| Hydro Quebec Interconnection | 2000-001 | Ottawa | Operational |
| Thorold GS | 2000-003 | Niagara | Operational |
| Sarnia | 2000-004 | Halton | Operational |
| ENRON Canada Corp. | 2000-006 | Essex | Withdrawn |
| Mississauga | 2000-007 | Toronto | Operational |
| Brampton | 2000-008 | Toronto | Operational |
| Kirkland Lake expansion | 2000-009 | Algoma | Operational |
| AES Kingston Inc. | 2000-010 | - | Withdrawn |
| ATCO Power Limited | 2000-011 | Halton | Operational |
| KANATA Hydro Electric Commission | 2000-012 | Ottawa | Operational |
| FIVE NATIONS | 2000-015 | Algoma | Operational |
| NORTH AMERICAN PALLADIUM | 2000-016 | Kenora | Operational |
| Lake Erie | 2000-017 | Essex | Operational |
| WEYERHAEUSER Project | 2000-019 | Kenora | Operational |
| RICHMOND HILL Hydro | 2000-020 | Toronto | Operational |
| Tilbury | 2000-023 | Halton | Operational |
| VAUGHAN HYDRO | 2000-025 | Toronto | Operational |
| Jim Yarrow TS | 2000-026 | Toronto | Operational |
| Corunna Project | 2000-027 | - | Withdrawn |
| HYDRO OTTAWA | 2000-028 | Ottawa | Operational |
| IMPERIAL OIL | 2000-029 | Halton | Operational |
| CAMBRIDGE Hydro | 2000-030 | Essex | Operational |
| FORD ANNEX | 2000-031 | Halton | Operational |
| WATERLOO NORTH Hydro | 2001-032 | Essex | Operational |
| KITCHENER WILMOT Hydro | 2001-033 | Essex | Operational |
| IMPERIAL OIL | 2001-034 | Halton | Operational |
| HYDRO ONE | 2001-038 | Toronto | Operational |
| DAIMLER CHRYSLER | 2001-039 | Halton | Operational |
| Portlands Energy Centre | 2001-040 | Toronto | Operational |
| Bowater Sawmill project | 2001-042 | Kenora | Operational |
| NORTH CARIBOU LAKE FIRST NATION | 2001-044 | Kenora | Operational |
| OPG | 2001-046 | Essex | Operational |
| BRUCE POWER Inc. | 2001-047 | Bruce | Operational |
| HYDRO ONE | 2001-EX008 | Ottawa | Operational |
| HYDRO ONE | 2001-EX009 | Prescott and Russell | Operational |
| HYDRO ONE | 2001-EX011 | Niagara | Operational |
| HYDRO ONE | 2001-EX014 | Kenora | Operational |
| Winona TS | 2002-051 | Niagara | Operational |
| Dundas TS | 2002-052 | Essex | Operational |
| TORONTO HYDRO | 2002-053 | Toronto | Operational |
| MARKHAM HYDRO | 2002-054 | Toronto | Operational |
| OPG | 2002-055 | Algoma | Operational |
| Caledonia TS | 2002-056 | Essex | Operational |
| HYDRO ONE | 2002-057 | Toronto | Operational |
| Lac Seul GS | 2002-061 | Kenora | Operational |
| HYDRO ONE | 2002-062 | Ottawa | Operational |
| NIAGARA FALLS HYDRO | 2002-064 | Niagara | Operational |
| TORONTO HYDRO | 2002-065 | Toronto | Withdrawn |
| New autotransformer | 2002-066 | Halton | Operational |
| NIAGARA-ON-THE-LAKE HYDRO | 2002-067 | Niagara | Operational |
| OPG | 2002-068 | Niagara | Operational |
| High Falls GS | 2002-069 | Algoma | Operational |
| Transmission Reinforcement | 2002-070 | Algoma | Operational |
| McLEANS MOUNTAIN WINDFARM | 2002-071 | Algoma | Withdrawn |
| HYDRO ONE | 2002-072 | Halton | Operational |
| GRIMSBY Power | 2002-073 | Niagara | Operational |
| Manitoulin Island | 2002-074 | Algoma | Operational |
| ATLAS SPECIALTY Steel | 2002-075 | Niagara | Operational |
| Prince Park Wind Farm (CANCELLED) | 2002-076 | Algoma | Operational |
| Blue Highlands Wind Farm | 2002-077 | Essex | Operational |
| Gosfield | 2002-078 | Halton | Operational |
| Coldwell (Wolf/Marathon) | 2002-079 | Kenora | Withdrawn |
| Kingsbridge Wind Farm | 2002-081 | Essex | Operational |
| NORTHERN CROSS | 2002-082 | Essex | Operational |
| PLACER DOME | 2002-083 | Kenora | Operational |
| Bruce Peninsula | 2002-084 | Bruce | Operational |
| Queenston Flow West (QFW) | 2002-085 | Niagara | Operational |
| DE BEERS CANADA | 2002-086 | Algoma | Operational |
| OPG | 2002-EX017 | Essex | Operational |
| Add 115 kV circuit A12N | 2002-EX070 | Essex | Operational |
| VISION QUEST - Pine River project | 2003-087 | Bruce | Operational |
| VAUGHAN HYDRO | 2003-089 | Toronto | Operational |
| Bloomsburg TS | 2003-093 | Niagara | Operational |
| GAIA POWER INC. project | 2003-094 | Prescott and Russell | Withdrawn |
| OEFC-RFP | 2003-095 | Ottawa | Operational |
| VAUGHAN HYDRO | 2003-096 | Toronto | Withdrawn |
| Parkway TS | 2003-099 | Toronto | Operational |
| 230 kV line Parkway to Armitage | 2003-100 | Toronto | Withdrawn |
| VISION QUEST - Royal Road project | 2003-101 | Prescott and Russell | Operational |
| BORALEX INC. | 2003-102 | Toronto | Withdrawn |
| Melancthon Grey Wind Farm | 2003-103 | Essex | Operational |
| Cardiff TS | 2003-104 | Toronto | Operational |
| Lake Erie Northshore | 2003-106 | Essex | Operational |
| GTAA | 2003-107 | Toronto | Operational |
| MUMC Co-Generation | 2003-109 | Essex | Operational |
| HYDRO ONE | 2003-EX143 | Essex | Withdrawn |
| HYDRO ONE | 2003-EX145 | Essex | Operational |
| HYDRO ONE | 2003-EX148 | Ottawa | Operational |
| HYDRO ONE | 2003-EX160 | Ottawa | Operational |
| Gartshore #2 cct | 2003-EX161 | Algoma | Operational |
| Gartshore | 2003-EX173 | Algoma | Operational |
| FALCONBRIDGE | 2003-EX174 | Algoma | Operational |
| Kingston-Gardiner TS | 2003-EX176 | Prescott and Russell | Operational |
| Cameron Falls G5,G6 Refurbishment | 2003-EX179 | Kenora | Operational |
| Wolfe Island Wind Farm | 2004-111 | Prescott and Russell | Operational |
| Armitage No.3 TS | 2004-112 | Toronto | Withdrawn |
| Kingsbridge II 500 kV Connection | 2004-114 | Bruce | Withdrawn |
| Grand Bend Wind Farm | 2004-116 | Essex | Withdrawn |
| Prince Park Wind Farm | 2004-117 | Algoma | Operational |
| Kitchener Fairview GS | 2004-119 | Essex | Withdrawn |
| Tiverton Wind Farm | 2004-120 | Bruce | Withdrawn |
| Underwood WGS - Project A | 2004-121 | Bruce | Operational |
| Echo Power Wind | 2004-122 | Essex | Operational |
| Applewood Power | 2004-123 | Toronto | Withdrawn |
| Blackstone Power Project | 2004-124 | Toronto | Withdrawn |
| Ripley Wind Farm | 2004-125 | Bruce | Operational |
| Cambridge Generation MTS#1 | 2004-126 | Essex | Withdrawn |
| Umbata Falls Hydroelectric Project | 2004-128 | Kenora | Operational |
| Malahide Wind Farm | 2004-129 | Essex | Withdrawn |
| Wawatay GS Expansion | 2004-130 | Kenora | Operational |
| Southgate Wind Farm | 2004-131 | Bruce | Withdrawn |
| Providence Bay Wind Farm | 2004-132 | Algoma | Withdrawn |
| Arbour Power Biomass Generation | 2004-133 | Toronto | Withdrawn |
| Reid's Corner | 2004-134 | Bruce | Withdrawn |
| Andrews GS Excitation | 2004-136 | Algoma | Operational |
| Dryden Cogeneration | 2004-137 | Kenora | Withdrawn |
| Christian Island Wind Park | 2004-138 | Simcoe | Withdrawn |
| Simcoe Wind Farm | 2004-139 | Toronto | Withdrawn |
| Chaudiere 1 Generating Station | 2004-140 | Prescott and Russell | Withdrawn |
| Underwood WGS - Project B | 2004-143 | Bruce | Operational |
| Dunnville | 2004-144 | Niagara | Withdrawn |
| Shelburne | 2004-145 | Essex | Withdrawn |
| Lakehead Wind Park | 2004-146 | Kenora | Withdrawn |
| Pays Plat Wind Park | 2004-147 | Kenora | Withdrawn |
| Paisley Wind Park | 2004-148 | Bruce | Withdrawn |
| Michipicoten Wind Park | 2004-149 | Kenora | Withdrawn |
| Thunder Bay Wind Park | 2004-150 | Kenora | Withdrawn |
| Lowbanks Wind Farm | 2004-151 | Niagara | Withdrawn |
| Kingston CoGen GS | 2004-152 | Prescott and Russell | Withdrawn |
| Wolfe Island | 2004-153 | Prescott and Russell | Withdrawn |
| Twenty Two Degree Wind Power Generation | 2004-154 | Essex | Withdrawn |
| Yellow Falls Generation | 2004-155 | Algoma | Operational |
| Meadowvale Power Project | 2004-158 | Essex | Withdrawn |
| Dofasco Cogeneration Project | 2004-159 | Essex | Withdrawn |
| Nobel TS | 2004-160 | Simcoe | Operational |
| 115 kV Interconnection | 2004-161 | Prescott and Russell | Withdrawn |
| Bath Combined Cycle | 2004-162 | Prescott and Russell | Withdrawn |
| Newmarket Steven Court GS | 2004-166 | Toronto | Withdrawn |
| Greenfield Energy Centre | 2004-167 | Halton | Operational |
| Calpine Corbett Energy Center | 2004-168 | Toronto | Withdrawn |
| Calpine Talbot Energy Center | 2004-169 | Essex | Withdrawn |
| PPI Energy Project B | 2004-171 | Halton | Withdrawn |
| Greenfield 403 Power Plant | 2004-172 | Toronto | Withdrawn |
| Greenfield 407 Power Plant | 2004-173 | Toronto | Withdrawn |
| Algoma Steel Co-Generation Plant Study | 2004-175 | Kenora | Operational |
| 115 kV Interconnection (L5C) | 2004-176 | Prescott and Russell | Withdrawn |
| CHP Cogen Project | 2004-179 | Prescott and Russell | Operational |
| Conestogo Wind Energy Centre | 2004-181 | Essex | Withdrawn |
| Lake Shore Energy | 2004-182 | Niagara | Withdrawn |
| Bay Shore Energy | 2004-183 | Toronto | Withdrawn |
| Brampton Brick Generation | 2004-184 | Toronto | Withdrawn |
| Niagara Fallsview | 2004-185 | Niagara | Withdrawn |
| Olympic Drive | 2004-186 | Toronto | Withdrawn |
| St. Clair Energy Centre | 2004-187 | Halton | Operational |
| LSP2 Power Project | 2004-188 | Algoma | Withdrawn |
| TransAlta Co-generation Facility-Mississauga | 2004-EX187 | Toronto | Operational |
| Third Line TS New 115 kV Tie Breaker | 2004-EX208 | Algoma | Operational |
| Hollingsworth T.S. Refurbishment | 2004-EX210 | Algoma | Operational |
| Patrick St. TS Refurbishment | 2004-EX211 | Algoma | Operational |
| Stayner TS: Reinforce Transmission Facilities | 2005-190 | Essex | Operational |
| 115 Interconnection at Fort Erie | 2005-192 | Niagara | Withdrawn |
| Proton Wind Farm | 2005-193 | Bruce | Withdrawn |
