |
| Tremont 713 - EMA ASO | 1286 | Plymouth County | Withdrawn |
| Valley 715 - EMA ASO | 1287 | Plymouth County | Withdrawn |
| Wellfleet 976 - EMA ASO | 1288 | Barnstable County | Withdrawn |
| Group @ West Pond 737 - EMA ASO | 1289 | Middlesex County | Withdrawn |
| Group @ Wing Lane 624 - EMA ASO | 1290 | Bristol County | Withdrawn |
| Turners Falls CNR | 1291 | Franklin County | Operational |
| Battery Storage | 1292 | Worcester County | Withdrawn |
| GRID RNS | 1293 | Middlesex County | Active |
| Offshore Wind | 1297 | - | Withdrawn |
| Battery Storage | 1298 | Worcester County | Withdrawn |
| Summit Power | 13 | Hampden County | Withdrawn |
| Solar plus Battery Increase (QP1129) | 1300 | Bristol County | Withdrawn |
| Battery Storage | 1301 | Worcester County | Withdrawn |
| Battery Storage | 1302 | Franklin County | Withdrawn |
| Battery Storage | 1303 | Franklin County | Withdrawn |
| Uxbridge Substation – NG Hopedale West Group Study | 1304 | Worcester County | Withdrawn |
| Depot Street Substation – NG Hopedale West Group Study | 1305 | Worcester County | Withdrawn |
| Whitins Pond Substation – NG Hopedale West Group Study | 1306 | Worcester County | Withdrawn |
| Whitins Pond Substation – NG Hopedale West Group Study | 1307 | Worcester County | Withdrawn |
| Uxbridge Substation – NG Hopedale West Group Study | 1308 | Worcester County | Withdrawn |
| Battery Storage | 1310 | Berkshire County | Withdrawn |
| RNS - move load to new substation | 1311 | Plymouth County | Active |
| non-controllable ETU - inc the simultaneous injection capacity to 2400 MW at Brayton Pt 345 kV sub | 1312 | Somerset County | Withdrawn |
| Offshore Wind | 1314 | - | Withdrawn |
| GRID LNS | 1318 | Middlesex County | Withdrawn |
| Battery Storage | 1320 | Worcester County | Active |
| NEP LNS | 1321 | Somerset County | Withdrawn |
| Battery Storage | 1327 | Norfolk County | Withdrawn |
| Battery Storage | 1331 | Hampden County | Withdrawn |
| Battery Storage | 1335 | Bristol County | Withdrawn |
| Battery Storage | 1336 | Worcester County | Withdrawn |
| Battery Storage | 1337 | Berkshire County | Withdrawn |
| Battery Storage | 1338 | Hampden County | Withdrawn |
| Battery Storage | 1339 | Bristol County | Withdrawn |
| Battery Storage | 1340 | Bristol County | Withdrawn |
| Battery Storage | 1341 | Bristol County | Withdrawn |
| Offshore Wind | 1343 | - | Withdrawn |
| Offshore Wind CNR only | 1344 | - | Withdrawn |
| Russell Biomass | 135 | Hampden County | Withdrawn |
| (Offshore wind Increase (Q700 +Q1154) | 1356 | - | Withdrawn |
| Offshore Wind | 1361 | - | Withdrawn |
| Battery Storage Increase (QP1238) | 1362 | Norfolk County | Withdrawn |
| Battery Storage | 1363 | Hampden County | Withdrawn |
| Battery Storage | 1365 | Hampden County | Active |
| Battery Storage | 1367 | Bristol County | Withdrawn |
| Battery Storage | 1368 | Essex County | Withdrawn |
| Battery Storage Increase (QP1362) | 1373 | Norfolk County | Withdrawn |
| Vineyard Offshore Wind CNR | 1382 | - | Active |
| Battery Storage | 1384 | Worcester County | Withdrawn |
| Battery Storage | 1385 | Worcester County | Withdrawn |
| Battery Storage | 1386 | Berkshire County | Withdrawn |
| Non-controllable objective ETU to enable 1200 MW offshore wind/300 MW solar at Crystal Springs sub | 1387 | Plymouth County | Withdrawn |
| Lowell Power Generators | 139 | Middlesex County | Withdrawn |
| Battery Storage | 1395 | Hampshire County | Withdrawn |
| Battery Storage | 1397 | Worcester County | Withdrawn |
| Battery Storage | 1398 | Worcester County | Withdrawn |
| Battery Storage | 1399 | Hampden County | Withdrawn |
| Cabot Power | 14 | Middlesex County | Withdrawn |
| controllable 345 kV ETU - Brayton Point to Pottersville | 1401 | Bristol County | Withdrawn |
| Battery Storage | 1402 | Hampden County | Withdrawn |
| Individual @ French King | 1404 | Franklin County | Withdrawn |
| EE Group @ Southwick | 1405 | Hampden County | Withdrawn |
| EE Group @ Doreen | 1406 | Berkshire County | Withdrawn |
| EE Group @ Blandford | 1407 | Hampshire County | Withdrawn |
| Individual @ Partridge | 1408 | Berkshire County | Withdrawn |
| Individual @ Montague | 1409 | Franklin County | Withdrawn |
| Gas Turbine | 141 | Middlesex County | Withdrawn |
| Individual @ Amherst | 1410 | Hampshire County | Withdrawn |
| 1200 MW controllable ETU - unidirectional | 1411 | Middlesex County | Withdrawn |
| Battery Storage | 1412 | Bristol County | Active |
| Group @ Orchard | 1413 | Hampden County | Withdrawn |
| Individual @ Piper | 1414 | Hampden County | Withdrawn |
| Battery Storage | 1415 | Worcester County | Withdrawn |
| Battery Storage | 1416 | Hampshire County | Withdrawn |
| Battery Storage | 1419 | Bristol County | Withdrawn |
| Battery Storage | 1421 | Bristol County | Withdrawn |