| Belle River TS | 2005-194 | Halton | Operational |
| "POWERLINE" Municipal TS | 2005-196 | Essex | Operational |
| Whitby TS | 2005-198 | Toronto | Operational |
| Amherst Island Windfarm | 2005-201 | Prescott and Russell | Withdrawn |
| Greenwood TS Expansion | 2005-202 | Toronto | Operational |
| Kruger Wind Generation Station | 2005-203 | Halton | Operational |
| Trillium Wind Farm | 2005-204 | Bruce | Withdrawn |
| Great Winds | 2005-205 | Essex | Withdrawn |
| Huron Pine River Project | 2005-206 | Bruce | Withdrawn |
| Energize Second Transformers at Fort Albany TS | 2005-207 | Algoma | Operational |
| Manitoba-Ontario Inter Increase Firm Cap 400MW | 2005-208 | Kenora | Withdrawn |
| Manby TS T13/T14 Upgrade | 2005-EX221 | Toronto | Withdrawn |
| Bruce B Unit refurbishments | 2005-EX223 | Bruce | Operational |
| Caribou Falls transformer upgrade | 2005-EX239 | Kenora | Operational |
| Caribou Falls - G2 runner upgrade | 2005-EX240 | Kenora | Operational |
| Clergue GS -Unit 2 Excitation/Governor Upgrade | 2005-EX243 | Algoma | Operational |
| Installation of four new 13.8 kV feeder positions | 2005-EX245 | Essex | Operational |
| Two New 27.6 kV Feeder Positions | 2005-EX253 | Toronto | Operational |
| Decew Falls GS Governor Replacement | 2005-EX256 | Niagara | Operational |
| W42L / W43L Replacement | 2005-EX259 | Halton | Withdrawn |
| Ranney Falls Upgrade & Healey Falls GS | 2005-EX260 | Prescott and Russell | Operational |
| L25N/L27N In-Line Breakers (Nova Chemical SS) | 2005-EX261 | Halton | Operational |
| Enfield TS (Oshawa Area TS) | 2006-209 | Toronto | Operational |
| Holland TS | 2006-211 | Toronto | Operational |
| 2nd DESN at Talbot TS | 2006-212 | Essex | Operational |
| Pickering Auxiliary Power Supply | 2006-214 | Toronto | Operational |
| Cambridge Preston TS-Add 250MVA, 230/115kV Auto Tr | 2006-215 | Essex | Operational |
| White River | 2006-216 | Kenora | Withdrawn |
| Claireville TS Modification | 2006-220 | Toronto | Operational |
| Hurontario SS & 230 kV transmission extended | 2006-224 | Toronto | Operational |
| Toyota Woodstock: Install Supply Facilities | 2006-225 | Essex | Operational |
| Underground Load Addition | 2006-226 | Kenora | Operational |
| Everett TS: New Transformer Station | 2006-227 | Simcoe | Operational |
| Red Lake TS: Refurbish 115-44kV Trans Station | 2006-228 | Kenora | Operational |
| Churchill Meadows TS - New 230/44kV,75/125MVA DESN | 2006-230 | Toronto | Operational |
| Pleasant TS-Build New 230/28-28kV, 75/125MVA DESN | 2006-231 | Toronto | Operational |
| Halton Hills Generating Station | 2006-232 | Essex | Operational |
| East Windsor Cogeneration Plant | 2006-234 | Halton | Operational |
| Comber Wind Park | 2006-236 | Essex | Withdrawn |
| Spider Wind Park | 2006-237 | Algoma | Withdrawn |
| Leaside TS x Bridgeman TS: Build 1x115kV Circuit | 2006-238 | Toronto | Operational |
| Lower Mattagami Dev - Smoky Falls GS Redevelopment | 2006-239 | Algoma | Operational |
| New Power Cogeneration | 2006-240 | Toronto | Withdrawn |
| Upper Mattagami Redevelopment | 2006-241 | Algoma | Operational |
| Cyrville MTS | 2006-245 | Ottawa | Operational |
| Terminate V77R at Richview TS | 2006-246 | Toronto | Operational |
| Build Two Circuits-Hurontario SS to Jim Yarrow MTS | 2006-248 | Toronto | Operational |
| 230 kV B4V and B5V transmission uprate | 2006-249 | Bruce | Operational |
| Transmission Out of Bruce | 2006-250 | Essex | Operational |
| Enwave Energy Corp 11MW Emergency Generating Plant | 2006-251 | Toronto | Operational |
| Beck 1 G7 Conversion | 2006-252 | Niagara | Operational |
| Woodstock Area Transmission Reinforcement | 2006-253 | Essex | Operational |
| Buchanan TS - Four New Feeders | 2006-EX266 | Essex | Operational |
| Q2AH / Q5G Conductor Replacement | 2006-EX283 | Niagara | Operational |
| Restring 230 kV Circuit B3N | 2006-EX291 | Halton | Operational |
| Goderich T1 Replacement | 2006-EX292 | Essex | Operational |
| Replacement of 115 kV cable H3L | 2006-EX296 | Toronto | Operational |
| Unbundle 500 kV circuits C550V & C551V | 2006-EX297 | Toronto | Operational |
| Abitibi Canyon GS - G5 Exciter & Runner Upgrade | 2006-EX304 | Algoma | Operational |
| Replace Cecil T2 | 2006-EX309 | Toronto | Operational |
| Nanticoke G5&G6 Turbine Upgrades | 2006-EX310 | Essex | Operational |
| 3rd Line TS - T1 Replacement | 2006-EX313 | Kenora | Operational |
| Eby Rush TS - Upgrade 2 Transformers | 2006-EX314 | Essex | Operational |
| Lakeview Power | 2007-254 | Toronto | Withdrawn |
| Great Northern Tri-Gen Facility | 2007-255 | Halton | Operational |
| St. Catherines 115 kV Circuit Upgrade | 2007-257 | Niagara | Operational |
| Vansickle TS - Replace transformers | 2007-258 | Niagara | Operational |
| Timmins West Mine CTS | 2007-259 | Kenora | Operational |
| Rodney TS - 25/41 MVA, 230-27.6 kV | 2007-260 | Halton | Operational |
| Fort Chicago London District Energy Plant | 2007-261 | Halton | Operational |
| Windsor Area Transmission Reinforcement | 2007-263 | Halton | Withdrawn |
| Goreway TS-Build New 230/28-28kV, 75/125 MVA DESN | 2007-264 | Toronto | Operational |
| Replace Keith 230/115 kV Autotransformers T11&T12 | 2007-265 | Halton | Withdrawn |
| Mattagami Lake Dam Development | 2007-266 | Algoma | Withdrawn |
| Dover Wind Energy Centre | 2007-267 | Halton | Withdrawn |
| Raleigh Wind Energy Centre | 2007-268 | Halton | Operational |
| Embedded Generation Study - Multiple Stations | 2007-269 | York | Operational |
| Wikwemikong Wind Generation Facility - Site A | 2007-270 | Algoma | Withdrawn |
| North Dumfries Energy Center | 2007-272 | Essex | Withdrawn |
| Renfrew Wind Park | 2007-273 | Prescott and Russell | Withdrawn |
| Madawaska Wind Park | 2007-274 | Prescott and Russell | Withdrawn |
| Centralia-T Wind Farm | 2007-275 | Essex | Withdrawn |
| Jericho Wind Farm | 2007-276 | Essex | Withdrawn |
| Seaforth-T Wind Farm | 2007-277 | Essex | Withdrawn |
| Bornish Wind Farm | 2007-278 | Essex | Withdrawn |
| Lower Lake Hydroelectric GS | 2007-279 | Kenora | Withdrawn |
| Clarke-T Wind Farm | 2007-280 | Essex | Withdrawn |
| Windsor Energy Centre | 2007-281 | Halton | Operational |
| Kabinakagami Stns 1-6 (6x9.9MW stns connect 115kV | 2007-282 | Algoma | Withdrawn |
| Nanticoke Energy Center | 2007-283 | Essex | Withdrawn |
| STG2 | 2007-284 | Kenora | Operational |
| NAMEWAMINIKAN Hydro Project | 2007-285 | Kenora | Withdrawn |
| Parry Island Wind Farm | 2007-286 | Simcoe | Active |
| East Lake St. Clair Wind Farm | 2007-287 | Halton | Withdrawn |
| ERIEAU Wind Farm | 2007-288 | Halton | Withdrawn |
| Pointe Aux Roches (South Lake St. Clair) Wind Farm | 2007-289 | Halton | Withdrawn |
| Dover Centre Wind Farm | 2007-290 | Halton | Withdrawn |
| Byran Wind Park | 2007-291 | Prescott and Russell | Withdrawn |
| Hardwood Hills | 2007-292 | Prescott and Russell | Active |
| Adelaide Wind Energy Project | 2007-293 | Essex | Withdrawn |
| New Post Creek GS (Peter Sutherland Senior GS) | 2007-294 | Algoma | Operational |
| Decew Falls Unit 2 Upgrade | 2007-EX315 | Niagara | Operational |
| Cameron G3&G4 Runner Upgrades | 2007-EX316 | Algoma | Operational |
| Clergue GS units 1 and 3 | 2007-EX317 | Algoma | Operational |
| Wilhaven DS Upgrade | 2007-EX320 | Ottawa | Operational |
| Pinard T1 Replacement | 2007-EX325 | Algoma | Operational |
| Abitibi G3G4 Upgrades | 2007-EX326 | Kenora | Withdrawn |
| Abitibi Cayon G2&G3 Upgrades | 2007-EX329 | Kenora | Operational |
| Eagle River Mine T1 Replacement | 2007-EX334 | Algoma | Operational |
| Weston Lake DS Refurbishment | 2007-EX335 | Algoma | Operational |
| Remove idle section of L5H | 2007-EX347 | Algoma | Operational |
| T27 & T28 Transformer Replacements at Wells GS | 2007-EX352 | Algoma | Operational |
| Remove idle sections of 230 kV B20P and B24P | 2007-EX355 | Bruce | Operational |
| Remove idle section of 115 kV T2R | 2007-EX356 | Algoma | Operational |
| L1S Section Replacement | 2007-EX364 | Algoma | Operational |
| L23N, V41N and V43N phase reconfiguration | 2007-EX365 | Essex | Operational |
| Trout Lake River | 2008-296 | Kenora | Withdrawn |
| Merlin-Quinn Wind Power Project | 2008-297 | Halton | Withdrawn |
| Woodstock E. TS (Commerce Way TS) | 2008-298 | Essex | Operational |
| Kincardine II Wind Farm | 2008-301 | Bruce | Withdrawn |
| Saugeen Shores Wind Farm | 2008-302 | Bruce | Withdrawn |
| Gowganda/Elk Lake Wind Farm | 2008-304 | Algoma | Withdrawn |
| Friday Lake Wind Farm | 2008-307 | Algoma | Withdrawn |
| Thierry Mine Development | 2008-309 | Kenora | Operational |
| Erie Ontario Coke Company CGS (Erie OCC CGS) | 2008-310 | Essex | Active |
| Young-Davidson Project | 2008-312 | Algoma | Operational |
| Merlin Wind Buxton Farm | 2008-314 | Halton | Active |
| Iron Bridge GS | 2008-315 | Algoma | Withdrawn |
| Index Energy | 2008-316 | Toronto | Withdrawn |
| Windsor Area Transmission Reinforcement | 2008-318 | Halton | Operational |
| Garson Wind Farm | 2008-319 | Algoma | Active |
| Markham MTS#4 | 2008-320 | Toronto | Operational |
| Romney Wind Project | 2008-321 | Halton | Withdrawn |
| Belwood Wind Power | 2008-322 | Essex | Withdrawn |
| City Power Solution - Molson | 2008-323 | Toronto | Active |
| St. Marys Renewable Energy Centre | 2008-324 | Algoma | Withdrawn |
| Kent Centre Wind Farm | 2008-325 | Halton | Withdrawn |
| Nanticoke Wind Energy Project | 2008-326 | Essex | Withdrawn |