| Battery Storage | 1423 | Worcester County | Withdrawn |
| Battery Storage | 1424 | Worcester County | Withdrawn |
| Battery Storage | 1425 | Hampden County | Withdrawn |
| Battery Storage | 1426 | Bristol County | Withdrawn |
| Battery Storage | 1430 | Bristol County | Withdrawn |
| Battery Storage | 1433 | Hampden County | Withdrawn |
| Battery Storage | 1434 | Franklin County | Withdrawn |
| Battery Storage | 1439 | Hampshire County | Withdrawn |
| Battery Storage | 1440 | Hampden County | Withdrawn |
| Battery Storage | 1441 | Hampden County | Withdrawn |
| Battery Storage | 1442 | Bristol County | Withdrawn |
| Battery Storage | 1444 | Norfolk County | Withdrawn |
| Offshore wind | 1451 | - | Withdrawn |
| Battery Storage | 1452 | Worcester County | Withdrawn |
| Battery Storage | 1460 | Bristol County | Active |
| Battery Storage | 1462 | Norfolk County | Withdrawn |
| EE Valley DG Group Study | 1463 | Plymouth County | Withdrawn |
| Battery Storage | 1467 | Worcester County | Withdrawn |
| Battery Storage | 1468 | Plymouth County | Withdrawn |
| Battery Storage | 1469 | Worcester County | Withdrawn |
| Gas Turbine | 147 | Suffolk County | Withdrawn |
| Battery Storage | 1473 | Hampden County | Withdrawn |
| NG NEMA Group DER Study | 1474 | Essex County | Withdrawn |
| NG NEMA Group DER Study | 1475 | Essex County | Withdrawn |
| NG NEMA Group DER Study | 1476 | Middlesex County | Withdrawn |
| NG DG @ Sykes Road | 1477 | Bristol County | Withdrawn |
| Battery Storage | 1478 | Hampden County | Withdrawn |
| Canton 470 110A - 2023 EE GB ASO | 1491 | Norfolk County | Withdrawn |
| Medway 65 110A - 2023 EE GB ASO | 1492 | Middlesex County | Withdrawn |
| Medway 65 110B - 2023 EE GB ASO | 1493 | Middlesex County | Withdrawn |
| Walpole 146 110A - 2023 EE GB ASO | 1494 | Norfolk County | Withdrawn |
| Battery Storage | 1499 | Hampden County | Withdrawn |
| Offshore Wind CNR only | 1500 | - | Withdrawn |
| Battery Storage | 1506 | Middlesex County | Withdrawn |
| Battery Storage | 1509 | Worcester County | Withdrawn |
| Fitchburg Renewable Energy | 151 | Worcester County | Operational |
| Battery Storage | 1510 | Worcester County | Withdrawn |
| Battery Storage | 1511 | Hampden County | Withdrawn |
| Battery Storage + Solar | 1512 | Franklin County | Withdrawn |
| Battery Storage | 1513 | Worcester County | Active |
| Battery Storage | 1514 | Worcester County | Withdrawn |
| Battery Storage | 1515 | Berkshire County | Active |
| Battery Storage | 1517 | Franklin County | Withdrawn |
| Battery Storage | 1518 | Berkshire County | Active |
| MATEP (Medical Area Total Energy Project) | 152 | Suffolk County | Operational |
| Battery Storage | 1522 | Bristol County | Withdrawn |
| Battery Storage | 1523 | Norfolk County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1526 | Bristol County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1527 | Barnstable County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1528 | Plymouth County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1529 | Plymouth County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1530 | Bristol County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1531 | Plymouth County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1532 | Plymouth County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1533 | Plymouth County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1534 | Plymouth County | Withdrawn |
| EE 2024 SEMA/Cape ASO Group Study | 1535 | Barnstable County | Withdrawn |
| Gas Turbine (Additional Capacity) | 154 | Suffolk County | Withdrawn |
| Battery Storage | 1541 | Middlesex County | Withdrawn |
| Battery Storage | 1542 | Hampden County | Active |
| Battery Storage | 1543 | Barnstable County | Active |
| Battery Storage | 1544 | Franklin County | Withdrawn |
| Battery Storage | 1545 | Franklin County | Withdrawn |
| Battery Storage | 1546 | Berkshire County | Active |
| Gas Turbine | 155 | Middlesex County | Withdrawn |
| Battery Storage | 1550 | Plymouth County | Withdrawn |
| Battery Storage | 1551 | Worcester County | Active |
| Battery Storage | 1553 | Middlesex County | Active |
| Battery Storage | 1555 | Essex County | Active |
| Battery Storage | 1556 | Worcester County | Withdrawn |
| Battery Storage | 1557 | Essex County | Active |
| Battery Storage | 1558 | Bristol County | Withdrawn |
| Brayton Point Unit 3 Voltage Regulator Replacement | 156 | Bristol County | Operational |
| Salem Harbor Unit 1 Exciter Replacement | 156 | Essex County | Operational |
| Battery Storage | 1560 | Bristol County | Withdrawn |
| Battery Storage | 1565 | Bristol County | Withdrawn |
| Battery Storage | 1567 | Middlesex County | Active |
| Billerica Power | 157 | Middlesex County | Withdrawn |
| Battery Storage | 1570 | Worcester County | Withdrawn |
| Battery Storage | 1571 | Worcester County | Withdrawn |
| RMLD DER Group Study | 1579 | Middlesex County | Withdrawn |
| RMLD DER Group Study | 1580 | Middlesex County | Withdrawn |
| TMLP Landfill Solar | 1581 | Bristol County | Withdrawn |
| Paxton BESS | 1582 | Worcester County | Withdrawn |
| HGE Group Study | 1583 | Hampden County | Withdrawn |
| HGE Group Study | 1584 | Hampden County | Withdrawn |
| HGE Group Study | 1585 | Hampden County | Withdrawn |
| Battery Storage | 1587 | Worcester County | Withdrawn |
| SHELD BESS | 1592 | Hampden County | Withdrawn |
| BESS | 1601 | Essex County | Withdrawn |
| Mirant Kendall Jet 2 | 163 | Middlesex County | Withdrawn |
| Gas Turbine Capacity Increase (see #155) | 170 | Middlesex County | Withdrawn |
| Thomas A. Watson Generating Station | 171 | Norfolk County | Operational |
| Combined Cycle | 174 | Hampden County | Withdrawn |
| Gas Turbine | 177 | Worcester County | Withdrawn |
| Brockton Combined Cycle | 178 | Plymouth County | Withdrawn |
| Gas Turbine Capacity Increase( #157) | 184 | Middlesex County | Withdrawn |
| Gas Turbine Capacity Increase( #178) | 188 | Plymouth County | Withdrawn |
| Covanta Haverhill Landfill Gas | 189 | Essex County | Operational |
| Gas Turbine | 190 | Hampden County | Withdrawn |
| Salem Harbor Unit 3 Exciter Replacement | 192 | Essex County | Operational |
| Dartmouth Power Expansion | 195 | Bristol County | Operational |
| Northfield Mt Upgrade #1 | 196 | Franklin County | Operational |
| Northfield Mt. Upgrade #2 | 196 | Franklin County | Operational |
| Northfield Mt Upgrade #3 | 196 | Franklin County | Operational |
| Northfield Mt. Upgrade #4 | 196 | Franklin County | Operational |
| UMass Gas Turbine | 196 | Hampshire County | Operational |
| Gas Turbine | 208 | Norfolk County | Withdrawn |
| Mount Tom Voltage Regulator Replacement | 209 | Hampden County | Operational |
| MATEP (Medical Area Total Energy Project)-modify i | 210 | Suffolk County | Operational |
| Combined Cycle | 211 | Bristol County | Withdrawn |
| Gas Turbine | 213 | Worcester County | Withdrawn |
| Gas Turbine | 213 | Worcester County | Withdrawn |
| Combined Cycle | 215 | Norfolk County | Withdrawn |
| Combined Cycle | 216 | Bristol County | Withdrawn |
| Northfield Mt. Equipment Replacement | 217 | Franklin County | Operational |
| Biomass Project ( Also see queue position #223) | 218 | Berkshire County | Withdrawn |
| L'Energia | 219 | Middlesex County | Operational |
| Increase to biomass project in queue position 218 | 223 | Berkshire County | Withdrawn |
| Bear Swamp Uprate - First Unit | 227 | Berkshire County | Withdrawn |
| Pump Storage Capacity Upgrade | 227 | Berkshire County | Withdrawn |
| Brayton Point 3 Uprate( see 243) | 231 | Bristol County | Operational |
| Pioneer Valley Energy Center | 236 | Hampden County | Withdrawn |
| Barre Mass Landfill Gas | 238 | Worcester County | Withdrawn |
| Increase to Steam Turbine Capacity Uprate (See QP | 243 | Bristol County | Operational |
| Gas Turbine | 246 | Worcester County | Withdrawn |
| Patriot Power | 25 | Bristol County | Withdrawn |
| Wind Project | 254 | Berkshire County | Withdrawn |
| Combined Cycle | 259 | Norfolk County | Withdrawn |
| S&P Cogeneration | 26 | Essex County | Withdrawn |
| MATEP - Third CTG | 265 | Suffolk County | Withdrawn |
| Indian River Power | 269 | Hampden County | Operational |
| Palmer Renewable Energy | 273 | Hampden County | Withdrawn |
| Two terminal, 1000 MW , 500 kV, dc line | 278 | - | Withdrawn |
| Biomass Project | 282 | Franklin County | Withdrawn |
| 1100 MW HVDC Line | 283 | - | Withdrawn |
| Gas Turbine | 286 | Worcester County | Withdrawn |
| Biomass Project | 292 | Berkshire County | Withdrawn |
| Combined Cycle | 295 | Plymouth County | Withdrawn |
| Salem Harbor 2 Exciter Replacement | 296 | Essex County | Operational |
| Internal Combustion | 305 | Dukes County | Withdrawn |
| Hydro | 306 | Hampden County | Withdrawn |
| Overflow #3 | 306 | Hampden County | Withdrawn |
| Combined Cycle | 314 | Plymouth County | Withdrawn |
| Cresent Hydroelectric Project Uprate | 315 | Hampden County | Operational |
| Solar | 326 | Hampden County | Withdrawn |
| Douglas Woods Wind Unit 12 | 328 | Worcester County | Withdrawn |
| Douglas Woods Wind Units 1-11 | 328 | Worcester County | Withdrawn |
| Sithe Edgar Station Expansion (Fore River) | 33 | Norfolk County | Operational |
| Sithe Framingham Station Expansion | 33 | Middlesex County | Withdrawn |
| Sithe Medway | 33 | Norfolk County | Withdrawn |
| Sithe Mystic Station Expansion Unit 8 | 33 | Suffolk County | Operational |
| Sithe Mystic Station Expansion Unit 9 | 33 | Suffolk County | Operational |
| Kendall #3 Back Pressure Steam Turbine | 331 | Middlesex County | Operational |