| New 15MW CHP Project | 2008-329 | Toronto | Active |
| Twenty Two Degree Energy | 2008-331 | Essex | Active |
| Tilbury West DS Second 115 kV Connection | 2008-332 | Halton | Operational |
| Northland GM Cogeneration Project | 2008-333 | Prescott and Russell | Withdrawn |
| Sydenham Wind Farm | 2008-334 | Halton | Withdrawn |
| Talbot Wind Farm | 2008-335 | Halton | Operational |
| Whitney Wind Farm | 2008-336 | Simcoe | Active |
| Greenwich Lake Wind Farm | 2008-337 | Kenora | Operational |
| Parkhill Wind Project | 2008-338 | Halton | Active |
| Greenbelt Solar | 2008-339 | Simcoe | Withdrawn |
| White Pines Wind Farm | 2008-340 | Prescott and Russell | Withdrawn |
| Amherst Island Wind | 2008-341 | Prescott and Russell | Withdrawn |
| Kruger Energy Peninsula Wind | 2008-342 | Kenora | Withdrawn |
| KRUGER ENERGY CHATHAM WIND FARM | 2008-343 | Halton | Operational |
| Bowater - No.6 Condensing Turbine | 2008-344 | Kenora | Operational |
| 85 MW McLeans Mountain Wind Farm | 2008-347 | Kenora | Withdrawn |
| York Energy Center | 2008-348 | Simcoe | Operational |
| Erie Shores II Wind Farm | 2008-349 | Essex | Withdrawn |
| City Power Cogen | 2008-351 | Toronto | Withdrawn |
| Wolf Island Shoals Part A | 2008-353 | Prescott and Russell | Withdrawn |
| Wolf Island Shoals Part B | 2008-354 | Prescott and Russell | Withdrawn |
| Q4N Conductor Relocation | 2008-EX406 | Niagara | Operational |
| Beck #1 G9 Rehabilitation | 2009-356 | Niagara | Operational |
| Ellwood MTS | 2009-357 | Ottawa | Operational |
| Detour Lake Project - 230 kV connection | 2009-359 | Algoma | Operational |
| Clarington #1 | 2009-363 | Toronto | Operational |
| Kitchener MTS #9 | 2009-364 | Essex | Operational |
| Pinard TS New 115 kV Switching Stn | 2009-366 | Algoma | Operational |
| Becker Co Generation | 2009-367 | - | Active |
| Northwest Transmission Expansion | 2009-368 | Kenora | Withdrawn |
| 115 kV line relocation at Williams Mine | 2009-372 | Kenora | Operational |
| Oakville Hydro MTS#1 | 2009-374 | Toronto | Operational |
| P3S refurbishment | 2009-EX422 | Prescott and Russell | Operational |
| Aubrey Falls GS - Generator upgrades | 2009-EX424 | Algoma | Operational |
| Refurbish North Bay TS | 2009-EX426 | Algoma | Operational |
| New In-Line switches on H9A | 2009-EX427 | Ottawa | Operational |
| Upgrade GT at TA Windsor | 2009-EX436 | Halton | Operational |
| New Keewatin DS | 2009-EX441 | Kenora | Operational |
| Upgrades at Transalta Mississauga | 2009-EX449 | Toronto | Operational |
| Hollingsworth G1 Stator Rewind | 2009-EX450 | Algoma | Operational |
| Guelph Hydro MTS #1 | 2010-376 | Essex | Operational |
| OAKVILLE GS | 2010-377 | Toronto | Withdrawn |
| Barwick TS | 2010-378 | Kenora | Operational |
| Terry Fox MTS | 2010-379 | Ottawa | Operational |
| Detour Lake Project - 115 kV connection | 2010-380 | Algoma | Operational |
| Comber East C24Z | 2010-381 | Halton | Operational |
| Comber West C23Z | 2010-382 | Halton | Operational |
| Pointe-Aux-Roches Wind | 2010-383 | Halton | Operational |
| Gitchi Animki Niizh (Lower White River) GS | 2010-384 | Kenora | Operational |
| Gitchi Animki Bezhig (Upper White River) GS | 2010-385 | Kenora | Operational |
| 59.4 MW McLeans Mountain Wind Farm | 2010-386 | Algoma | Operational |
| Conestogo Wind Energy Centre 1 | 2010-387 | Essex | Operational |
| Summerhaven WF | 2010-388 | Essex | Operational |
| Kabinakagami Generation Development | 2010-389 | Algoma | Withdrawn |
| Trout Lake River Small Hydro Project | 2010-390 | Kenora | Withdrawn |
| Namakan Hydropower Development - High Falls GS | 2010-391 | Kenora | Operational |
| Bow Lake Phase 1 | 2010-392 | Algoma | Operational |
| Namewaminikan Hydro project | 2010-393 | Kenora | Operational |
| Kapuskasing/Ivanhoe | 2010-394 | Algoma | Operational |
| Big Eddy GS and Half Mile Rapids GS | 2010-395 | Prescott and Russell | Withdrawn |
| Dufferin Wind Farm | 2010-396 | Essex | Operational |
| Goulais Wind Farm | 2010-397 | Algoma | Operational |
| Port Dover and Nanticoke Wind Project | 2010-398 | Essex | Operational |
| Grand Renewable Energy Park | 2010-399 | Essex | Operational |
| Big Thunder (Beta) Windpark | 2010-400 | Kenora | Operational |
| White Pines Wind Farm | 2010-401 | Prescott and Russell | Operational |
| Wolfe Island Shoals | 2010-402 | Prescott and Russell | Operational |
| Northland Power Solar Martin's Meadows | 2010-403 | Algoma | Operational |
| Liskeard Projects | 2010-404 | Algoma | Operational |
| South Kent Wind Farm | 2010-405 | Halton | Operational |
| Northland Power Solar Abitibi | 2010-406 | Algoma | Operational |
| RLGM Supply System Expansion (Balmer CTS) | 2010-407 | Kenora | Operational |
| Northland Power Solar Long Lake | 2010-408 | Algoma | Operational |
| Northland Power Solar Empire | 2010-409 | Algoma | Operational |
| KL Gold Power Supply System | 2010-410 | Algoma | Operational |
| Plateau I & II | 2010-412 | Essex | Operational |
| Long Term Viability Project | 2010-416 | Halton | Operational |
| Add transformer at Red Lake TS | 2010-417 | Kenora | Withdrawn |
| Tremaine TS | 2010-418 | Toronto | Operational |
| Musselwhite Mine - Esker | 2010-419 | Kenora | Operational |
| Green Transformation Prog., Topping Turbogen proje | 2010-420 | Kenora | Operational |
| Conestogo Wind Energy Centre | 2010-421 | Essex | Operational |
| South Branch Wind Farm | 2010-422 | Prescott and Russell | Operational |
| Ostrander Wind Farm | 2010-424 | Prescott and Russell | Withdrawn |
| Uprating of F11C/F12C | 2010-EX473 | Essex | Operational |
| Mountain Chute G1 rewind | 2010-EX481 | Prescott and Russell | Operational |
| Alexander G5 Upgrade | 2010-EX482 | Kenora | Operational |
| A6P Refurbishment Project | 2010-EX490 | Kenora | Operational |
| Increase SC ratings of 3 Bruce A breakers | 2010-EX511 | Bruce | Operational |
| LSG Bell Creek Complex Expansion | 2011-425 | Algoma | Operational |
| Pukwis Community Wind Park | 2011-426 | Simcoe | Withdrawn |
| Grand Valley Wind Farms (Phase 2) | 2011-427 | Essex | Operational |
| Offset Zone Development | 2011-428 | Kenora | Operational |
| Sumac Ridge (previously Ballyduff) Wind Farm | 2011-429 | Prescott and Russell | Operational |
| Fairview Wind Farm | 2011-430 | Simcoe | Operational |
| Redpath CHP | 2011-431 | Toronto | Operational |
| 15 MW Plant Expansion at Cardinal | 2011-432 | Prescott and Russell | Operational |
| Amherst Island | 2011-433 | Prescott and Russell | Operational |
| Erieau Wind | 2011-438 | Halton | Operational |
| East Lake St. Clair Wind | 2011-439 | Halton | Operational |
| Bluewater Wind Energy Centre | 2011-440 | Essex | Operational |
| Jericho Wind Energy Centre | 2011-441 | Essex | Operational |
| ADELAIDE WIND POWER PROJECT | 2011-442 | Halton | Operational |
| Bornish Wind Energy Centre | 2011-443 | Essex | Operational |
| Goshen Wind Energy Centre | 2011-444 | Essex | Operational |
| Cedar Point Wind Project | 2011-445 | Essex | Operational |
| Adelaide Wind Energy Centre | 2011-446 | Essex | Operational |
| Grand Bend Wind Farm (Zurich CGS) | 2011-447 | Essex | Operational |
| Grand Valley Wind Farms-Phase III | 2011-448 | Essex | Operational |
| Gunn's Hill Wind Farm | 2011-449 | Essex | Withdrawn |
| SILVERCREEK SOLAR PARK | 2011-450 | Halton | Operational |
| K2 Wind | 2011-452 | Bruce | Operational |
| Nebo TS Increase of Capacity | 2011-454 | Essex | Operational |
| Armow | 2011-455 | Bruce | Operational |
| ZEP Wind Farm Ganaraska | 2011-456 | Prescott and Russell | Operational |
| Grey Highlands Clean Energy | 2011-457 | Simcoe | Operational |
| Clean Breeze Wind Park | 2011-458 | Prescott and Russell | Withdrawn |
| Kingston Solar | 2011-459 | Prescott and Russell | Operational |
| Index Energy Mills Road Corporation | 2011-460 | Toronto | Operational |
| CRNL Class IV Power Upgrades | 2011-461 | Simcoe | Withdrawn |
| Alexander G4 rewind | 2011-EX533 | Kenora | Operational |
| Replace LP turbines at Lennox G3 | 2011-EX555 | Prescott and Russell | Operational |
| AVR Replacements at Kirkland Lake Power | 2011-EX559 | Algoma | Operational |
| B10/B11/B18H/B20H conductor replacement | 2011-EX560 | Essex | Operational |
| Upgrade LxL circuits | 2011-EX566 | Halton | Operational |
| Clarington TS | 2012-462 | Toronto | Operational |
| Limebank | 2012-463 | Prescott and Russell | Operational |
| Niagara Region Wind Farm (West Lincoln CGS) | 2012-466 | Essex | Operational |
| St. Columban 2 Wind Energy | 2012-467 | Essex | Operational |
| St. Columban 1 Wind Energy | 2012-468 | Essex | Operational |
| Osisko Hammond Gold Project | 2012-470 | Kenora | Operational |
| Victor and Capre Mines | 2012-471 | Algoma | Withdrawn |
| East Durham Wind Energy Centre | 2012-472 | Essex | Operational |
| Victoria Project | 2012-474 | Algoma | Withdrawn |
| Marathon Platinum Group Metals - Copper Project | 2012-476 | Kenora | Operational |
| Beck #1 G3 Upgrade | 2012-477 | Niagara | Operational |
| Guelph Area Transmission Refurbishment | 2012-478 | Essex | Operational |
| Festival Hydro | 2012-480 | Essex | Operational |
| Copeland (previously Bremner) TS | 2012-481 | Toronto | Operational |
| Upper Beaver Mine and Mill Complex | 2012-482 | Algoma | Withdrawn |
| Cliffs Chromite Project | 2012-484 | Algoma | Operational |
| Green Electron Power Plant | 2012-485 | Halton | Operational |
| New SS for Process Gas | 2012-488 | Algoma | Operational |