| Wind | 334 | Hampden County | Withdrawn |
| HVDC Line | 341 | - | Withdrawn |
| Operating change | 343 | Plymouth County | Withdrawn |
| Mass Power Increase | 344 | Hampden County | Operational |
| Salem Harbor Station Increase | 352 | Essex County | Operational |
| Wind | 353 | Barnstable County | Withdrawn |
| Wind | 353 | Plymouth County | Withdrawn |
| Combined Cycle Increase | 354 | Berkshire County | Withdrawn |
| Altresco Increase (winter) | 356 | Berkshire County | Operational |
| Bear Swamp AVR/PSS Unit 1 | 359 | Franklin County | Operational |
| Bear Swamp AVR/PSS Unit 2 | 359 | Franklin County | Operational |
| FPL Energy (Bedford) | 36 | Bristol County | Withdrawn |
| Indian River Power Supply CNR | 360 | Hampden County | Operational |
| Turners Falls Hydro CNR | 360 | Franklin County | Operational |
| Woronoco Hydro CNR | 360 | Hampden County | Operational |
| Solar | 363 | Bristol County | Withdrawn |
| Solar | 364 | Hampden County | Withdrawn |
| CC Administrative Increase | 373 | Hampden County | Withdrawn |
| Brayton Pt. 1 Exciter Replacement | 374 | Bristol County | Operational |
| Brayton Pt. 2 Exciter Replacement | 374 | Bristol County | Withdrawn |
| Harrington Street PV Project (QF) | 377 | Worcester County | Operational |
| HVDC Line | 378 | - | Withdrawn |
| CornerStone Power Monson 2 | 379 | Hampden County | Withdrawn |
| CornerStone Power Monson 3 | 379 | Hampden County | Withdrawn |
| 1000 MW HVDC Line | 380 | - | Withdrawn |
| 1000 MW HVDC Line | 380 | - | Withdrawn |
| Footprint Combined Cycle Unit | 387 | Essex County | Operational |
| Berkshire Wind Increase | 396 | Berkshire County | Active |
| Dighton Power Uprate | 398 | Bristol County | Operational |
| EMI Dighton Power Project | 4 | Bristol County | Operational |
| Glen Charlie Unit One | 40 | Plymouth County | Withdrawn |
| MATEP -3rd CTG | 404 | Suffolk County | Operational |
| Gas Turbine | 408 | Middlesex County | Withdrawn |
| Gas Turbine | 409 | Norfolk County | Withdrawn |
| Canal 2 Repowering | 41 | Barnstable County | Withdrawn |
| Gas Turbine Increase | 411 | Essex County | Operational |
| Hydro Increase | 424 | Hampden County | Withdrawn |
| 1200 MW AC to HVDC Tie | 428 | Middlesex County | Withdrawn |
| MATEP (Combined Cycle) Increase | 433 | Suffolk County | Operational |
| Potter Repowering | 438 | Norfolk County | Withdrawn |
| Simple Cycle | 439 | Essex County | Withdrawn |
| Brockton Power Project | 44 | Plymouth County | Withdrawn |
| Glendale Hydroelectric Expansion Project | 441 | Berkshire County | Operational |
| Combined Cycle | 442 | Hampden County | Withdrawn |
| Brockton Combined Cycle CNR Increase | 443 | Plymouth County | Withdrawn |
| Medway Peaker - SEMARI | 444 | Norfolk County | Operational |
| Gas Turbine | 445 | Norfolk County | Withdrawn |
| Canal 3 | 449 | Barnstable County | Operational |
| Kendall Repowering Project | 45 | Suffolk County | Operational |
| 1200 MW HVDC Tie | 456 | Middlesex County | Withdrawn |
| Campello Power Co. | 46 | Plymouth County | Withdrawn |
| 1000 MW HVDC | 464 | Suffolk County | Withdrawn |
| MASSPOWER CNR Recovery | 467 | Hampden County | Operational |
| Nickel Hill Energy Project | 47 | Middlesex County | Withdrawn |
| Combined Cycle Increase | 472 | Hampden County | Withdrawn |
| RNS Application | 473 | Norfolk County | Withdrawn |
| CNR Increase | 474 | Middlesex County | Withdrawn |
| 600 MW HVDC Tie | 475 | Berkshire County | Withdrawn |
| 1000 MW HVDC Tie | 480 | Suffolk County | Withdrawn |
| Combined Cycle | 485 | Hampden County | Withdrawn |
| Kendall Reconfiguration Project | 490 | Middlesex County | Operational |
| Fore River CNR Increase | 491 | Norfolk County | Operational |
| 1000 MW HVDC - bidirectional | 493 | Middlesex County | Withdrawn |
| 1000 MW HVDC - bidirectional | 494 | Suffolk County | Withdrawn |
| Brayton Pt | 5 | Bristol County | Withdrawn |
| Patriot Cabot Street Station | 50 | Hampden County | Withdrawn |
| Internal HVDC - North to South flow | 506 | Suffolk County | Withdrawn |
| HVDC from NY to WMA - bidirectional | 508 | Berkshire County | Withdrawn |
| HVDC Line | 509 | Middlesex County | Withdrawn |
| HVDC Line | 510 | Plymouth County | Withdrawn |
| HVDC Line | 511 | Barnstable County | Withdrawn |
| AC to HVDC Tie | 512 | Middlesex County | Withdrawn |
| HVDC from S. Maine to Mystic - bidirectional flow | 517 | Middlesex County | Withdrawn |
| HVDC from S. Maine to K Street - bidirectional fl | 518 | Suffolk County | Withdrawn |
| Combined Cycle Upgrade #1 | 526 | Worcester County | Withdrawn |
| Combined Cycle Uprate #2 | 527 | Worcester County | Operational |
| Combined Cycle Upgrate #3 | 528 | Worcester County | Withdrawn |
| Combined Cycle CNR Only | 529 | Worcester County | Withdrawn |
| Holiday Hill Community Wind | 535 | Hampden County | Operational |
| Combustion Turbine | 537 | Middlesex County | Withdrawn |
| Hoosac Wind Project CNR Only | 539 | Franklin County | Operational |
| Combined cycle (alt to Q442/472) | 541 | Hampden County | Withdrawn |
| combustion turbine | 542 | Norfolk County | Withdrawn |
| NEA Bell. Uprate (Northeast Energy Associates, LP) | 546 | Norfolk County | Active |
| Combined Cycle | 548 | Plymouth County | Withdrawn |
| Southbridge LFGTE Engine 2 | 554 | Worcester County | Withdrawn |
| HVDC from ME to MA (MA import only) | 569 | Plymouth County | Withdrawn |
| Kendall Revised Reconfiguration Project | 570 | Middlesex County | Operational |
| Combined Cycle | 580 | Worcester County | Withdrawn |
| Solar | 581 | Worcester County | Withdrawn |
| Solar | 582 | Worcester County | Withdrawn |
| ETU CNI only (see Q508) | 584 | Berkshire County | Withdrawn |
| HVDC Tie NB to Mystic | 585 | Middlesex County | Withdrawn |
| Berkshire Power Uprate | 59 | Hampden County | Withdrawn |
| Bear Swamp Unit 1 and 2 Upgrade | 592 | Berkshire County | Active |
| Combined Cycle GT | 608 | Bristol County | Withdrawn |
| Simple Cycle Gas Turbine | 617 | Essex County | Operational |
| Bay State Offshore Wind 1 | 618 | - | Withdrawn |
| Bi-directional AC LIne | 619 | Berkshire County | Withdrawn |
| Cogen DG | 622 | Middlesex County | Operational |
| Vineyard Offshore Wind | 624 | - | Active |
| 345 kV AC line | 625 | Bristol County | Withdrawn |
| Offshore Wind w/ battery storage | 632 | - | Withdrawn |
| West Springfield Station | 64 | Hampden County | Operational |
| 1000 MW HVDC (import only) | 640 | Plymouth County | Withdrawn |
| Repowering Increase | 642 | Norfolk County | Withdrawn |
| AC tie line (import only) | 651 | Berkshire County | Withdrawn |
| Offshore Wind | 669 | - | Withdrawn |
| Lowell Power Expansion | 67 | Middlesex County | Withdrawn |
| solar with battery | 682 | Worcester County | Withdrawn |
| Solar | 686 | Berkshire County | Withdrawn |
| Energy Storage | 687 | Barnstable County | Withdrawn |
| Energy Storage | 688 | Worcester County | Withdrawn |
| Energy Storage | 689 | Middlesex County | Withdrawn |
| Energy Storage | 690 | Bristol County | Withdrawn |
| Solar | 697 | Worcester County | Operational |
| Solar | 698 | Worcester County | Operational |
| Offshore Wind with battery addition | 699 | - | Withdrawn |
| Park City Offshore Wind | 700 | - | Active |
| Offshore Wind | 701 | - | Withdrawn |
| Solar | 702 | Plymouth County | Operational |
| Solar | 703 | Plymouth County | Active |
| Solar | 704 | Bristol County | Operational |
| Tewksbury Power | 72 | Middlesex County | Withdrawn |
| Battery Storage | 723 | Barnstable County | Withdrawn |
| Cranberry Point Energy Storage | 726 | Plymouth County | Operational |
| Somerset A | 73 | Bristol County | Withdrawn |
| Somerset Diversity | 73 | Bristol County | Withdrawn |
| Energy Storage | 752 | Bristol County | Withdrawn |
| Storage | 761 | Middlesex County | Withdrawn |
| Solar with battery addition | 768 | Hampshire County | Operational |
| Wind | 769 | Berkshire County | Withdrawn |
| Berkshire Wind Power Project | 77 | Berkshire County | Operational |
| Combined Reciprocating, Solar and Battery | 772 | Middlesex County | Operational |
| Solar | 773 | Plymouth County | Operational |
| Kearsarge Solar with battery | 778 | Norfolk County | Operational |
| Solar with Battery | 779 | Worcester County | Operational |
| Combined Reciprocating, Solar and Battery modification | 780 | Middlesex County | Withdrawn |
| Solar | 797 | Worcester County | Withdrawn |
| ANP Bellingham Energy Project Unit 1 | 8 | Norfolk County | Operational |
| ANP Bellingham Energy Project Unit 2 | 8 | Norfolk County | Operational |
| ANP Blackstone Energy Project Unit 1 | 8 | Worcester County | Operational |
| ANP Blackstone Energy Project Unit 2 | 8 | Worcester County | Operational |
| Offshore Wind | 806 | - | Withdrawn |
| Barre substation - NG Western MA Area Cluster Study | 808 | Worcester County | Withdrawn |
| Belchertown Substation - NG Western MA Area Cluster Study | 809 | Hampden County | Operational |
| Chestnut Hill 702 Substation - NG Western MA Area Cluster Study | 810 | Worcester County | Operational |
| Crystal Lake Substation - NG Western MA Area Cluster Study | 811 | Worcester County | Operational |
| E. Westminster Substation - NG Western MA Area Cluster Study | 812 | Worcester County | Withdrawn |
| E. Winchendon Substation - NG Western MA Area Cluster Study | 813 | Worcester County | Withdrawn |
| Five Corners Substation - NG Western MA Area Cluster Study | 814 | Hampshire County | Operational |
| Lashaway Substation - NG Western MA Area Cluster Study | 815 | Worcester County | Withdrawn |