| Springpole Gold Project | 2012-489 | Kenora | Operational |
| Orleans TS | 2012-491 | Ottawa | Operational |
| Des Joachims G1, G3, G5 rewind | 2012-EX587 | Simcoe | Operational |
| Lennox Unit #4 IP Turbine Replacement | 2012-EX590 | Prescott and Russell | Operational |
| S2B tower replacement | 2012-EX599 | Algoma | Operational |
| Pine Portage G4 runner upgrade | 2012-EX610 | Kenora | Operational |
| Wells G2 - Generator Upgrades | 2012-EX633 | Algoma | Operational |
| Replace stator in Bruce G4 | 2012-EX639 | Bruce | Operational |
| New HVDS for Namakan GS | 2012-EX642 | Algoma | Withdrawn |
| Energy East Project | 2013-492 | York | Withdrawn |
| Red Lake TS Load Increase | 2013-495 | Kenora | Withdrawn |
| Black Fox Mill | 2013-496 | Algoma | Suspended |
| NRC TS | 2013-498 | Ottawa | Operational |
| Napanee Generating Station | 2013-499 | Prescott and Russell | Operational |
| Great Lakes Corridor MMLS | 2013-500 | Halton | Withdrawn |
| Rainy River Gold Project | 2013-502 | Kenora | Operational |
| Lake Erie Connector | 2013-503 | Essex | Operational |
| Mattawa DS - New 115-25 kV Distribution Station | 2013-505 | Algoma | Operational |
| Leamington TS | 2013-507 | Halton | Operational |
| Preston TS: Add 230/115 kV Autotransformer | 2013-509 | Essex | Withdrawn |
| Manby 230 kV Reconfiguration | 2013-510 | Toronto | Operational |
| Victoria Advanced Exploration Project | 2013-512 | Algoma | Operational |
| Timmins TS: EOL 115 kV Asset Replacement Project | 2013-EX645 | Algoma | Operational |
| Upgrade Thermal Loading Beck x Murray | 2013-EX648 | Niagara | Operational |
| D1A/D3A Conductor Replacement | 2013-EX656 | Niagara | Operational |
| ENBALA Load Aggregation | 2013-EX659 | - | Operational |
| C27P Conductor Replacement | 2013-EX663 | Prescott and Russell | Operational |
| C25H Conductor Replacement | 2013-EX664 | Prescott and Russell | Operational |
| H27H Conductor Replacement | 2013-EX665 | Prescott and Russell | Operational |
| H24C Conductor Replacement | 2013-EX666 | Toronto | Operational |
| Pine Portage GS Upgrade | 2013-EX672 | Kenora | Operational |
| West Windsor Power - Turbine upgrade | 2013-EX681 | Halton | Operational |
| Replace H2JK Esplanade TS x John TS | 2013-EX685 | Toronto | Operational |
| Relocation of 230 kV circuits in Manvers area | 2013-EX689 | Toronto | Operational |
| Aguasabon G2 Runner Replacement | 2013-EX690 | Kenora | Operational |
| Ontario 230 kV East-West Tie | 2014-514 | Kenora | Operational |
| Gunn's Hill Wind Farm | 2014-516 | Essex | Operational |
| Smooth Rock Falls GS Upgrade | 2014-518 | Algoma | Operational |
| Queen's Quay District Energy Centre | 2014-522 | Toronto | Operational |
| Chaudiere Hydro GS2 | 2014-526 | Ottawa | Operational |
| Turbo Generator 2 | 2014-528 | Essex | Operational |
| Windsor Solar Project | 2014-529 | Halton | Operational |
| Vaughan TS4 | 2014-530 | Toronto | Operational |
| Henvey Inlet Wind Farm - 230 kV connection | 2014-533 | Simcoe | Operational |
| Henvey Inlet Wind Farm - 500 kV connection | 2014-534 | Algoma | Withdrawn |
| Peel Energy Recovery Centre | 2014-536 | Toronto | Withdrawn |
| Borden Gold Mine | 2014-537 | Algoma | Withdrawn |
| Beck #1 G1 and G2 Conversion | 2014-538 | Niagara | Operational |
| D10S/D9HS Line Refurbishment | 2014-EX696 | Niagara | Operational |
| Norman CGS - Upgrade runners | 2014-EX697 | Kenora | Operational |
| Q11S/Q12S Line Refurbishment | 2014-EX706 | Niagara | Operational |
| Sturgeon Falls GS Runner Upgrade | 2014-EX711 | Kenora | Operational |
| Nanticoke G6 Reconnection | 2014-EX719 | Essex | Withdrawn |
| Calm Lake CGS - Unit G1 Runner Upgrade | 2014-EX732 | Kenora | Operational |
| Goreway TS - Derate V43 and V42H tap lines | 2014-EX740 | Toronto | Operational |
| Embedded Generation at Lanxess | 2014-EX749 | Halton | Operational |
| Install load interruptor switches on M20D & M21D | 2014-EX750 | Essex | Operational |
| New 230 kV In-line Breakers at Holland TS | 2015-539 | Simcoe | Operational |
| Southgate Solar | 2015-540 | Essex | Operational |
| New Limer TS | 2015-541 | Algoma | Withdrawn |
| Timmins West Mine CTS Expansion | 2015-542 | Algoma | Operational |
| Maitland Electricity from Waste Project | 2015-543 | Prescott and Russell | Withdrawn |
| Fort Frances CGS | 2015-544 | Kenora | Withdrawn |
| Seaton MTS | 2015-546 | Toronto | Operational |
| Belle River Wind Project | 2015-548 | Halton | Operational |
| Ignace Jct to Pickle Lake 230 kV Transmission Line | 2015-549 | Kenora | Operational |
| Beck #1 unit 10 Upgrade | 2015-552 | Niagara | Operational |
| Patrick Street TS Upgrade | 2015-553 | Algoma | Operational |
| Kenora CGS redevelopment project | 2015-555 | Kenora | Operational |
| JBL CTS – Add Glucose Facility | 2015-557 | Niagara | Operational |
| Domtar Espanola Mill | 2015-558 | Algoma | Operational |
| North Kent Wind 1 | 2015-559 | Halton | Operational |
| D2L Conductor Replacement | 2015-EX751 | Algoma | Operational |
| Iroquois Falls Increase aggregate generation | 2015-EX752 | Algoma | Operational |
| D7F & D9F section replacement | 2015-EX759 | Essex | Operational |
| Active Power Increase at TA Mississauga CGS | 2015-EX763 | Toronto | Withdrawn |
| T1B - Add line jumper & MSO near Red Rock CGS | 2015-EX766 | Algoma | Operational |
| Fort Frances GS Turbine Replacement | 2015-EX777 | Kenora | Withdrawn |
| Darlington GS - Add Emergency Power Generator EPG3 | 2015-EX780 | Toronto | Operational |
| Rotor rewind unit G6 at Bruce GS B | 2015-EX781 | Bruce | Operational |
| Hawthorne TS - Replace transformers T5 & T6 | 2015-EX783 | Ottawa | Operational |
| Rotor rewind unit G8 at Bruce GS B | 2015-EX784 | Bruce | Operational |
| Island Falls G3 and G4 turbine runner upgrade | 2015-EX786 | Algoma | Operational |
| Install Disconnect Switch at Carmeuse Lime | 2015-EX791 | Algoma | Operational |
| Fort Frances GS Turbine Runner Upgrade | 2015-EX804 | Kenora | Operational |
| Hanmer TS - New 230/44 kV DESN load station | 2016-560 | Algoma | Operational |
| GO Rail Electrification-Mimico and Cityview | 2016-561 | Toronto | Operational |
| New 230 kV line to Pickle Lake & 115 kV tx system | 2016-567 | Kenora | Operational |
| 230 kV East-West Tie Connection | 2016-568 | Kenora | Operational |
| Runnymede TS - Add 2nd DESN/Uprate 115 kV ccts | 2016-571 | Toronto | Operational |
| M30A/M31A Conductor Upgrade | 2016-572 | Ottawa | Operational |
| Onaping Depth Mine Project | 2016-573 | Algoma | Operational |
| Horner TS - Add second DESN station | 2016-574 | Toronto | Operational |
| GO Rail Electrification-Allandale-Burlington | 2016-575 | Simcoe | Operational |
| GO Rail Electrification-ERMF-Scarborough | 2016-576 | Toronto | Operational |
| Loyalist Solar Project (aka Stone Mills CGS) | 2016-577 | Prescott and Russell | Operational |
| Bradshaw Gold Project | 2016-579 | Algoma | Withdrawn |
| Barrie Area Transmission Reinforcement | 2016-580 | Simcoe | Operational |
| Musselwhite Mine Load Increase | 2016-581 | Kenora | Operational |
| Ramore TS - Add new transformer T2 | 2016-582 | Algoma | Withdrawn |
| Enfield TS | 2016-585 | Toronto | Operational |
| Romney Wind Energy Centre | 2016-586 | Halton | Operational |
| Eastern Fields Wind Power Project | 2016-587 | Ottawa | Withdrawn |
| Halton Hills Hydro MTS No.1 | 2016-589 | Toronto | Operational |
| Hull 2 Generation Station | 2016-590 | Ottawa | Operational |
| 1GS Generation Station | 2016-591 | Ottawa | Operational |
| Calabogie GS - Upgrade to increase capacity | 2016-592 | Prescott and Russell | Operational |
| Pendleton Solar Energy Centre | 2016-593 | Prescott and Russell | Operational |
| Nation Rise Wind Farm | 2016-594 | Prescott and Russell | Operational |
| Red Lake TS - Increase load | 2016-595 | Kenora | Operational |
| Keith TS circuits - Replace overhead sections | 2016-EX814 | Halton | Operational |
| West Windsor CGS - Capacity Increase | 2016-EX815 | Halton | Withdrawn |
| Bruce GS A - Unit G2 Rotor and Stator Replacement | 2016-EX824 | Bruce | Operational |
| DA Watson TS & & Magpie TS - 115kV Upgrade Project | 2016-EX825 | Algoma | Operational |
| Bruce GS B - Units G5 & G7 Rotor Rewinds | 2016-EX826 | Bruce | Operational |
| Beck PGS - Unit G5 Exciter Overhaul | 2016-EX828 | Niagara | Operational |
| Imperial Oil Nanticoke Utilities Reliability | 2016-EX834 | Essex | Operational |
| Calm Lake CGS – Unit G2 Runner Upgrade | 2016-EX835 | Kenora | Operational |
| Esker CTS - Synchronize Diesel Generators | 2016-EX841 | Kenora | Operational |
| H9K - Conductor Upgrade (Kapuskasing Area Reinf) | 2016-EX866 | Kenora | Operational |
| Geon CTS - Add load displacement generator | 2016-EX867 | Niagara | Operational |
| Chats Falls GS - Replace Exciters | 2016-EX870 | Prescott and Russell | Operational |
| Kirkland Lake CGS - Upgrade G3 and G5 exciters | 2016-EX885 | Algoma | Operational |
| Young Davidson CTS - Increase load | 2017-597 | Algoma | Operational |
| Rokeby CTS (formerly: Nova Corunna CTS-AST2 plant) | 2017-598 | Halton | Operational |
| New Red Lake 115 kV transmission system | 2017-601 | Kenora | Operational |
| Zurich CGS - Add a 34.5 kV reactor | 2017-603 | Essex | Operational |
| Otter Creek Wind Farm | 2017-604 | Halton | Withdrawn |
| Strong Breeze Wind Project | 2017-605 | Halton | Withdrawn |
| Red Lake TS Load Increase | 2017-607 | Kenora | Operational |
| Invista Kingston Swordfish | 2017-608 | Prescott and Russell | Operational |