| Leicester - NG Western MA Area Cluster Study | 816 | Worcester County | Operational |
| Little Rest Rd Substation - NG Western MA Area Cluster Study | 817 | Worcester County | Withdrawn |
| Meadow Street 552 Substation - NG Western MA Area Cluster Study | 818 | Worcester County | Withdrawn |
| N. Oxford Substation - NG Western MA Area Cluster Study | 819 | Worcester County | Operational |
| Cape Cod Offshore Wind Project | 82 | Barnstable County | Withdrawn |
| Palmer Substation - NG Western MA Area Cluster Study | 820 | Hampden County | Withdrawn |
| Pondville - NG Western MA Area Cluster Study | 821 | Worcester County | Withdrawn |
| Royalston - NG Western MA Area Cluster Study | 822 | Worcester County | Withdrawn |
| Thorndike Substation - NG Western MA Area Cluster Study | 823 | Hampden County | Withdrawn |
| Ware Substation - NG Western MA Area Cluster Study | 824 | Hampshire County | Withdrawn |
| Webster St - NG Western MA Area Cluster Study | 825 | Worcester County | Withdrawn |
| Wendell Depot Substation - NG Western MA Area Cluster Study | 826 | Franklin County | Operational |
| Westminster - NG Western MA Area Cluster Study | 827 | Worcester County | Operational |
| ETU for simultaneous delivery of specific Queued projects | 828 | - | Withdrawn |
| Offshore Wind | 829 | - | Withdrawn |
| Neptune Phase3 Boston Import from NB or NS | 83 | Suffolk County | Withdrawn |
| Offshore Wind | 830 | - | Withdrawn |
| Battery Storage | 832 | Plymouth County | Withdrawn |
| Solar | 835 | Norfolk County | Withdrawn |
| Somerset Wind Link - 1200 MW HVDC Line (Controllable) into Brayton Point | 837 | Bristol County | Active |
| Phase 1 - Nantucket Shouls Wind | 84 | Barnstable County | Withdrawn |
| Phase 2 - Nantucket Shouls Wind | 84 | Barnstable County | Withdrawn |
| Phase 2 - Nantucket Sound Wind | 84 | Barnstable County | Withdrawn |
| Phase 3 - Nantucket Shouls Wind | 84 | Barnstable County | Withdrawn |
| Phase 4 - Nantucket Shouls Wind | 84 | Barnstable County | Withdrawn |
| Phase I - Nantucket Sound Wind Project | 84 | Barnstable County | Withdrawn |
| Medway Grid Battery Storage | 844 | Norfolk County | Active |
| Offshore Wind Increase | 846 | - | Withdrawn |
| Battery Storage | 847 | Essex County | Withdrawn |
| Adams substation - NG Western MA Area Cluster Study | 848 | Berkshire County | Withdrawn |
| Ashburnham substation - NG Western MA Area Cluster Study | 849 | Worcester County | Withdrawn |
| Pilgrim Power Uprate | 85 | Plymouth County | Operational |
| Bear Swamp Upper Yard substation - NG Western MA Area Cluster Study | 850 | Berkshire County | Operational |
| Brookfield substation - NG Western MA Area Cluster Study | 851 | Worcester County | Withdrawn |
| E. Webster substation - NG Western MA Area Cluster Study | 852 | Worcester County | Withdrawn |
| East Longmeadow substation - NG Western MA Area Cluster Study | 853 | Hampden County | Withdrawn |
| Litchfield substation - NG Western MA Area Cluster Study | 854 | Worcester County | Operational |
| Millbury substation - NG Western MA Area Cluster Study | 855 | Worcester County | Withdrawn |
| New Salem substation - NG Western MA Area Cluster Study | 856 | Worcester County | Withdrawn |
| Powder Mill substation - NG Western MA Area Cluster Study | 857 | Worcester County | Withdrawn |
| Pratts Junction substation - NG Western MA Area Cluster Study | 858 | Worcester County | Withdrawn |
| Prospect Street substation - NG Western MA Area Cluster Study | 859 | Worcester County | Withdrawn |
| Shutesbury substation - NG Western MA Area Cluster Study | 860 | Hampshire County | Withdrawn |
| Snow Street substation - NG Western MA Area Cluster Study | 861 | Worcester County | Withdrawn |
| Stafford Street substation - NG Western MA Area Cluster Study | 862 | Worcester County | Withdrawn |
| Treasure Valley substation - NG Western MA Area Cluster Study | 863 | Worcester County | Operational |
| W. Charlton substation - NG Western MA Area Cluster Study | 864 | Worcester County | Withdrawn |
| West Hampden 139 substation - NG Western MA Area Cluster Study | 865 | Hampden County | Withdrawn |
| Whitmanville substation - NG Western MA Area Cluster Study | 866 | Worcester County | Withdrawn |
| Wilbraham substation - NG Western MA Area Cluster Study | 867 | Hampden County | Operational |
| 1200 MW HVDC Line (controllable) Into Mystic | 873 | Middlesex County | Withdrawn |
| Energy Storage | 876 | Bristol County | Withdrawn |
| Energy Storage | 877 | Norfolk County | Active |
| Fore River CNR Uprate | 881 | Norfolk County | Operational |
| Kendall CNR Restoration | 882 | Middlesex County | Operational |
| Kendall Combined Cycle increase | 883 | Middlesex County | Withdrawn |
| Battery Storage | 886 | Norfolk County | Withdrawn |
| Battery Storage | 887 | Plymouth County | Withdrawn |
| Cape Wind Turbine Generators | 89 | - | Withdrawn |
| IDC Bellingham | 9 | Norfolk County | Withdrawn |
| Cabot Station CUO Uprate | 90 | Franklin County | Operational |
| Offshore Wind | 909 | - | Withdrawn |
| Sithe Mystic 4,5,6 Reconfiguration of Interconnect | 92 | Middlesex County | Withdrawn |
| Offshore wind Increase (Q829) | 922 | - | Withdrawn |
| Bay State Wind 4 Offshore Wind | 944 | - | Active |
| Vineyard Offshore Wind CNR Only | 955 | - | Active |
| Eversource Group Study @ Brook St | 973 | Plymouth County | Withdrawn |
| Solar plus Battery | 974 | Bristol County | Withdrawn |
| Eversource Group Study @ Crystal Spring | 975 | Plymouth County | Withdrawn |
| Eversource Group Study @ Industrial Park | 976 | Bristol County | Withdrawn |
| Eversource Group Study @ Wareham | 977 | Plymouth County | Withdrawn |
| Eversource Group Study @ Wing Lane | 978 | Bristol County | Withdrawn |
| Storage | 984 | Middlesex County | Withdrawn |
| Eversource Group Study @ Blandford | 989 | Hampden County | Withdrawn |
| Solar | 990 | Berkshire County | Withdrawn |
| Solar | 991 | Franklin County | Withdrawn |
| Eversource Group @ Arsene St 654 | 992 | Bristol County | Withdrawn |
| Solar + Battery | 993 | Plymouth County | Withdrawn |
| Solar + battery | 994 | Middlesex County | Withdrawn |
| Solar + Battery | 995 | Norfolk County | Withdrawn |
| Eversource Group @ Cross Rd 651 | 996 | Bristol County | Withdrawn |
| Eversource Group @ Crystal Spring 646 | 997 | Middlesex County | Withdrawn |
| Eversource Group @ Falmouth 993 | 998 | Barnstable County | Withdrawn |
| Eversource Group @ Fisher Rd Substation 657 | 999 | Bristol County | Withdrawn |
Browse Other States
AlbertaAlabamaArkansasArizonaBritish ColumbiaCaliforniaColoradoConnecticutD.C.DelawareFloridaGeorgiaIowaIdahoIllinoisIndianaKansasKentuckyLouisianaManitobaMarylandMaineMichiganMinnesotaMissouriMississippiMontanaMXNew BrunswickNorth CarolinaNorth DakotaNebraskaNew HampshireNew JerseyNew MexicoNova ScotiaNevadaNew YorkOhioOklahomaOntarioOregonPennsylvaniaQuebecRhode IslandSouth CarolinaSouth DakotaSaskatchewanTennesseeTexasUtahVirginiaVermontWashingtonWisconsinWest VirginiaWyoming
Interconnection.fyi
Tracking U.S. ISO & utility interconnection queues
Stay up to date via our email newsletter:
Interconnection queue requests/projects in list format
All transmission grid interconnection queue requests/projects All distribution grid (DG) interconnection queue requests/projects Data center projects by state EIA860 planned and operational power plant projectsInsights
Charts State of interconnection queues — January 2024In 2024, interconnection queues shrank for the first time in yearsAll blog postsOther energy & climate tools
Inflation Reduction Act Bill Text Viewer ToolClimate Tech Jobs Tracker (30,000+ jobs)Climate Tech Hiring Trends & ChartsQueue requests/projects by country
Queue requests/projects by power market
CAISO SPP PJM NYISO ERCOT ISO-NE MISO West Southeast AESO IESO Quebec Maritimes BC Manitoba Saskatchewan
Queue requests/projects by status
Active queue requests/projectsWithdrawn queue requests/projectsOperational queue requests/projectsSuspended queue requests/projectsUnknown queue requests/projects
Queue requests/projects by cluster
Queue requests/projects by U.S. state
Queue requests/projects by Canadian province
Data Centers
All data center projectsBy U.S. State
Interconnection queue requests/projects by transmission owner
Alberta Electric System OperatorAllegheny PowerAlliant Energy EastAlliant Energy WestAmeren IllinoisAmeren MissouriAmerican Electric PowerAmerican Municipal PowerAmerican Transmission CompanyAmerican Transmission SystemsArizona Public ServiceArkansas Electric Cooperative CorporationAssociated Electric CooperativeAvista UtilitiesBC HydroBaltimore Gas and ElectricBangor Hydro ElectricBasin Electric Power CooperativeBig Rivers Electric CorporationBlack Hills Cheyenne Light Fuel and Power TransmissionBlack Hills Colorado ElectricBlack Hills PowerBonneville Power AdministrationCedar Falls UtilitiesCentral Hudson Gas and ElectricCentral Maine PowerCentral Power Electric CooperativeChelan County Public Utility DistrictCity Utilities of Springfield MissouriCity Water, Light and PowerCity of Columbia, MissouriCity of Muscatine, IowaCleco HoldingsColorado River Storage Project TransmissionColorado Springs UtilitiesCommonwealth EdisonConsolidated EdisonConsumers EnergyCooperative EnergyCorn Belt Power CooperativeDCR TransmissionDairyland Power CooperativeDayton Power and LightDelmarva Power and LightDesertLinkDominion EnergyDominion Energy South CarolinaDuke EnergyDuke Energy CarolinasDuke Energy FloridaDuke Energy IndianaDuke Energy Ohio and KentuckyDuke Energy ProgressDuquesne Light CompanyEast Kentucky Power CooperativeEast River Electric Power