| Victor Deep Mine | 2017-610 | Algoma | Operational |
| Dofasco Bayfront CTS-add new load displacement gen | 2017-612 | Niagara | Operational |
| Sky One Solar Project | 2017-613 | Simcoe | Withdrawn |
| Nanticoke Solar Project | 2017-614 | Essex | Operational |
| Bell Creek Load Increase | 2017-617 | Algoma | Operational |
| 7 Acres Agricultural Greenhouse | 2017-618 | Bruce | Operational |
| Goldcorp Century Mine | 2017-619 | Algoma | Withdrawn |
| Goldcorp Red Lake Gold Mines Generator | 2017-621 | Kenora | Operational |
| Decew Falls GS - G2 Upgrade | 2017-622 | Niagara | Operational |
| Cote Gold | 2017-623 | Algoma | Operational |
| White Pines Wind Farm | 2017-625 | Prescott and Russell | Withdrawn |
| Peace Naturals Project | 2017-626 | Simcoe | Operational |
| South Nepean MTS | 2017-627 | Ottawa | Operational |
| Lake Superior Link (East-West Tie upgrade) | 2017-628 | Kenora | Withdrawn |
| South Nepean Transmission Reinforcement | 2017-629 | Ottawa | Operational |
| West Windsor CGS - Rewind Rotor on G1 | 2017-EX893 | Halton | Operational |
| TA Dow Chemical GS(Sarnia GS)-Replace G811 exciter | 2017-EX901 | Halton | Operational |
| Bruce GS A - Upgrade SG1,2,3,4 controls | 2017-EX903 | Bruce | Operational |
| Bruce A G3 - Stator and Rotor replacement | 2017-EX920 | Bruce | Operational |
| Iroquois Falls - G2 turbine replacement | 2017-EX922 | Algoma | Operational |
| Bruce GS A - Upgrade SG1 controls | 2017-EX923 | Bruce | Withdrawn |
| GTAA - G1 and G2 AVR Upgrade | 2017-EX925 | Toronto | Operational |
| Wawatay CGS - AVR Upgrade | 2017-EX932 | Kenora | Operational |
| Chapleau DS - Load increase and transformer uprate | 2017-EX933 | Kenora | Operational |
| McMaster University Cogeneration Project | 2017-EX937 | Essex | Operational |
| Gartshore Generating Station Upgrades | 2018-630 | Kenora | Operational |
| Macassa Mine - Load Increase | 2018-631 | Algoma | Operational |
| Leamington TS #2 | 2018-633 | Halton | Operational |
| Tunis GS Upgrades | 2018-635 | Algoma | Operational |
| Double Diamond II Greenhouse | 2018-638 | Halton | Operational |
| Lake Superior Power Cogeneration Station | 2018-639 | Kenora | Operational |
| Red Rock G1 Upgrade | 2018-640 | Kenora | Operational |
| Watabeag Substation | 2018-641 | Algoma | Suspended |
| Mastron II Greenhouse | 2018-642 | Halton | Operational |
| Green Electron 2 | 2018-643 | Halton | Suspended |
| Bluewater Energy Park – BF Project | 2018-644 | Halton | Operational |
| Uplands MTS - Station Expansion | 2018-646 | Ottawa | Operational |
| Tremaine TS - New feeder breakers/Load Increase | 2018-648 | Toronto | Operational |
| Bell Creek CTS - BESS | 2018-650 | Algoma | Withdrawn |
| Transmission Line Refurbishments - Up to 120 km | 2018-653 | York | Operational |
| Upper Complex CTS | 2018-654 | Algoma | Active |
| ENWAVE LDE CHPSOP 2.0 | 2018-655 | Halton | Operational |
| Metrolinx Energy Storage Facility | 2018-656 | Toronto | Operational |
| Bayer Rubber CTS-10 MW Battery Storage Project | 2018-EX1000 | Halton | Withdrawn |
| McLeans Mountain CGS-GE Software Update | 2018-EX1004 | Algoma | Withdrawn |
| Shell Sarnia CTS-10 MW BESS | 2018-EX1005 | Halton | Operational |
| MacKay GS - RTU Replacement | 2018-EX1013 | Algoma | Withdrawn |
| Bruce GS B - IPB Cooling System Upgrade | 2018-EX1014 | Bruce | Operational |
| Cytec Welland CTS - BESS | 2018-EX1015 | Niagara | Operational |
| Cherrywood TS - Replace Breakers JL541 & WT15L541 | 2018-EX1016 | Toronto | Operational |
| Halton Hills CGS - Rotor Repair | 2018-EX1017 | Toronto | Operational |
| Nipigon GS - Governor and Protection Upgrades | 2018-EX1018 | Kenora | Operational |
| Iroquois Falls-Upgrade DCS Software | 2018-EX965 | Algoma | Withdrawn |
| RH Saunders GS-Excitation System Replacement | 2018-EX967 | Prescott and Russell | Operational |
| Pickering G5-High Pressure Turbine Upgrade | 2018-EX972 | Prescott and Russell | Operational |
| Pickering G7-High Pressure Turbine Upgrade | 2018-EX973 | Prescott and Russell | Operational |
| Bruce A - Units 1, 2 & 4 Uprate | 2018-EX977 | Bruce | Operational |
| Cameron GS - Governor controls replacement | 2018-EX984 | Algoma | Operational |
| Otter Rapids GS-G1 and G2 Governor Replacement | 2018-EX987 | Algoma | Operational |
| Bruce GS - G3-G8 Turbine Controls Upgrade | 2018-EX989 | Bruce | Operational |
| M6E/M7E Sectionalizing Disconnect Switches | 2018-EX994 | Simcoe | Operational |
| Bruce HW Plant B TS-Battery Energy Storage System | 2018-EX995 | Bruce | Operational |
| Transmission Line Refurbishments - Up to 15 km | 2018-EX997 | York | Operational |
| Kent TS - Entegrus Capacity Increase | 2019-657 | Halton | Withdrawn |
| Edgeware TS - Load Increase | 2019-658 | Halton | Operational |
| Irving Tissue Corporation - Embedded Generator | 2019-659 | Toronto | Operational |
| Hornepayne Power Inc. - Capacity Increase | 2019-660 | Kenora | Operational |
| ZEP WF and Sumac Ridge WF-Relocation to Enfield TS | 2019-661 | Toronto | Operational |
| Longwood TS - New Feeder | 2019-662 | Halton | Withdrawn |
| Under Sun Acres - Embedded Generator | 2019-663 | Halton | Operational |
| Limebank MTS - Transformer LMBT4 | 2019-665 | Ottawa | Operational |
| Lakeshore TS - Build Transformer Station | 2019-666 | Halton | Operational |
| CannAssist Line CAL1&2 Addition | 2019-667 | Prescott and Russell | Suspended |
| Atlantic Packaging CTS - Load Increase | 2019-668 | Toronto | Operational |
| Maple Leaf Foods-London Poultry - Embedded Load | 2019-670 | Halton | Operational |
| Quality Green - Embedded Load | 2019-673 | Essex | Operational |
| Kleinburg TS - Cap-Switcher Installation | 2019-EX1020 | Toronto | Operational |
| Bronte TS - T5/T6 DESN Refurbishment | 2019-EX1021 | Essex | Operational |
| Otter Rapids GS - T1 and HV Switches Replacement | 2019-EX1022 | Algoma | Operational |
| Pine Portage SS - Component Replacement | 2019-EX1023 | Kenora | Operational |
| Leaside TS - Component Replacements | 2019-EX1024 | Toronto | Operational |
| Thorold Exolon TS - Component Replacement | 2019-EX1025 | Niagara | Operational |
| Carlton TS - Refurbishment and Reconfiguration | 2019-EX1026 | Niagara | Operational |
| Niagara Stanley TS - Component Replacement | 2019-EX1027 | Niagara | Operational |
| H7L/H11L - Cable Replacement | 2019-EX1028 | Toronto | Operational |
| Andrews GS - G3 Excitation Upgrade | 2019-EX1029 | Algoma | Operational |
| Bruce GS A & B - Protective Relay Replacement | 2019-EX1030 | Bruce | Suspended |
| D6V/D7V Transmission Line Refurbishments | 2019-EX1031 | Essex | Operational |
| Darlington GS - Main Power Protection Replacement | 2019-EX1032 | Toronto | Operational |
| Lower Mattagami Stations-Protection Modifications | 2019-EX1033 | Algoma | Operational |
| Claireville TS - Component Replacements | 2019-EX1034 | Toronto | Operational |
| Bruce GS A-Replace G1&G2 Main Output Transformers | 2019-EX1035 | Bruce | Operational |
| Finch TS - T2 Replacement | 2019-EX1036 | Toronto | Operational |
| Lennox GS - Unit 2 LP Turbine Replacement | 2019-EX1037 | Prescott and Russell | Operational |
| Noranda Mines Geco CTS - Transformer Replacement | 2019-EX1038 | Kenora | Operational |
| Mattabi Mine CTS - Transformer Replacement | 2019-EX1039 | Kenora | Operational |
| King Edward TS - T3 and PCT Replacement | 2019-EX1040 | Ottawa | Operational |
| Bridgman TS - Transformer & Component Replacements | 2019-EX1041 | Toronto | Operational |
| Ford Essex CTS - Battery Energy Storage Facility | 2019-EX1042 | Halton | Operational |
| Port Colborne TS - C1P Supply | 2019-EX1043 | Niagara | Operational |
| Bruce GS B - TSS8 replacement | 2019-EX1044 | Bruce | Operational |
| Aux Sauble CGS 1 - switch 921-L replacement | 2019-EX1045 | Algoma | Operational |
| Darlington GS - MOT & UST Replacement | 2019-EX1046 | Toronto | Operational |
| Thunder Bay SS - Re-configuration | 2019-EX1047 | Kenora | Operational |
| Napanee Generating Station - T2 Replacement | 2019-EX1048 | Prescott and Russell | Operational |
| R. H. Saunders GS - G4 Exciter Rewind | 2019-EX1049 | Prescott and Russell | Operational |
| Aubrey Falls GS - Disconnect Switch Replacements | 2019-EX1050 | Algoma | Operational |
| Chats Falls GS - T10 Transformer Replacement | 2019-EX1051 | Prescott and Russell | Operational |
| Wilson TS - Cap-Switchers Installation | 2019-EX1052 | Toronto | Operational |
| Woodstock TS - Cap-Switchers Installation | 2019-EX1053 | Essex | Operational |
| Pine Portage GS-Excitation System Replacement G1-4 | 2019-EX1054 | Kenora | Operational |
| Cameron Falls GS - G1-G4 Excitation Replacement | 2019-EX1055 | Kenora | Operational |
| Gage TS - Station Refurbishment | 2019-EX1056 | Essex | Operational |
| Detweiler TS - T2 & T4 Autotransformer Replacement | 2019-EX1057 | Essex | Operational |
| Hanmer TS-Reactor R1 & R2 Protection Modification | 2019-EX1058 | Algoma | Operational |
| Hanlon TS - Station Refurbishment | 2019-EX1059 | Essex | Operational |
| St. Thomas TS - Reconfiguration of W3T W4T T11T | 2019-EX1060 | Halton | Operational |
| L7S - Modify and Install 115 kV In-line Switches | 2019-EX1061 | Essex | Operational |
| Wonderland TS - T5 Replacement | 2019-EX1062 | Halton | Operational |
| Sir Adam Beck PGS-G2, G4 & G5 Exciter Replacement | 2019-EX1063 | Niagara | Operational |
| Longwood TS - Autotransformer T4 Replacement | 2019-EX1065 | Halton | Operational |
| Keith TS - T11 & T12 Autotransformer Replacement | 2019-EX1066 | Halton | Operational |
| New or Replacement Mid-Span Openers | 2019-EX1067 | York | Operational |
| Island Falls CGS Governor Replacements | 2019-EX1068 | Algoma | Operational |
| Chatham SS - Capacitor and Breaker Replacement | 2019-EX1069 | Halton | Operational |
| Kent T1 Transformer Emergency Replacement | 2019-EX1070 | Halton | Operational |
| Essa TS - Transformer T4 Replacement | 2019-EX1071 | Simcoe | Operational |
| Abitibi Canyon GS - G3, G4 and G5 Stator Rewind | 2019-EX1072 | Algoma | Operational |
| OCWA Grand Bend CTS - High Lift Pump Replacement | 2019-EX1073 | Essex | Operational |
| Wingham TS - T1 and T2 Replacement | 2019-EX1074 | Essex | Operational |
| Scott TS - T5 and Component Replacement | 2019-EX1075 | Halton | Operational |
| Elgin TS - Capacitor Bank | 2019-EX1076 | Essex | Operational |
| Birch TS - Capacitor Bank Replacement | 2019-EX1077 | Kenora | Operational |
| Harmon GS - Transfer Trip Modifications | 2019-EX1078 | Algoma | Operational |
| Port Colborne TS - Switchyard Refurbishment | 2019-EX1079 | Niagara | Operational |
| Hydro Agri Maitland CTS - New Embedded Load | 2019-EX1080 | Prescott and Russell | Withdrawn |
| St. Marys Cement CTS - T1 Transformer Replacement | 2019-EX1081 | Essex | Operational |
| Bruce B SS - ABCB Replacement Project | 2019-EX1082 | Bruce | Operational |
| Strachan TS - A7-A8,A5-A6, & Component Replacement | 2019-EX1083 | Toronto | Operational |
| Bruce GS A - G4 Rotor Rewind | 2019-EX1084 | Bruce | Operational |
| Echo River TS - Station Re-configuration | 2019-EX1085 | Algoma | Operational |
| Wikwemikong Pellet Manufacturing Plant | 2020-676 | Algoma | Operational |
| Kirkland Lake TS - Embedded Load Macassa (Shaft 4) | 2020-677 | Algoma | Operational |
| Sudbury Area Reinforcement-X25S Circuit Unbundling | 2020-678 | Algoma | Operational |
| Richview x Trafalgar Conductor Upgrade | 2020-679 | Toronto | Operational |
| Northland Kirkland Lake CGS - Generation Line Swap | 2020-680 | Algoma | Operational |
| Macassa Mine - #4 Shaft | 2020-681 | Algoma | Suspended |
| Oneida Energy Storage | 2020-683 | Essex | Operational |
| Limer 44kV TS - Load Increase & New Equipment | 2020-686 | Algoma | Withdrawn |
| Hammond Reef Substation | 2020-687 | Kenora | Operational |
| Silver Falls - G1 Upgrades | 2020-688 | Kenora | Operational |
| Red Lake TS - Embedded Load Increase | 2020-689 | Kenora | Operational |
| New Limer TS | 2020-690 | Algoma | Withdrawn |
| Mackenzie TS- Equipment Replacement & New Facility | 2020-691 | Kenora | Operational |
| Sam Lake DS - Load Increase & New Facility | 2020-692 | Kenora | Withdrawn |
| Keith TS - J5D Telecom & Protection Upgrade | 2020-EX1086 | Halton | Operational |
| NOTL MTS 1 & NOTL DS - Transformer Replacement | 2020-EX1087 | Niagara | Operational |
| Imperial Oil Sarnia CTS - T4 Replacement | 2020-EX1088 | Halton | Operational |
| Lennox TS - ABCB Replacement Project | 2020-EX1089 | Prescott and Russell | Operational |
| Elmira TS - Capacitor SC2 Replacement | 2020-EX1090 | Essex | Operational |
| Greenfield Energy Centre CGS - G4 Controls | 2020-EX1091 | Halton | Operational |
| Steel Company of Canada CTS - Load Disp. Generator | 2020-EX1092 | Essex | Operational |
| Hanmer TS - Transformer T8 Replacement | 2020-EX1093 | Algoma | Operational |
| Marionville JCT - L2M New Disconnect Switch | 2020-EX1094 | Prescott and Russell | Operational |
| Parry Sound TS - T1, T2 & Component Replacement | 2020-EX1097 | Simcoe | Operational |
| Harmon GS - G1 & G2 Excitation System Replacement | 2020-EX1098 | Algoma | Operational |
| Tillsonburg TS - Station Refurbishment | 2020-EX1099 | Halton | Operational |
| Fort Frances MTS - Breaker Replacement | 2020-EX1101 | Kenora | Operational |
| Newton TS - Transformer T1 & T2 Replacement | 2020-EX1102 | Essex | Operational |
| DESN Station Transformer Replacements | 2020-EX1103 | York | Operational |
| C5E/C7E - Underground Cable Replacement | 2020-EX1104 | Toronto | Operational |
| Wonderland TS - Switchyard Replacement | 2020-EX1105 | Halton | Operational |
| Porcupine TS - Component Replacement | 2020-EX1106 | Algoma | Operational |
| Wawa TS - Reterminations | 2020-EX1107 | Algoma | Operational |
| Kipling GS - Excitation System Replacement | 2020-EX1108 | Algoma | Operational |
| Honda Alliston - Embedded Load Disp. Generation | 2020-EX1109 | Simcoe | Operational |
| A6P - Transmission Line Refurbishment | 2020-EX1110 | Kenora | Operational |
| Fitzroy JCT - C7BM Switch Installation | 2020-EX1111 | Prescott and Russell | Operational |
| Bruce GS A - Modify PSS Parameters | 2020-EX1112 | Bruce | Operational |
| Aguasabon GS - Excitation System Replacement | 2020-EX1113 | Kenora | Operational |
| Kirkland Lake TS - Prot. and Component Replacement | 2020-EX1114 | Algoma | Operational |
| Sault#3 - Transmission Line Refurbishment | 2020-EX1115 | Algoma | Operational |
| Prince Wind WGS - Protection Upgrade | 2020-EX1116 | Algoma | Operational |
| Copper Cliff #4 and Frood Stobie #2 - BESS | 2020-EX1117 | Algoma | Operational |
| Bruce GS B - T6 Transformer Replacement | 2020-EX1118 | Bruce | Operational |
| Wawa TS - Component Replacement | 2020-EX1119 | Algoma | Operational |
| G W Rayner GS - Breaker Replacements | 2020-EX1120 | Algoma | Operational |
| Kapuskasing TS - F1E Switch Installation | 2020-EX1121 | Algoma | Operational |
| Merivale TS - Capacitor SC11 Replacement | 2020-EX1122 | Ottawa | Operational |
| Ear Falls GS - Governor Controls Replacement | 2020-EX1123 | Kenora | Operational |
| St. Lawrence TS - PAR Replacement | 2020-EX1125 | Prescott and Russell | Operational |
| Bruce GS A - Unit Service Transformer Replacement | 2020-EX1126 | Bruce | Operational |
| Des Joachims GS - Protection Upgrade | 2020-EX1127 | Simcoe | Operational |
| A1B - Protection Upgrade | 2020-EX1128 | Kenora | Operational |
| Lennox GS - G3 Stator Rewind | 2020-EX1130 | Prescott and Russell | Operational |
| Lambton TS - Transformer & Component Replacement | 2020-EX1131 | Halton | Operational |
| Bruce GS A - G1 Rotor & Stator Rewind | 2020-EX1132 | Bruce | Operational |
| Hearn SS - Capacitor SC11 Replacement | 2020-EX1133 | Toronto | Operational |
| Bracebridge TS - New 44 kV Feeder | 2020-EX1134 | Simcoe | Operational |
| Musselwhite CSS - Breaker Replacement | 2020-EX1135 | Kenora | Operational |
| Craig JCT - New Disconnect Switch | 2020-EX1136 | Prescott and Russell | Operational |
| Iroquois Falls CTS Reconfiguration | 2020-EX1137 | Algoma | Operational |
| Price Iroquois Falls CTS - Governor Replacements | 2020-EX1139 | Algoma | Operational |
| Preston TS - Load Displacement Generation | 2020-EX1140 | Essex | Operational |
| Jim Yarrow TS - Disconnect Switch Replacements | 2020-EX1141 | Toronto | Operational |
| Seaforth TS - Transformers Replacement | 2020-EX1142 | Essex | Operational |
| Moose Lake TS - Transformer Replacement | 2020-EX1143 | Kenora | Operational |
| Bridgman TS - Equipment Replacement | 2020-EX1144 | Toronto | Operational |
| Lafarge Canada Bath CTS - BESS | 2020-EX1145 | Prescott and Russell | Operational |
| A8K-A9K Transmission Line Refurbishment and Uprate | 2020-EX1146 | Algoma | Operational |
| Dofasco Bayfront CTS - Load Increase | 2021-693 | Essex | Operational |
| Algoma Steel - New Load Facility | 2021-694 | Algoma | Operational |
| Lake Superior Power CGS-Generation Reconfiguration | 2021-695 | Algoma | Operational |
| Springpole Mine - New Load Facility | 2021-696 | Kenora | Operational |
| Steel Company of Canada CTS - Load Increase | 2021-697 | Essex | Operational |
| Bruce A TS - Station Reconfiguration | 2021-698 | Bruce | Operational |
| Lambton TS - New 230 kV Circuits | 2021-699 | Halton | Operational |
| Leamington BESS - New Energy Storage Facility | 2021-700 | Halton | Operational |
| DESN#5/6- New Transmission Stations & 230 kV Lines | 2021-701 | Halton | Suspended |
| Crawford Mine - 115 kV connection | 2021-703 | Algoma | Withdrawn |
| PUC Transmission LP - New Transmission Station | 2021-704 | Algoma | Operational |
| Resolute FP CTS - Load Increase | 2021-706 | Niagara | Operational |
| Crawford Mine – 230 kV connection | 2021-707 | Algoma | Operational |
| Kirkland Lake TS – Embedded load (Upper Beaver) | 2021-708 | Algoma | Operational |
| JBL CTS - Load Increase | 2021-709 | Niagara | Operational |
| Essex Energy Storage Project | 2021-710 | Halton | Operational |
| Detour Lake CTS – Load Increase | 2021-711 | Algoma | Operational |
| Dofasco Bayfront CTS - Decarb Project | 2021-712 | Essex | Suspended |
| Marathon TS - M2W Unbundle | 2021-713 | Kenora | Operational |
| Kleinburg TS - Embedded load (Mayfield & Airport) | 2021-714 | Toronto | Operational |
| Sir Adam Beck-1 GS - G5 Upgrades | 2021-EX1147 | Niagara | Operational |
| Esplanade TS - Circuits Replacement | 2021-EX1148 | Toronto | Operational |
| Northland Kirkland Lake CGS - Spare Transformer | 2021-EX1149 | Algoma | Operational |
| Nagagami Shekak CGS - New Disconnect Switch | 2021-EX1150 | Algoma | Operational |
| Little Long GS - Excitation System Replacement | 2021-EX1151 | Algoma | Operational |
| Algoma TS - Autotransformer Replacement | 2021-EX1152 | Algoma | Operational |
| Kingston Solar CGS - Transformer Replacement | 2021-EX1153 | Prescott and Russell | Operational |