CooperativeEast Texas Electric CooperativeEl Paso ElectricEmpire District Electric CompanyEntergyEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasEssential PowerEvergyEvergy Missouri WestEversourceEwington Energy SystemsFirstEnergyFlorida Power and LightGeorgia TransmissionGrand River Dam AuthorityGrand River EnergyGrant County Public Utility DistrictGridLianceGridLiance WestGridUnityHenderson Municipal Power and LightHoosier EnergyHorizon West TransmissionHydro-QuébecISO New EnglandITC Great PlainsITC MidwestITC TransmissionIdaho Power CompanyImperial Irrigation DistrictIndependence Power and LightIndependent Electricity System OperatorIndianapolis Power and LightJacksonville Electric AuthorityJersey Central Power and LightKACYKansas City Board of Public UtilitiesKansas City Power and LightKansas Power PoolLS PowerLS Power Grid New YorkLafayette Utilities SystemLea County Electric CooperativeLincoln Electric SystemLong Island Power Authority
Los Angeles Department of Water and PowerLouisville Gas and Electric and Kentucky Utilities EnergyLoveland Area Projects TransmissionLower Yellowstone Rural Electric CooperativeMadison Gas and ElectricMaine Public ServiceManitoba HydroMetropolitan Edison CompanyMichigan Electric Transmission CompanyMichigan Public Power AgencyMid-Kansas Electric CompanyMidAmerican EnergyMidcontinent Independent System OperatorMidwest EnergyMinnesota Municipal Power AgencyMinnesota PowerMinnkota Power CooperativeMissouri River Energy ServicesMissouri Western Energy CorporationMontana-Dakota UtilitiesMunicipal Commission of BoonvilleNAEANB PowerNV EnergyNational GridNavajo-CrystalNebraska Public Power DistrictNew York Power AuthorityNew York State Electric and GasNew York TranscoNextEra Energy TransmissionNextEra Energy Transmission SouthwestNorthWestern EnergyNortheast UtilitiesNorthern Indiana Public ServiceNorthern States Power CompanyNorthwest Iowa Power CooperativeNorthwestern Wisconsin Electric CompanyNova Scotia PowerOhio Valley Electric CorporationOklahoma Gas and ElectricOld Dominion Electric CooperativeOmaha Public Power DistrictOrange and RocklandOrlando Utilities CommissionOtter Tail Power CompanyPECO Energy CompanyPJMPPL CorporationPacifiCorpPacific Gas and Electric CompanyPennsylvania Electric CompanyPeople's Electric CooperativePlatte River Power AuthorityPortland General ElectricPotomac Electric Power CompanyPrairie PowerPublic Service Company Of ColoradoPublic Service Company of New MexicoPublic Service Electric and GasPuget Sound EnergyRochester Gas and ElectricRochester Public UtilitiesRockland Electric CompanySacramento Municipal Utility DistrictSalt River ProjectSan Diego Gas and ElectricSantee CooperSaskPowerSeminole Electric CooperativeSouth Mississippi Electric Power AssociationSouthern California EdisonSouthern CompanySouthern Illinois Power CooperativeSouthern Indiana Gas and Electric CompanySouthern Maryland Electric CooperativeSouthern Minnesota Municipal Power AgencySouthwestern Power AdministrationSouthwestern Public Service CompanySunflower Electric Power CorporationTacoma Public UtilitiesTampa Electric CompanyTennessee Valley AuthorityTransource MissouriTri-State Generation and Transmission AssociationTucson Electric PowerUnited Gas Improvement CompanyUnited Illuminating CompanyUpper Peninsula Power CompanyValley Electric AssociationVillage of ArcadeVillage of IlionWAPA Sierra NevadaWAPA/BEPC/HCPD Integrated SystemWabash Valley Power AssociationWestar EnergyWestern Area Power AdministrationWestern Area Power Administration Desert Southwest RegionWestern Farmers Electric CooperativeWisconsin Electric Power CompanyWisconsin Public Service CorporationWolverine Power Supply CooperativeXcel Energy
Interconnection queue requests/projects by year
Queue requests/projects in 2026Queue requests/projects in 2025Queue requests/projects in 2024Queue requests/projects in 2023Queue requests/projects in 2022Queue requests/projects in 2021Queue requests/projects in 2020Queue requests/projects in 2019Queue requests/projects in 2018Queue requests/projects in 2017Queue requests/projects in 2016Queue requests/projects in 2015Queue requests/projects in 2014Queue requests/projects in 2013Queue requests/projects in 2012Queue requests/projects in 2011Queue requests/projects in 2010Queue requests/projects in 2009Queue requests/projects in 2008Queue requests/projects in 2007Queue requests/projects in 2006Queue requests/projects in 2005Queue requests/projects in 2004Queue requests/projects in 2003Queue requests/projects in 2002Queue requests/projects in 2001Queue requests/projects in 2000Queue requests/projects in 1999Queue requests/projects in 1998Queue requests/projects in 1997Queue requests/projects in 1996Queue requests/projects in 1995© 2026 Interconnection.fyi. All rights reserved.