| Caribou Falls GS - Excitation System Replacement | 2021-EX1155 | Kenora | Operational |
| Rabbit Lake SS - Component Replacement | 2021-EX1156 | Kenora | Operational |
| SIR ADAM BECK-1 GS - Disconnect Switches Replaceme | 2021-EX1157 | Niagara | Operational |
| Chats Falls GS - Component Replacement | 2021-EX1158 | Prescott and Russell | Operational |
| N21W-N22W Transmission Line Refurbishment | 2021-EX1159 | Halton | Operational |
| McMaster CTS - Load Displacement Generation | 2021-EX1160 | Essex | Operational |
| Abitibi Canyon GS - Excitation System Replacement | 2021-EX1161 | Algoma | Operational |
| Capacitor Circuit Breaker Replacements | 2021-EX1162 | Toronto | Operational |
| Imperial Oil Sarnia CTS - BESS | 2021-EX1164 | Halton | Operational |
| Frontenac TS - Capacitor Replacement | 2021-EX1165 | Prescott and Russell | Operational |
| Windsor Lauzon TS - Component Replacement | 2021-EX1166 | Halton | Operational |
| Clarke TS - Embedded BESS | 2021-EX1167 | Halton | Operational |
| JBL CTS - Load Displacement Generation | 2021-EX1168 | Niagara | Operational |
| Cytec Welland CTS - Disconnect Switch Replacement | 2021-EX1169 | Niagara | Operational |
| Manitou Falls GS - Excitation System Replacement | 2021-EX1170 | Kenora | Operational |
| Bowater Thunder Bay CTS - Switch Replacement | 2021-EX1171 | Kenora | Operational |
| Whitedog Falls SS - K4W & K5W Protection Upgrades | 2021-EX1172 | Kenora | Operational |
| Barret Chute GS - Overhaul - all units | 2021-EX1173 | Prescott and Russell | Operational |
| Nanticoke TS - T11 Autotransformer Replacement | 2021-EX1174 | Essex | Operational |
| Whitedog Falls GS - Excitation System Replacement | 2021-EX1175 | Kenora | Operational |
| Mackay GS - Protection & Excitation System Upgrade | 2021-EX1176 | Algoma | Operational |
| Batchawana TS - Component Replacement | 2021-EX1178 | Algoma | Operational |
| Goulais Bay TS - Component Replacement | 2021-EX1181 | Algoma | Operational |
| Cameron Falls GS – T1-B Transformer Replacement | 2021-EX1182 | Kenora | Operational |
| Spruce Falls CTS – Load displacement Generators | 2021-EX1183 | Algoma | Suspended |
| Bruce A – System Service Transformer Replacements | 2021-EX1185 | Bruce | Operational |
| Limer 44 kV - Load increase | 2022-715 | Algoma | Operational |
| Bowater Thunder Bay CTS - Single Point Connection | 2022-716 | Kenora | Operational |
| East Windsor Generation Facility Expansion | 2022-718 | Halton | Operational |
| Bayfield CAES Power Project | 2022-719 | Essex | Active |
| TCPL Vermillion Bay CTS - 52C Baseload Operation | 2022-720 | Kenora | Operational |
| Georgia Lake Project | 2022-721 | Kenora | Operational |
| Niagara-on-the-Lake - Cryptocurrency Connection | 2022-722 | Niagara | Operational |
| TC Energy - Pumped Storage Project | 2022-723 | Simcoe | Active |
| Richview T5/T6 - Add 4 New Feeder Breakers | 2022-724 | Toronto | Operational |
| Bermondsey TS - Add 6 New Feeder Breakers on T1/T2 | 2022-725 | Toronto | Operational |
| Windsor Stellantis TS - New DESN Station | 2022-726 | Halton | Operational |
| Darlington New Nuclear Project | 2022-727 | Toronto | Active |
| York Battery Energy Storage System | 2022-728 | Simcoe | Operational |
| Goreway BESS | 2022-729 | Toronto | Operational |
| Great Bear Resources Mine | 2022-730 | Kenora | Operational |
| Islington TS 230 kV Connection | 2022-731 | Toronto | Operational |
| Waasigan Transmission Line Project | 2022-732 | Kenora | Operational |
| Brown Hill TS - Load Increase | 2022-733 | Simcoe | Operational |
| APIROQ Capacity Increase | 2022-734 | Algoma | Operational |
| New Vaughan MTS#6 | 2022-735 | Toronto | Operational |
| Toronto Hydro Copeland TS - Stage2 | 2022-736 | Toronto | Active |
| POWER-TO-AG Phase 1 | 2022-737 | Essex | Suspended |
| Connect Darlington SMR GS to Clarington TS 230 kV | 2022-738 | - | Active |
| Southwold Lands Phase 2, 21MW | 2022-739 | Halton | Operational |
| Otter GS Various Configurations of Operations | 2022-740 | Algoma | Operational |
| Abitibi Canyon GS - T4 Replacement | 2022-EX1187 | - | Operational |
| CYTEC WELLAND CTS - MV Switchgear Replacement | 2022-EX1188 | Niagara | Operational |
| Otto Holden TS – New 115 kV station | 2022-EX1189 | Algoma | Operational |
| Darlington NGS - TGR Controls Upgrade | 2022-EX1190 | Toronto | Operational |
| Red Rock GS - G2 Upgrade | 2022-EX1191 | Algoma | Operational |
| Chalk River CTS - 115kV Mobile Substation Unit | 2022-EX1192 | Simcoe | Withdrawn |
| Transmission Circuit Line Refurbishment:A7L & R1LB | 2022-EX1193 | Kenora | Operational |
| Alexander GS - 12 kV Switchgear Replacement | 2022-EX1194 | Kenora | Active |
| Elliot Lake TS: Component Replacement | 2022-EX1196 | Algoma | Operational |
| Terrace Bay CTS - Disconnects Replacement | 2022-EX1197 | Kenora | Operational |
| West Windsor Power CGS - Synchronize G3 to the ICG | 2022-EX1198 | Halton | Operational |
| Portlands Energy Centre - STG Exciter Replacemet | 2022-EX1199 | Toronto | Operational |
| Lafarge Woodstock CTS - 115 kV Breaker Replacement | 2022-EX1200 | Halton | Operational |
| PATRICK ST TS - T6 Transformer Replacement | 2022-EX1203 | Algoma | Withdrawn |
| Essa TS: T3 and Component Replacement Project | 2022-EX1208 | Simcoe | Operational |
| Essa TS: ABCB 500kV and Component Replacement | 2022-EX1209 | Simcoe | Operational |
| Manitou Fall GS- Controls replacement | 2022-EX1210 | Kenora | Operational |
| Kashechewan 132 kV Substation Modification | 2022-EX1211 | Algoma | Operational |
| Detour Lake 230kV Risk Mitigation | 2022-EX1212 | Algoma | Operational |
| Under Sun Acres Green Energy | 2022-EX1213 | Halton | Operational |
| Hogg G.S - Electrical Upgrade | 2022-EX1214 | Algoma | Operational |
| Ear Fall GS - G2 Overhaul (Runner Replacement) | 2022-EX1215 | Kenora | Operational |
| Bruce B Main Output Transformer Replacement | 2022-EX1216 | Bruce | Operational |
| Nanticoke TS: ABCB Project | 2022-EX1217 | Essex | Operational |
| Piperville MTS | 2023-741 | Ottawa | Operational |
| Umicore TS | 2023-742 | Prescott and Russell | Withdrawn |
| Longwood to Lakeshore Single-Circuit 500 kV Line | 2023-743 | Halton | Operational |
| Oshawa Wilson TS: Additional Load | 2023-744 | Toronto | Operational |
| POWER-TO-AG Phase 2 | 2023-745 | Essex | Active |
| Napanee Energy Storage | 2023-746 | Prescott and Russell | Operational |
| Edgeware TS: Temporary Load Addition | 2023-748 | Halton | Operational |
| Hollingsworth Mine Connector | 2023-749 | Algoma | Operational |
| Sarnia Project Spectrum | 2023-750 | Halton | Withdrawn |
| Tilbury Battery Storage | 2023-751 | Halton | Operational |
| Hydrogen Ready Power Plant | 2023-752 | Halton | Operational |
| Hagersville Battery Storage | 2023-753 | Essex | Operational |
| Young Davidson CTS: Load Increase | 2023-754 | Algoma | Operational |
| Beck 2 TS: Niagara Hydrogen Centre (NHC) | 2023-755 | Niagara | Operational |
| Tower Gold Project | 2023-756 | Algoma | Suspended |
| Bioveld II: New 115 kV Station | 2023-757 | Niagara | Active |
| Belleville TS | 2023-758 | Prescott and Russell | Operational |
| Commerce TS Connection | 2023-759 | Toronto | Operational |
| Marmora Clean Energy Hub | 2023-760 | Prescott and Russell | Suspended |
| Gardiner TS: Umicore Pacman Temporary Supply | 2023-761 | Prescott and Russell | Active |
| Goliath Gold Project | 2023-762 | Kenora | Operational |
| Otter Rapid GS: G1-G4 Overhaul and Elec. Upgrade | 2023-763 | Algoma | Operational |
| McMaster CTS: Electrode Boilers | 2023-764 | Essex | Operational |
| Glendale TS: Station Refurb. & Reconfig. | 2023-765 | Niagara | Active |
| Centennial TS: New Station | 2023-766 | Halton | Operational |
| Vaughan MTS#3: Energy Storage 1 | 2023-767 | Toronto | Operational |
| Algoma Steel -EAF Project Stage 2B | 2023-768 | Algoma | Operational |
| Vaughan MTS#1: Energy Storage 1A & 1B | 2023-769 | Toronto | Operational |
| Arlen MTS: Energy Storage 1A & 1B | 2023-770 | Essex | Operational |
| Datacenters Milton-Substation | 2023-771 | Toronto | Operational |
| Cameron Falls GS - Upgrade Project | 2023-EX1218 | Kenora | Operational |
| G W Rayner GS - Excitation system upgrade | 2023-EX1219 | Algoma | Operational |
| Copeland MTS - Phase 2 - T5 | 2023-EX1220 | Toronto | Operational |
| Kipling and Harmon GS Disconnect Switch Replace. | 2023-EX1221 | Algoma | Operational |
| Hawthorne T3 Transformer Emergency Replacement | 2023-EX1222 | Ottawa | Operational |
| Windsor Cogen Generator Excitation Upgrade | 2023-EX1223 | Essex | Operational |
| Ford Oakville Assembly Complex BESS | 2023-EX1224 | Toronto | Operational |
| Transmission Circuit Line Refurbishment: K4 | 2023-EX1225 | Algoma | Operational |
| Fort Frances MTS: T1 Disconnect Switch Replacement | 2023-EX1226 | Kenora | Operational |
| Belleville TS: New feeder position | 2023-EX1227 | Prescott and Russell | Operational |
| Northland Kirkland Lake CGS: G5 Rotor Overhaul | 2023-EX1228 | Algoma | Operational |
| Middleport TS: T6 Replacement | 2023-EX1229 | Essex | Operational |
| Third Line TS: T2 Replacement | 2023-EX1230 | Algoma | Operational |
| Bruce A Unit 3 and 4 Disconnect Switch Replacement | 2023-EX1231 | Bruce | Operational |
| Chenaux GS: Main Output Transformer Phase Swap | 2023-EX1232 | Prescott and Russell | Operational |
| Falconbridge Smelter CTS: #3 Substation Upgrade | 2023-EX1233 | Algoma | Withdrawn |
| Steel Company of Canada CTS: Phase II | 2023-EX1234 | Essex | Operational |
| Blake CGS: Circuit Breaker Replacement | 2023-EX1236 | Essex | Operational |
| R. H. SAUNDERS GS: Overhaul/Runner Replacement | 2023-EX1237 | Prescott and Russell | Operational |
| St. Clair Power CGS Upgrade | 2023-EX1238 | Halton | Operational |
| Clergue GS: G1 Excitation System Upgrade | 2023-EX1239 | Algoma | Active |
| Gerdau Whitby CTS: Reactor & Capacitor Replacement | 2023-EX1240 | Toronto | Operational |
| Long Sault Rapids CGS:Exciter & Protection Upgrade | 2023-EX1241 | Algoma | Operational |
| Merivale TS Upgrade | 2023-EX1243 | Ottawa | Operational |
| Decew Falls 2 GS: G1 Overhaul and P&C Upgrade | 2023-EX1244 | Niagara | Operational |
| Beach TS: T1, T7 & T8 Replacement | 2023-EX1245 | Essex | Operational |
| York Energy Centre CGS Upgrade | 2023-EX1246 | Simcoe | Operational |
| Halton Hills CGS Uprate | 2023-EX1247 | Essex | Operational |
| Thorold GS Upgrade | 2023-EX1248 | Niagara | Operational |
| Sithe Goreway CGS Upgrade | 2023-EX1249 | Toronto | Operational |
| Bruce GS A: G1 AVR Replacement | 2023-EX1250 | Bruce | Operational |
| Copeland MTS: Phase 2 - T2 and T4 | 2023-EX1251 | Toronto | Operational |
| Island Falls CGS: AVR Replacement | 2023-EX1252 | Algoma | Operational |
| Cherrywood TS: Replace Air Blast Circuit Breakers | 2023-EX1253 | Toronto | Suspended |
| Cameron Falls: G7 Overhaul and Runner Replacement | 2023-EX1254 | Kenora | Operational |
| Longwood TS: T3 Replacement | 2023-EX1255 | Halton | Operational |
| Kitchener MTS#5: T9/T10 Transformer Replacement | 2023-EX1256 | Essex | Operational |
| Bruce A: G1 Uprate to 880MW | 2023-EX1257 | Bruce | Operational |
| Lakehead TS: C8 Condenser Replacement | 2023-EX1258 | Kenora | Operational |
| Fairbank TS: West Toronto Trans. Line Relocation | 2023-EX1259 | Toronto | Operational |
| Domtar Espanola: Increased Generation Injection | 2023-EX1260 | Algoma | Operational |
| PEC CGS: Portlands CTG Uprates | 2023-EX1261 | Toronto | Operational |
| Pickle Lake SS: New Shunt Reactors | 2023-EX1264 | Kenora | Operational |
| Chalk River CTS: 115kV Mobile Substation Unit | 2024-772 | Simcoe | Operational |
| Kleinburg TS:Prologis Humber Station Road-25.5MW | 2024-773 | Toronto | Active |
| Napanee Generating Station Expansion | 2024-774 | Prescott and Russell | Operational |
| Innerkip Wind Farm | 2024-775 | Essex | Withdrawn |
| Elora BESS | 2024-776 | Essex | Operational |
| Hedley BESS | 2024-777 | Essex | Operational |
| Pleasant TS: Tribal Dixie Road - 16.5MW | 2024-778 | Toronto | Withdrawn |
| Eagle Load Project | 2024-779 | Niagara | Operational |
| Oxford Battery Energy Storage Project | 2024-780 | Essex | Operational |
| Lennox Battery Energy Storage Project | 2024-781 | Prescott and Russell | Suspended |
| Dymond TS:Matabitchuan GS Upgrades | 2024-782 | Algoma | Operational |
| NE Bulk:230 kV Mississagi to Third Line & STATCOMS | 2024-783 | Algoma | Operational |
| Grand Energy Storage Project | 2024-784 | Essex | Withdrawn |
| Nanticoke Energy Storage Project | 2024-785 | Essex | Withdrawn |
| Red Rock DS: Red Rock Mill Development | 2024-786 | Kenora | Operational |
| Algoma Steel EAF Project-Stage 3 | 2024-787 | Algoma | Operational |
| Gasification Load Project | 2024-788 | Kenora | Operational |
| IPC New Transformer Station | 2024-789 | Simcoe | Active |
| NE Bulk:Mississagi-Hanmer Single Ckt 500kV Line | 2024-790 | Algoma | Operational |
| Spring Creek MTS | 2024-791 | Niagara | Operational |
| Walker 2 TS: Walker BESS#4,5,6 | 2024-792 | Halton | Operational |
| Trail Road BESS | 2024-793 | Prescott and Russell | Operational |
| Grey Owl Storage | 2024-794 | Bruce | Operational |
| GBE: TOR1 Data Center | 2024-795 | Essex | Operational |
| Hawthorne TS: Zero Emission Bus Project (ZEB) | 2024-796 | Ottawa | Operational |
| Hydro Road MTS: Zero Emission Bus (ZEB) project | 2024-797 | Ottawa | Active |
| Whitedog SS: Whitedog DS Relocation | 2024-798 | - | Active |
| Fitzroy BESS | 2024-799 | Prescott and Russell | Active |
| Skyview 2 Battery Energy Storage Project | 2024-800 | Prescott and Russell | Active |
| Crawford Mine – 230 kV Connection Phase 2 | 2024-801 | Algoma | Withdrawn |
| Honda Alliston ‐ E8V E9V 230kV Connection | 2024-802 | Simcoe | Active |
| Hearn TS: MCBC NRStor Toronto Battery Project | 2024-803 | Toronto | Active |
| Goreway TS: Stellantis Brampton BESS | 2024-804 | Toronto | Operational |
| Milton TS: Ontario‐Milton Data Centre (DC1) | 2024-805 | Essex | Suspended |
| Armitage TS: King Jane Industrial (Phase 2) | 2024-806 | Simcoe | Operational |
| Richmond South MTS Upgrade | 2024-807 | Ottawa | Operational |
| Anjigami TS: Louisiana Pacific Load Project- 11MW | 2024-808 | Algoma | Active |
| Project Chisel | 2024-809 | Essex | Active |
| Lambton TS: Hydrogen Production Center | 2024-810 | Halton | Active |
| Crowland TS: Welland-Thorold 230 kV Power Line | 2024-811 | Niagara | Operational |
| IBM Markham CTS - Load Increase | 2024-812 | Toronto | Operational |
| Kidd Metsite CTS - Load Increase | 2024-813 | Algoma | Active |
| St. Isidore TS: North Glengarry Energy Storage | 2024-814 | Ottawa | Operational |
| PortColborneTS:Red Jar Niagara Transformer Station | 2024-815 | Niagara | Operational |
| SSM Hybrid PV and BESS Facility | 2024-816 | Kenora | Active |
| Kakabeka GS: G1 – G2 Capacity Increase | 2024-817 | Kenora | Active |
| Palermo TS:Transformer Replacement & Load Increase | 2024-818 | Essex | Operational |
| Industrial Production Facility | 2024-819 | Essex | Active |
| Almonte TS: Almonte BESS 1 & 2 | 2024-820 | Prescott and Russell | Operational |
| Relocation of Sumac Wind Farm to Dobbin TS | 2024-821 | Prescott and Russell | Operational |
| Mer Bleue MTS | 2024-822 | Prescott and Russell | Active |
| Durham Kawartha Power Line | 2024-823 | Prescott and Russell | Active |
| LT1 Enablement Project | 2024-EX1265 | York | Operational |
| Aubrey Falls GS:GSU Transformer & Swgr Replacement | 2024-EX1268 | Algoma | Suspended |
| Carmichael Falls:Protection & Excitation Upgrade | 2024-EX1269 | Algoma | Operational |
| Aguasabon GS: G2 Stator Replacement | 2024-EX1273 | Kenora | Operational |
| Manitou Falls GS: T1 Transformer Replacement | 2024-EX1282 | Kenora | Operational |
| Keith TS: Michigan-Ontario PSR5 Replacement | 2024-EX1283 | Halton | Operational |
| Pointe Aux Roches: Reactive Power Control | 2024-EX1284 | Halton | Active |
| Buchanan x St. Thomas – M31W Reinforcement | 2024-EX1285 | Essex | Operational |
| Keith TS: Brighton Beach CGS Uprates | 2024-EX1286 | Halton | Operational |
| Kitchener 3TS: Circuit Breakers & SWG Replacement | 2024-EX1288 | Essex | Operational |
| Porcupine x Wawa Transmission Reinforcement | 2025-824 | Algoma | Active |
| Project Chisel 2 | 2025-825 | Essex | Active |
| GBE MTS #2 | 2025-826 | Essex | Operational |
| GBE – Second Distribution Supply & Load Expansion | 2025-827 | Essex | Active |
| Edgeware BESS | 2025-828 | Halton | Active |
| Alamos Gold Island-Magino DER for Load Displacement | 2025-829 | Algoma | Active |
| Bioveld 115 kV Substation: CHAR Expansion | 2025-830 | Niagara | Active |
| Agincourt TS: Data Center | 2025-831 | Toronto | Active |
| Enova #11 TS: Waterloo MTS3 Expansion | 2025-832 | Essex | Active |
| Priority 1 & Priority 2 Transformer Stations Load Increase | 2025-833 | Toronto | Active |
| Hawthorne X Orleans Transformer Reinforcement | 2025-834 | Ottawa | Active |
| Mikinak Data Center | 2025-836 | Essex | Active |
| Louisiana Pacific Load Project | 2025-837 | Kenora | Active |
| Project Rebel | 2025-838 | Toronto | Active |
| Alliston TS T2 - Load Increase | 2025-839 | Simcoe | Active |
| Scarboro TS: Data Center | 2025-840 | Toronto | Active |
| Lakeshore x Lauzon 230 kV Double-Circuit Line | 2025-841 | Halton | Active |
| Brandon Solar Project | 2025-842 | Prescott and Russell | Active |
| JBL CTS #2 | 2025-843 | Niagara | Active |
| Project Rose | 2025-844 | Niagara | Active |
| Bronte TS - Oakville Transit Bus Electrification | 2025-845 | Essex | Active |
| Gage TS: Steelport Data Center | 2025-846 | Essex | Active |
| Ramore TS - Load Increase | 2025-847 | Algoma | Active |
| EPC/PUC TransCo TS - Phase 1A | 2025-848 | Halton | Active |
| Imperial Oil Nanticoke BESS - 40 MW | 2025-850 | Essex | Active |
| Cavanagh TS - Data Center | 2025-851 | Toronto | Active |
| 'Ramore TS - Fenn-Gib Project | 2025-853 | Algoma | Active |
| CPXP Sarnia Hydrogen Facility | 2025-854 | Halton | Active |
| Belleville TS: P&G South BESS | 2025-855 | Prescott and Russell | Active |
| Richmond Hill MTS #3 | 2025-856 | Toronto | Active |
| Napanee Data Park | 2025-857 | Prescott and Russell | Active |
| Wilson TS - SMC Bowmanville BESS | 2025-858 | Toronto | Active |
| Chats Falls Expansion - G1 | 2025-859 | Prescott and Russell | Active |
| Intermarket CAM Data Center | 2025-862 | Essex | Active |
| Essex Transmission - Phase 1B | 2025-863 | Halton | Active |
| Reactor/Capacitor Switching Schemes in Northern ON | 2025-EX1289 | Algoma | Active |
| Halton Hills CGS - G1 G2 Exciter Replacement | 2025-EX1290 | Essex | Operational |
| Sir Adam Beck 2 Overhaul G11-G26 | 2025-EX1291 | Niagara | Active |
| Des Joachims T6 Replacement | 2025-EX1293 | Simcoe | Operational |
| Hoyle - Pamour Generation Synchronization | 2025-EX1294 | Algoma | Active |
| Unnamed Project | G309 | Windsor | Withdrawn |
| Unnamed Project | G441 | Sarnia | Withdrawn |